Scope
8.0 Security Requirements Contractor shall maintain a log of all contractor personnel names working onsite throughout the project.
AGRICULTURE, DEPARTMENT OF · FARM PRODUCTION AND CONSERVATION BUSINESS CENTER · FPAC BUS CNTR-ACQ DIV
This Request for Quotation seeks repairs to the evaporative cooling wall of a greenhouse at the E. "Kika" de la Garza Plant Material Center in Kingsville, TX. The acquisition is set aside for small business concerns, with quotations due by September 9, 2026. [4]
8.0 Security Requirements Contractor shall maintain a log of all contractor personnel names working onsite throughout the project.
4.0 Deliverable / Schedule x Reporting Requirements: The contractor is required to provide written progress reports by email weekly for the project duration.
Evaluation Method: The Government will evaluate quotations based on the lowest price technically acceptable criteria.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Payments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements. (d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract. (e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001. (f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default. (End of Provision) NOTICE FOR FILING AGENCY PROTESTS United States Department of Agriculture (USDA) Protest Procedures The United States Department of Agriculture (USDA) is committed to fair, transparent, and efficient acquisitions.
8.0 Security Requirements Contractor shall maintain a log of all contractor personnel names working onsite throughout the project.
4.0 Deliverable / Schedule x Reporting Requirements: The contractor is required to provide written progress reports by email weekly for the project duration.
Evaluation Method: The Government will evaluate quotations based on the lowest price technically acceptable criteria.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Set-aside: Small Business Set Aside - Total
Kingsville, TX, 78363, USA
Posted Aug 24, 2026; Responses due Sep 9, 2026, 5:00 PM UTC; Archive date Sep 24, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12FPC326Q0052 is issued as a Request for Quotation (RFQ) for repairs to the E. "Kika" de la Garza Plant Material Center for an existing 36 ft by 60 ft Stuppy System 2000 greenhouse. The far wall which includes the evaporative cooling system needs to be replaced. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors. The small business size standard is 19M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The contractor shall furnish all labor, materials, equipment and supervision required to construct the project at outlined in statement of work attached hereto.
No field-level changes were detected between related notices.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.