Scope
Comply with the requirements of Section 230500, "Transitions and Offsets Beyond the Scope of Work".
AGRICULTURE, DEPARTMENT OF · ANIMAL AND PLANT HEALTH INSPECTION SERVICE · MRPBS MINNEAPOLIS MN
The Consultant and/or Owner will not be providing air monitoring services to meet these OSHA requirements.
Comply with the requirements of Section 230500, "Transitions and Offsets Beyond the Scope of Work".
Schedule submittals according to general flow of Work and so as to allow for adequate and timely review of submittals by Consultant.
ICC-ES evaluation report for fastener.
Review submittals prior to submission and submit to Consultant in accordance with provisions herein.
Set-aside: Small Business Set Aside - Total
Edinburg, TX, 78541, USA
Posted Sep 2, 2026; Responses due Sep 9, 2026, 5:00 PM UTC; Archive date Sep 24, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
The Science and Technology Mission Lab's Arthropod Quarantine (AQ) Facility is a high security containment facility intended to support biological control programs, new insect strain developments, and invasive species testing. The facility consists of an AQ office, receiving lab, identification lab, three other laboratories, three main hallways, twelve walk-in environmental growth chambers (EGCs), two EGC walkways, a headhouse/potting area adjacent to five separately controlled greenhouses, extended greenhouse foyer, a pot and clothing washing area, storage area, lunchroom, emergency exit room, secured-access exterior autoclave room, interior autoclave room, separate male & female dressing rooms with showers, bathrooms, ante-room, sign-in room, and foyer. The facility needs major renovation. The project will upgrade mechanical, electrical, and plumbing systems and refresh interior finishes. Site visit attendance sheet is posted below. RFIs and Responses, and amendment 1 with its attachments are posted below. More RFIs and responses posted below. Amendment 2 and its atttachments are posted below, along with an updated RFI log. An asbestos survey is being conducted and results will be posted next week. Amendment 3 is posted below. Amendment 4 is posted below, along with the first asbestos test results. More test results are forthcoming and will be posted here. Amendment 5 and its atttachments are posted below.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.