Opportunity summary
Source-citedThis solicitation is for work at Havasupai Elementary School involving specific buildings, with a response deadline of September 14, 2026. Evaluation will use the Lowest Price Technically Acceptable process, and offerors must submit their best and final price. [6][4][5]
Key points
- Must hold a kickoff/preconstruction meeting after award. [2]
- Contractor must provide a simple project schedule. [3]
Watch items
- Prohibition on certain telecommunications equipment use. [1]
- Proposals must present the best and final price. [5]
Sources
- Sol_140A2326Q0183.pdf
See sections 1823 through 1825 and 1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers. (d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract. (1) Certain telecommunications and video surveillance equipment, systems, or services. (i) Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system (paragraph (a)(1)(B) of section 889 of the
- Attachment_12_IE056_HES-BLDG-1022_1023_1024_1025-FA_P_S_R_-SOW-Rev-13--8-28-2026_0001.pdf
PROJECT MEETINGS Kickoff / Preconstruction Meeting • Hold one combined kickoff/preconstruction meeting, either in person or virtually, after contract award and before the start of on-site work. • Review project scope, schedule, site access, school coordination, fire alarm impairment procedures, submittal requirements, testing requirements, safety, and points of contact. • The Contractor shall ensure that its project manager and other key personnel responsible for the work attend the meeting.
- Attachment_12_IE056_HES-BLDG-1022_1023_1024_1025-FA_P_S_R_-SOW-Rev-13--8-28-2026_0001.pdf
PROJECT SCHEDULE The Contractor shall provide a simple project schedule showing the anticipated dates for field verification, submittals, Government review, procurement, on-site work, testing, and closeout.
- Sol_140A2326Q0183.pdf
Proposal Evaluation After Phase I, proposals will be evaluated using the Lowest Price Technically Acceptable process defined in FAR 15.101-2.
- Sol_140A2326Q0183.pdf
Therefore, offerors should present their best and final price at time of proposal submission.
- Official SAM.gov notice
Posted Sep 1, 2026; Responses due Sep 14, 2026, 11:00 PM UTC; Archive date Sep 16, 2026
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
6 citations · 6 sourcesSee sections 1823 through 1825 and 1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers. (d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract. (1) Certain telecommunications and video surveillance equipment, systems, or services. (i) Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system (paragraph (a)(1)(B) of section 889 of the John S.
Scope
PROJECT MEETINGS Kickoff / Preconstruction Meeting • Hold one combined kickoff/preconstruction meeting, either in person or virtually, after contract award and before the start of on-site work. • Review project scope, schedule, site access, school coordination, fire alarm impairment procedures, submittal requirements, testing requirements, safety, and points of contact. • The Contractor shall ensure that its project manager and other key personnel responsible for the work attend the meeting.
Deliverables
PROJECT SCHEDULE The Contractor shall provide a simple project schedule showing the anticipated dates for field verification, submittals, Government review, procurement, on-site work, testing, and closeout.
Evaluation
Proposal Evaluation After Phase I, proposals will be evaluated using the Lowest Price Technically Acceptable process defined in FAR 15.101-2.
Submission
Therefore, offerors should present their best and final price at time of proposal submission.
Key dates
Posted Sep 1, 2026; Responses due Sep 14, 2026, 11:00 PM UTC; Archive date Sep 16, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.