Big Piney Office Interior Sewer Line Replacement

Solicitation number1240LT26Q0154

AGRICULTURE, DEPARTMENT OF · FOREST SERVICE · BRIDGER-TETON NATIONAL FOREST

View opportunity on SAM.gov ↗
Response deadlineSep 14, 2026, 11:00 PM UTC
Deadline status11 days remaining
PostedSep 1, 2026
Record refreshedSep 2, 2026
Place of performanceBig Piney, WY, 83113, United States

Opportunity summary

Source-cited

This solicitation is for the replacement of the sewer line and related repair work at the Big Piney Ranger Station in Wyoming. The project requires demolition, fixture disconnection/reconnection, and flooring replacement, with a response deadline of September 14, 2026. [2]

Key points

  • Work includes sewer line replacement and related demolition. [2]
  • The opportunity is set aside for Small Businesses. [2]

Watch items

  • Estimated performance period is November 2026 to January 2027. [1]
  • Contractor must provide all required materials. [2]

Sources

  1. C04+SF1442+1240LT26Q0154+-+Final.pdfPeriod of Performance Estimated Start Date: 11/01/2026 – 01/29/2027 Site Visit: Optional Evaluation and Basis for Award The provision at FAR 52.212-2, Evaluation—Commercial Products and Commercial Services is not applicable to this solicitation.
  2. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

Payments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements. (d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract. (e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001. (f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default. (End of Provision) NOTICE FOR FILING AGENCY PROTESTS United States Department of Agriculture (USDA) Protest Procedures Big Piney Office Interior Sewer Line Replacement 1240LT26Q154 Page 26 of 27 The United States Department of Agriculture (USDA) is committed to fair, transparent, and efficient acquisitions.

Scope

Big Piney Office Interior Sewer Line Replacement 1240LT26Q154 Page 8 of 27 ☐ 52.229-12 Tax on Certain Foreign Procurements ☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) ☐ 52.232-30 Installment Payments for Commercial Products and Commercial Services (Nov 2021) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) ☐ 52.232-36 Payment by Third Party (Nov 2025) ☐ 52.240-92 Security Requirements (Nov 2025) ☐ Alternate II (Nov 2025) of 52.240-92 ☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Nov 2025) ☐ 52.242-13 Bankruptcy (July 1995) ☒ 52.246-21 Warranty of Construction (Mar 1994) ☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025) ☐ Alternate I (Apr 2023) of 52.247-64. ☐ Alternate II (Nov 2021) of 52.247-64 The Contractor shall comply with the following FAR Clauses for Commercial Construction.

Deliverables

Section Section Title Subsec- tion Required Submittal C General Specifications 1.4A Traffic Control Plans 013300 Submittal Procedures 2.1D Construction Schedule 014100 Quality Control 1.2 B Contractor Quality Control Plan 014000 Quality Control 1.2C Daily Reports 014100 Quality Control 1.3 D Logs 014100 Quality Control 1.3 E/F Test and inspection reports 014100 Quality Control 1.3 G As-Built drawings 014100 Quality Control 1.3H Permits, Licenses and Certificates 017320 Selective Demolition 1.4A Schedule 017700 Closeout Procedures 1.2A Product Data 017700 Closeout Procedures 1.2B First Punchlist 017700 Closeout Procedures 1.2C Final Punchlist 017700 Closeout Procedures 1.3A Maintenance Materials 033000 Cast In Place Concrete 1.3A Product Data 033000 Cast In Place Concrete 1.3B Design Mixture 033000 Cast In Place Concrete 1.3C Shop Drawings 033000 Cast In Place Concrete 1.3D Reports 061000 Rough Carpentry 1.3A Product Data 061000 Rough Carpentry 1.4A Material Certs 061000 Rough Carpentry 1.4B Eval Reports 081416 Flush Wood Doors 1.2A Product Data 081416 Flush Wood Doors 1.2B Shop Drawings 083113 Access Doors and Frames 1.2A Product Data 087100 Door Hardware 1.2A Product Data 087100 Door Hardware 1.2B Shop Drawings 087100 Door Hardware 1.2C Door Hardware Schedule 092900 Gypsum Board 1.2A Product Data 093000 Tiling 1.2A Product Data 093000 Tiling 1.2B Samples 096500 Rubber Sports Floor 1.2A Action Submittals 096500 Rubber Sports Floor 1.2B Closeout Submittals096513 096513 Resilient Base and Accessories 1.2A Product Data 096513 Resilient Base and Accessories 1.2B Sustainable Design Submittals 096513 Resilient Base and Accessories 1.2C Samples 096519 Resilient Tile Flooring 1.2A Product Data 096519 Resilient Tile Flooring 1.2B Samples 096519 Resilient Tile Flooring 1.2C Sustainable Submittals 099123 Interior Painting 1.3A Product Data

Evaluation

Period of Performance Estimated Start Date: 11/01/2026 – 01/29/2027 Site Visit: Optional Evaluation and Basis for Award The provision at FAR 52.212-2, Evaluation—Commercial Products and Commercial Services is not applicable to this solicitation.

Submission

The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

This project consists of replacement of the sewer line and related repair work on the Big 1.2 Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney, Wyoming. Work will include demolition of finished flooring as needed, demolition of concrete slab along 81' of sewer line, disconnection of 17 plumbing fixtures, replacement of sewer line, patching of concrete slab and replacement of aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work includes the removal and proper disposal of all demolished materials. The contractor shall provide all required materials. Quotes should describe the method that will be used to replace the sewer line, and what areas will be effected by related demolition work.

What changed

Sep 1, 2026 · 2 fields changed
Response deadline2026-09-14T11:00:00+00:002026-09-14T23:00:00+00:00
Documents78

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.