Forest Wide Well Decom

Solicitation number127EAX26Q0091

AGRICULTURE, DEPARTMENT OF · FOREST SERVICE · USDA-FS, CSA SOUTHWEST 7

View opportunity on SAM.gov ↗
Response deadlineSep 23, 2026, 6:00 PM UTC
Deadline status20 days remaining
PostedAug 28, 2026
Record refreshedSep 2, 2026
Place of performancePrescott, AZ, 86305, United States

Opportunity summary

Source-cited

This USDA-FS opportunity requires furnishing all necessary resources to abandon wells across the PNF and close septic tanks. The response deadline for quotes is September 23, 2026, and it is designated as a Small Business Set Aside. [1][3]

Key points

  • Scope includes abandoning wells and closing septic tanks. [1]
  • Small Business Set Aside - Total designation. [3]

Watch items

  • Site visit is scheduled for September 9, 2026. [3]
  • Progress payments require providing various records upon request. [2]

Sources

  1. Attachment+1+-+Statement+of+Work.pdf8 | P a g e 2.0 PROJECT SCOPE 2.1 SCOPE OF WORK The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to abandon wells across the PNF, and close septic tanks, in accordance with the drawings, specifications, and other attachments referenced and contained herein.
  2. 127EAX26Q0091+Forest+Wide+Well+Decom.pdfTo verify the Contractor’s entitlement to progress payments under this contract, the Contractor shall provide the Government, upon request and during normal business hours, access to the following: (1) Records and Documentation: (i) Certified progress payment requests and supporting documentation; (ii) Subcontractor and supplier invoices, payment records, and lien waivers; (iii)Updated schedule of values and progress schedules; (iv)Quality assurance and inspection reports; (v) Payroll records, if applicable under labor provisions. (2) Facilities and Worksite Access: (i) Physical access to the construction site for inspection of work progress; (ii) Access to off-site storage locations for mat
  3. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

Forest-Wide Well and Septic Tank Decommissioning 127EAX26Q0091 Page 21 predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements. (d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract. (e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001. (f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default. (End of Provision) NOTICE FOR FILING AGENCY PROTESTS United States Department of Agriculture (USDA) Ombudsman Program The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner.

Scope

8 | P a g e 2.0 PROJECT SCOPE 2.1 SCOPE OF WORK The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to abandon wells across the PNF, and close septic tanks, in accordance with the drawings, specifications, and other attachments referenced and contained herein.

Deliverables

To verify the Contractor’s entitlement to progress payments under this contract, the Contractor shall provide the Government, upon request and during normal business hours, access to the following: (1) Records and Documentation: (i) Certified progress payment requests and supporting documentation; (ii) Subcontractor and supplier invoices, payment records, and lien waivers; (iii)Updated schedule of values and progress schedules; (iv)Quality assurance and inspection reports; (v) Payroll records, if applicable under labor provisions. (2) Facilities and Worksite Access: (i) Physical access to the construction site for inspection of work progress; (ii) Access to off-site storage locations for materials billed but not yet incorporated into the work; or (iii)Access to any fabrication facilities where contract-related work is being performed. (3) Access to electronic invoicing or project management systems used to track progress and payments, if such systems are used in contract performance. (f) Dates for payment.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to abandon wells across the PNF, and close septic tanks, in accordance with the drawings, specifications, and other attachments referenced and contained herein. Key Dates: Site visit - 9/9/2026 at 10:00AM Local Time Q&A's Due - 9/14/2026 by 1:00PM Central Daylight Time Quote Due Date - 9/23/2026 by 1:00PM Central Daylight Time

What changed

No field-level changes were detected between related notices.

Notice history