Contractor profile
JBG/FEDERAL CENTER, L.L.C.
UEIPR75MTMLKLV1
CAGE code4C4E2
Federal obligations$469,829
Prime awards13
Active awards0
Latest award actionMay 15, 2025
Federal award activity
Public award recordTop federal customers
- Department of Transportation13 awards$469,829
NAICS award mix
- 23622013 awards$469,829
PSC award mix
- Z1AA8 awards$322,870
- Z2AA2 awards$108,749
- D3191 awards$31,426
- 71951 awards$6,407
- D3181 awards$377
Contract vehicles
- DTOS5911A0000713 awards$469,829
Potential recompetes
No supported records are available yet.
Prime award history
| Award | Agency / office | Category | Value | Dates |
|---|---|---|---|---|
| 9004IGF::OT::IGF REQUEST FOR A BPA CALL AGAINST THE JBG BPA # DTOS59-11-A-00007, TO PERFORM CIRCUIT TRACING THROUGHOUT THE ENTIRE WEST BUILDING, TO INCLUDE; NEW PANEL SCHEDULES,LABELING OF SYSTEM FURNITURE FEEDS, AND IDENTIFY EXISTING FURNITURE FEED PROBLEMS. | Department of Transportation693JK4 OST | NAICS 236220PSC Z1AA | $120,000 | Dec 31, 2013 – Mar 31, 2016 |
| 9005IGF::OT::IGF - PO TO FURNISH AND INSTALL THREE HUNDRED FORTY TWO (342) FOLDING UTILITY SHELVES IN THE MENS AND WOMEN RESTROOMS AT THE USDOT HEADQUARTERS BUILDING, EAST AND WEST BUILDINGS | Department of Transportation693JK4 OST | NAICS 236220PSC Z1AA | $28,687 | May 12, 2014 – Mar 31, 2016 |
| 9007IGF::OT::IGF - FUNCTIONS: BPA CALL REQUEST | Department of Transportation693JK4 OST | NAICS 236220PSC Z2AA | $100,000 | Mar 18, 2014 – Mar 31, 2016 |
| 9017IGF::OT::IGF BPA CALL FOR AIR FLOW MODIFICATIONS AND SPACE TEMPERATURE SENSORS SERVICES, IN THE USDOT FHWA CIVIL RIGHTS OFFICE IN THE USDOT WEST BUILDING. | Department of Transportation693JK4 OST | NAICS 236220PSC Z1AA | $6,783 | Aug 6, 2014 – Mar 31, 2016 |
| 9022IGF::OT::IGF BPA CALL- FOR THE NINTH FLOOR, USDOT HQS BLDG IN WASHINGTON, D.C. - INTERNATIONAL LAW 1 D SIZE OFFICE MODIFICATION. THIS WORK INCLUDES BUT IS NOT LIMITED TO OBTAINING THE NECESSARY PERMITS, TEARING DOWN THE EXISTING OFFICE STRUCTURE, REMOVING FURNITURE, DESIGNING 1 D SIZED OFFICE SPACE, MAKING REQUIRED ELECTRICAL CHANGES TO SUPPORT THE NEW OFFICES, AND CONSTRUCTING THE OFFICES. THE WALLS FOR THE OFFICES MUST BE CONSTRUCTED TO THE EXISTING CEILING. | Department of Transportation693JK4 OST | NAICS 236220PSC Z1AA | $26,007 | Sep 17, 2014 – Mar 31, 2016 |
| 9025IGF::OT::IGF CALL ORDER NEW REPLACEMENT DOOR | Department of Transportation693JK4 OST | NAICS 236220PSC Z1AA | $31,159 | Sep 26, 2014 – Mar 31, 2016 |
| 9031IGF::CT::IGF THIS IS A CALL OFF BPA DTOS59-11-A-00007 TO FURNISH AND INSTALL ONE OLD STYLE ELECTRICAL WORKBOX, RELOCATE EXISTING CIRCUIT TO NEW LOCATION, INSTALL SWITCH NEXT TO THE DOORWAY, AND CLEAN UP THE ARE AFTER COMPLETION. | Department of Transportation693JK4 OST | NAICS 236220PSC D318 | $377 | Jun 8, 2015 – Mar 31, 2016 |
| 9032IGF::CL::IGF | Department of Transportation693JK4 OST | NAICS 236220PSC D319 | $31,426 | Jul 8, 2015 – Mar 31, 2016 |
| 9054IGF::OT::IGF - OTHER FUNCTIONS FURNISH AND INSTALL NEW BARRIER LOOPS AND TRAFFIC ARMS FOR ALL FOUR (4) LANES | Department of Transportation693JK4 OST | NAICS 236220PSC Z1AA | $90,352 | Jun 24, 2016 – Dec 31, 2016 |
| 9055IGF::OT::IGF THE PURPOSE OF MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM 3/31/2016 TO 09/30/2016. | Department of Transportation693JK4 OST | NAICS 236220PSC Z1AA | $7,980 | Aug 25, 2016 – Sep 30, 2016 |
| 9056MODIFICATION 0003-CHANGE LABOR CATEGORY | Department of Transportation693JK4 OST | NAICS 236220PSC 7195 | $6,407 | Sep 10, 2016 – Sep 30, 2016 |
| 9063IGF::OT::IGF THIS PROCUREMENT REQUEST IS TO COVER THE COST AND INSTALLATION PERIODS FOR REPLACING THE INTERNATIONAL LAW OFFICE ENTRYWAY WITH A GLASS DOOR. THE EXISTING WOODEN DOORWAY WOULD BE PLACED WITH A STANDARD ALUMINUM GLASS DOOR AND FRAME. THE EXISTING AUTOMATIC OPERATOR WOULD BE REUSED FOR THE NEW GLASS DOOR. THE NEW FRAME WOULD REQUIRE THE REWORK OF THE CARD READER AND MAGLOCKS FOR BY THE SELECTED SECURITY VENDOR. A STANDARD STENCILED SIGN IS REQUIRED FOR THE DOORWAY. THE EXISTING BACK ENTRYWAY WOULD REMAIN AS CURRENTLY BUILT. ALL HARDWARE AND PAINT FINISHES WILL MATCH THE EXISTING MATERIAL USED WITH THE DOT COMPLEX. THE MATERIALS WOULD HAVE A TIME OF 9 NINE WEEKS LEAD TIME BEFORE ARRIVING AT THE CONSTRUCTION TEAM'S WAREHOUSE. THIS ROM DOES NOT INCLUDE ANY UNFORESEEN CONSTRUCTION ENVIRONMENTS THAT MAY IMPACT THE PRICING OF THIS PROJECT. THE GLASS DOOR AND AUTOMATIC OPENER PROCUREMENT IS APPROXIMATELY SEVEN WEEKS. | Department of Transportation693JK4 OST | NAICS 236220PSC Z2AA | $8,749 | Sep 20, 2016 – Sep 30, 2016 |
Award links and obligation totals come from USAspending.gov public records.
Industries and classifications
No NAICS classifications are listed in the current registration.
Public points of contact
No named public points of contact are present in the current SAM.gov record.
Names and titles are reproduced from the public registration. FedRoster does not guess or enrich personal contact details.