Solicitation
Big Piney Office Interior Sewer Line Replacement
AGRICULTURE, DEPARTMENT OF · FOREST SERVICE · BRIDGER-TETON NATIONAL FOREST
Small Business Set Aside - TotalNAICS 237110PSC Y1NDAmended
Response deadlineSep 14, 2026
PostedAug 14, 2026
Solicitation1240LT26Q0154
Notice ID06461d780fa54ffe92bc48e578f44314
Notice typeSolicitation
Set-asideSmall Business Set Aside - Total
Place of performanceBig Piney, WY, 83113
AwardNot posted
Notice description
This project consists of replacement of the sewer line and related repair work on the Big 1.2 Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney, Wyoming. Work will include demolition of finished flooring as needed, demolition of concrete slab along 81 of sewer line, disconnection of 17 plumbing fixtures, replacement of sewer line, patching of concrete slab and replacement of aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work includes the removal and proper disposal of all demolished materials. The contractor shall provide all required materials. Quotes should describe the method that will be used to replace the sewer line, and what areas will be effected by related demolition work.
Notice and amendment history
- Solicitation · LatestPosted Aug 14, 2026 · closes Sep 14, 2026
Attachments
Select a filename to open the official SAM.gov notice and access the file.
- C04f Specs_BigPineySewer.Repair_2026.07.30.pdf928 KB
- C04e Past Performance Data Sheet.docx14 KB
- C04b Drawings_Big Piney Sewer_2026.07.30.pdf5236 KB
- C04 SF1442 1240LT26Q0154 - Final.pdf520 KB
- C04c - WD WY20260041 dtd 6-18-2026.pdf2124 KB
- C04d Experience Questionnaire_3 pages- Word Doc.docx40 KB
- C04a Schedule of Items.pdf184 KB