Scope
1.2 INSPECTION The Contractor shall inspect all materials, services, and workmanship to assure conformance with contract requirements.
AGRICULTURE, DEPARTMENT OF · AGRICULTURAL RESEARCH SERVICE · USDA ARS AFM APD
The USDA ARS is requesting quotations for the repair/replacement of a low water crossing in El Reno, OK, as a Request for Quotation. This acquisition is designated as a Total Small Business Set-Aside, with responses due by September 23, 2026. [4]
1.2 INSPECTION The Contractor shall inspect all materials, services, and workmanship to assure conformance with contract requirements.
Price: The quoter shall provide pricing as requested in the schedule of items.
Quote Submission Instructions (a) To be considered for award, quotes must be submitted by email to Spencer Hamilton at spencer.hamilton@usda.gov.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Greenwood, Mississippi March 6th, 2026 Low Water Crossing Repairs A&E Services 4325 PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 00 01 01/20 WARRANTY OF CONSTRUCTION 01 00 11 06/20 GENERAL PARAGRAPHS 01 00 21 01/20 CONTRACTOR QUALITY CONTROL 01 01 00 03/21 GENERAL REQUIREMENTS 01 33 00 08/18 SUBMITTAL PROCEDURES 01 35 26 01/20 GOVERNMENTAL SAFETY REQUIREMENTS 01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS 01 50 00 01/20 PROJECT CLOSEOUT 01 57 50 10/19 TEMPORARY ENVIRONMENTAL CONTROLS 01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS DIVISION 02 - EXISTING CONDITIONS 02 41 00 08/22 DEMOLITION DIVISION 03 - CONCRETE 03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE 03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION DIVISION 31 - EARTHWORK 31 00 00 08/23 EARTHWORK DIVISION 32 - EXTERIOR IMPROVEMENTS 32 15 00 05/17 AGGREGATE SURFACING -- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 1 Low Water Crossing Repairs A&E Services 4325 THIS PAGE INTENTIONALLY LEFT BLANK PROJECT TABLE OF CONTENTS Page 2
1.2 INSPECTION The Contractor shall inspect all materials, services, and workmanship to assure conformance with contract requirements.
Price: The quoter shall provide pricing as requested in the schedule of items.
Evaluation Method The Government will evaluate quotations based on the lowest price technically acceptable criteria.
Quote Submission Instructions (a) To be considered for award, quotes must be submitted by email to Spencer Hamilton at spencer.hamilton@usda.gov.
Set-aside: Small Business Set Aside - Total
El Reno, OK, 73036, USA
Posted Aug 31, 2026; Responses due Sep 23, 2026, 10:00 PM UTC; Archive date Oct 8, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1232SA26Q1424 is issued as a Request for Quotation (RFQ). United States Department of Agriculture (USDA), Agricultural Research Service (ARS), Grazinglands Research Laboratory in El Reno, OK, has a construction requirement to repair/replace a low water crossing. See attached Specifications and Drawings for a complete description of requirements. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238110. The small business size standard is $45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
No field-level changes were detected between related notices.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.