Scope
The experience should be projects that best demonstrate services that are similar in scope and complexity to the work described in the solicitation.
AGRICULTURE, DEPARTMENT OF · FOREST SERVICE · USDA FOREST SERVICE
This Request for Quotation (RFQ) seeks to repair and mitigate failures on the first 1.70 miles of USFS Sand Trail 229 in Cordova, AK. The work involves installing bank armoring with rip rap and placing sub grade aggregate for trail hardening. [1][4]
The experience should be projects that best demonstrate services that are similar in scope and complexity to the work described in the solicitation.
3 PRODUCT SAMPLES AND/OR SUBMITTALS The following submittals, shop drawings, material certifications and/or testing reports are required.
The following factors shall be used to evaluate quotes: (1) Pricing; (2) Past Experience and Past Performance - The evaluation will be based on each quoter’s response to the information requested in the submission instructions.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Payments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements. (d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract. (e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001. (f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default. (End of Provision) NOTICE FOR FILING AGENCY PROTESTS United States Department of Agriculture (USDA) Protest Procedures The United States Department of Agriculture (USDA) is committed to fair, transparent, and efficient acquisitions.
The experience should be projects that best demonstrate services that are similar in scope and complexity to the work described in the solicitation.
3 PRODUCT SAMPLES AND/OR SUBMITTALS The following submittals, shop drawings, material certifications and/or testing reports are required.
The following factors shall be used to evaluate quotes: (1) Pricing; (2) Past Experience and Past Performance - The evaluation will be based on each quoter’s response to the information requested in the submission instructions.
offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Set-aside: Small Business Set Aside - Total
Cordova, AK, USA
Posted Aug 31, 2026; Responses due Sep 10, 2026, 5:00 PM UTC; Archive date Oct 10, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240BJ26Q0021 is issued as a Request for Quotation (RFQ). This project is located on the Cordova Ranger District. This contract aims to repair and mitigate future failures of the USFS Sand Trail infrastructure, trail number 229. The total trail length is 12.20 miles long; this contract will only address the first 1.70 miles of failing trail. The mitigation consists of installing bank armoring with rip rap, and placing sub grade aggregate along the trail. The sub grade aggregate (3" minus) is to be placed as backfill behind the riprap and is incidental to item 201501A. Backfill quantities will vary but the end product is to have ~2-4 ft of 3" minus behind the placed riprap. The D-1 aggregate is to be placed on the trail running surface to harden the trail for ATV use. The majority of trail 229 is 6 to 8 feet in width and will require additional clearing and minor excavation depending on type of equipment used. Construction must occur during low water times of year, diversion of smaller channels within the project location will be needed to dewater bank locations. Small diversion for bank armoring is assumed to be conducted with either a dozer or excavator that may operate in the stream channel or along the stream bank. Work must be performed when there is 5 consecutive days below 30F degrees are reached This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990 Other Heavy and Civil Engineering Construction. The small business size standard is $45,000,000.00 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.