Scope
8.0 Security Requirements Contractor shall maintain a log of all contractor personnel names working onsite throughout the project.
AGRICULTURE, DEPARTMENT OF · FARM PRODUCTION AND CONSERVATION BUSINESS CENTER · FPAC BUS CNTR-ACQ DIV
This Request for Quote (RFQ) seeks contractors for greenhouse repairs, electrical upgrades, and foundational work at the Norman A. Berg Plant Materials Center in Beltsville, MD. The magnitude of construction is between $25,000 and $100,000, and it is set aside for small businesses. [3]
Solicitation Number: 12FPC326Q0048 Page 12 of 32 H - SPECIAL CONTRACT REQUIREMENTS 52.236-13 Accident Prevention. (DEVIATION Jul 2025) (a) The Contractor shall provide and maintain work environments and procedures that— (1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities; (2) Avoid interruptions of Government operations and delays in project completion dates; and (3) Control costs in the performance of this contract. (b) In addition, for contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall— (1) Provide appropriate safety barricades, signs, and signal
4.0 Deliverable / Schedule Reporting Requirements: The contractor is required to provide written progress reports by email weekly for the project duration.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Solicitation Number: 12FPC326Q0048 Page 12 of 32 H - SPECIAL CONTRACT REQUIREMENTS 52.236-13 Accident Prevention. (DEVIATION Jul 2025) (a) The Contractor shall provide and maintain work environments and procedures that— (1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities; (2) Avoid interruptions of Government operations and delays in project completion dates; and (3) Control costs in the performance of this contract. (b) In addition, for contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall— (1) Provide appropriate safety barricades, signs, and signal lights; (2) Comply with the standards issued by the Secretary of Labor at 29 CFR part 1926 and 29 CFR part 1910; and (3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken. (c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S.
8.0 Security Requirements Contractor shall maintain a log of all contractor personnel names working onsite throughout the project.
4.0 Deliverable / Schedule Reporting Requirements: The contractor is required to provide written progress reports by email weekly for the project duration.
Solicitation Number: 12FPC326Q0048 Page 35 of 32 M – EVALUATION FACTORS FOR AWARD Basis for Award Award will be made to the offeror whose offer is most advantageous to the Government based on the factors below.
Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/?q=browsefar (End of provision) Solicitation Number: 12FPC326Q0048 Page 34 of 32 Quote Submission Instructions To be considered for award, offerors are requested to submit the following: 1.
Set-aside: Small Business Set Aside - Total
Beltsville, MD, USA
Posted Aug 24, 2026; Responses due Sep 6, 2026, 6:00 PM UTC; Archive date Sep 21, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
The Norman A. Berg Plant Materials Center facilities need repairs and upgrades. The center requires a newelectrical hookup for a lab trailer and electrical upgrades for the two greenhouses (indicated as North Greenhouse and South Greenhouse) and the upper garage. Both greenhouses require foundational repairs and re-parging. One greenhouse requires a commercial grade greenhouse door replacement. SITE VISIT: Interested vendors can review the work site by attending the Site Visit on August 25, 2026, at 10:00am. Site Visit Location: 8791 Beaver Dam Road, Beltsville MD 20705 Site Visit POC: Dan Dusty; Farm Manager at dan.dusty@usda.gov, 301-289-9776. Responses are due by 2:00 p.m. ET on September 16, 2026 by email to Bobby Copenny, II, Contract Specialist, at bobby.copenny@usda.gov. This is a request for quote (RFQ) solicited using the simplified acquisition procedures of FAR Part 13. Contractors are strongly urged to attend the site showing. The contractor shall furnish all labor, materials, equipment and supervision required to construct the project at outlined in statement of work and detailed in the specifications, drawings, and plans attached hereto. The magnitude of construction is between $25,000 and $100,000. This acquisition is 100% set-aside for small businesses. The applicable NAICS code is 238990.
No field-level changes were detected between related notices.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.