Place of performanceRoosevelt, AZ, 85545, United States
Opportunity summary
Source-cited
The USDA-FS CSA SOUTHWEST 7 is seeking repairs for leaks in the Tonto National Forest's drinking water network in Roosevelt, AZ. The scope includes repairing secondary pipe leaks and installing specific valves, with as-built drawings required upon completion. [2][1]
Key points
Project involves repairing leaks in the drinking water network. [1]
Contractor must provide as-built drawings to the Forest Service. [1]
127EAX26Q0087+TBRD+Water+Leak+Repair.pdfPayments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements. (d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract. (e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the
127EAX26Q0087+TBRD+Water+Leak+Repair.pdfThe four (4) documents detailed within “Required Proposal Submission Documents” shall be submitted as separate Adobe PDF documents.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sources
Payments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements. (d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract. (e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001. (f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default. (End of Provision) NOTICE FOR FILING AGENCY PROTESTS United States Department of Agriculture (USDA) Ombudsman Program The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner.
Tonto Basin Ranger District (TBRD) Water Leak Repairs 127EAX26Q0087 Page 7 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025) The following clauses are applicable: 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) 52.204-13 System for Award Management—Maintenance (Nov 2025) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) 52.219-6 Notice of Total Small Business Aside (Nov 2025) 52.219-8 Utilization of Small Business Concerns (Nov 2025) 52.222-3 Convict Labor (June 2003) 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) 52.222-35 Equal Opportunity for Veterans (Nov 2025) 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025) 52.222-37 Employment Reports on Veterans (Nov 2025) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (Nov 2025) 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) 52.223-23 Sustainable Products and Services (Nov 2025) 52.225-1 Buy American-Supplies (Nov 2025) Alternate I (Oct 2022) of 52.225-1 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) The Contractor shall comply with the following FAR Clauses for Commercial Construction: 52.222-6 Construction Wage Rate Requirements 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-9 Apprentices and Trainees 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination-Debarment 52.222-14 Disputes Concerning Labor Standards 52.222-15 Certificate of Eligibility 52.236-5 Material and Workmanship
To verify the Contractor’s entitlement to progress payments under this contract, the Contractor shall provide the Government, upon request and during normal business hours, access to the following: (1) Records and Documentation: (i) Certified progress payment requests and supporting documentation; (ii) Subcontractor and supplier invoices, payment records, and lien waivers; (iii)Updated schedule of values and progress schedules; (iv)Quality assurance and inspection reports; (v) Payroll records, if applicable under labor provisions. (2) Facilities and Worksite Access: (i) Physical access to the construction site for inspection of work progress; (ii) Access to off-site storage locations for materials billed but not yet incorporated into the work; or (iii)Access to any fabrication facilities where contract-related work is being performed.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
Amendment 0001 - The purpose of this amendment is to attach the Questions and Answers and Site Visit Sign-In Sheet. This amendment also attaches an updated Schedule of Items, Attachment 5. Quote Due Date has not changed. The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks. At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service. Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop. After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape. The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future. The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project. The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.
What changed
Sep 1, 2026 · 2 fields changed
DescriptionThe Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks. At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service. Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop. After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape. The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future. The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project. The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.Amendment 0001 - The purpose of this amendment is to attach the Questions and Answers and Site Visit Sign-In Sheet. This amendment also attaches an updated Schedule of Items, Attachment 5. Quote Due Date has not changed. The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks. At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service. Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop. After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape. The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future. The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project. The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.DocumentsNot previously reported11