Place of performanceWenatchee, WA, 98801, United States
Opportunity summary
Source-cited
This Request for Quotation seeks improvements to trails, bridges, campgrounds, and scenic viewpoints in the North Cascades Recreation Scenic Corridor. The acquisition is set aside for small business concerns and requires quotations by the deadline. [1]
Key points
Project involves improvements to trails, bridges, and campgrounds. [1]
The solicitation is a Request for Quotation (RFQ). [1]
2025) ☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) ☐ Alternate I (May 2008) of 52.223-9 ☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☐ 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Nov 2025) ☒ 52.223-23 Sustainable Products and Services (Nov 2025) ☐ 52.224-3 Privacy Training (Jan 2017) ☐ Alternate I (Jan 2017) of 52.224-3 ☐ 52.225-1 Buy American-Supplies (Nov 2025) ☐ Alternate I (Oct 2022) of 52.225-1 ☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025) ☐ Alternate II (Nov 2025) of 52.225-3. ☐ Alternate III (Nov 2025) of 52.225-3. ☐ Alternate IV (Oct 2022) of 52.225-3 ☐ 52.225-5 Trade Agreements (Nov 2023) ☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (May 2020) ☐ 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct 2016) ☐ 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ☐ 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025) ☐ 52.229-12 Tax on Certain Foreign Procurements ☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) Selkirk to Surf Road Maintenance 1240LT26Q0115 Page 8 of 26 ☐ 52.232-30 Installment Payments for Commercial Products and Commercial Services (Nov 2021) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) ☐ 52.232-36 Payment by Third Party (Nov 2025) ☐ 52.240-92 Security Requirements (Nov 2025) ☐ Alternate II (Nov 2025) of 52.240-92 ☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Nov 2025) ☒ 52.242-13 Bankruptcy (July 1995) ☒ 52.246-21 Warranty of Construction (Mar 1994) ☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025) ☐ Alternate I (Apr 2023) of 52.247-64. ☐ Alternate II (Nov 2021) of 52.247-64 The Contractor shall comply with the following FAR Clauses for Commercial Construction.
Evaluation and Basis for Award The provision at Federal Acquisition Regulation (FAR) 52.212-2 Evaluation of Commercial Items is not applicable to this solicitation.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0115 is issued as a Request for Quotation (RFQ) for Selkirks to Surf project area; with the overall intention to make improvements to trails, bridges, campgrounds, and scenic viewpoints across the North Cascades Recreation Scenic Corridor. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The project is located within the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest, Okanogan County, Washington. To access the project from Winthrop, WA head west on SR-20 for 13.2 miles, then turn right onto Lost River Road towards Mazama, WA. In 1500 ft, at the stop sign and junction with Goat Creek Road, stay left (northwest) on Lost River Road and proceed 6.8 miles to Beginning of Project (BOP) at MP 0.00 of FSR 5400 Harts Pass Road. BOP of FSR 5400600 Slate Peak Road is at end termini of FSR 5400. Questions shall be submitted via email to christopher.malley@usda.gov and are due no later than September 7, 2026, at 1:00 PM Pacific Time. All proposals shall be emailed to the Contract Specialist christopher.malley@usda.gov and pps.proposals@usda.gov no later than September 14, 2026, 1:00 PM Pacific Time.
What changed
No field-level changes were detected between related notices.