Scope
Only the Contracting Officer may authorize changes to contract requirements, price, delivery, schedule, or scope of work.
INTERIOR, DEPARTMENT OF THE · US FISH AND WILDLIFE SERVICE · FWS, SAT TEAM 1
The FWS requires a contractor to fabricate, install, and test Phase 2 interpretive exhibits for the Tetlin NWR Visitor Center in Tok, Alaska. This is a total small business set-aside with a response deadline of September 9, 2026. [5][3]
Milestone / Deliverable Contractor Requirement Required Date Project schedule Submit a detailed schedule identifying fabrication, milestone reviews, shipment, delivery, installation, testing, closeout deliverables, and punch-list correction Within 10 calendar days after BPA Call award 35 percent fabrication milestone Submit photographs, measurements, fabrication status, material and finish information, known issues, and deviations from issued-for-fabrication documents Contractor-proposed date supporting required delivery 65 percent fabrication milestone Submit photographs, measurements, fabrication status, material and finish information, known issues, and deviations from issued-for-fabricatio
Only the Contracting Officer may authorize changes to contract requirements, price, delivery, schedule, or scope of work.
52.212-2 Evaluation - Commercial Products and Commercial Services. (DEVIATION MAR 2026) ADDENDUM TO 52.212-2 – EVALUATION AND BASIS FOR AWARD The Government intends to award a firm-fixed-price purchase order to the responsible vendor whose quotation represents the best overall value to the Government, considering the evaluation factors identified below.
D – Solicitation Provisions Instructions to Offerors—Commercial Products and Commercial Services (DEVIATION MAR 2026) Addendum to 52.212-1 – Quotation Submission Requirements In addition to the requirements outlined in FAR 52.212-1, Instructions to Offerors—Commercial Products and Commercial Services, vendors submitting quotations must ensure their quotations are concise and include the following information: 1.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Milestone / Deliverable Contractor Requirement Required Date Project schedule Submit a detailed schedule identifying fabrication, milestone reviews, shipment, delivery, installation, testing, closeout deliverables, and punch-list correction Within 10 calendar days after BPA Call award 35 percent fabrication milestone Submit photographs, measurements, fabrication status, material and finish information, known issues, and deviations from issued-for-fabrication documents Contractor-proposed date supporting required delivery 65 percent fabrication milestone Submit photographs, measurements, fabrication status, material and finish information, known issues, and deviations from issued-for-fabrication documents Contractor-proposed date supporting required delivery 95 percent fabrication milestone Submit complete milestone package and written notice that exhibits are ready for pre-shipment review Contractor-proposed date supporting required delivery Pre-shipment release Do not crate or ship until Government provides written authorization to proceed Prior to shipment Delivery Deliver all crated exhibit components to Tok Interagency Visitor Center May 15, 2027 Installation completion Complete installation, testing, cleanup, and removal of installation-generated waste September 30, 2027 Closeout deliverables Submit as-built drawings, O and M manuals, warranty documentation, native editable files, final graphic files, and GFP inventory Within 10 calendar days after installation completion Punch-list correction Correct Government-identified deficiencies Within 10 calendar days after written notice, unless otherwise approved by CO Final acceptance Complete all work, deliverables, and punch-list corrections After Government final inspection and written acceptance Milestone and Deliverable Schedule
Only the Contracting Officer may authorize changes to contract requirements, price, delivery, schedule, or scope of work.
The Contractor shall provide warranty documentation with the closeout deliverables.
52.212-2 Evaluation - Commercial Products and Commercial Services. (DEVIATION MAR 2026) ADDENDUM TO 52.212-2 – EVALUATION AND BASIS FOR AWARD The Government intends to award a firm-fixed-price purchase order to the responsible vendor whose quotation represents the best overall value to the Government, considering the evaluation factors identified below.
D – Solicitation Provisions Instructions to Offerors—Commercial Products and Commercial Services (DEVIATION MAR 2026) Addendum to 52.212-1 – Quotation Submission Requirements In addition to the requirements outlined in FAR 52.212-1, Instructions to Offerors—Commercial Products and Commercial Services, vendors submitting quotations must ensure their quotations are concise and include the following information: 1.
Set-aside: Small Business Set Aside - Total
Posted Aug 27, 2026; Responses due Sep 9, 2026, 12:00 AM UTC; Archive date Sep 23, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
ND-TETLIN NWR-TOK IVC EXHIBIT PHASE 2 The U.S. Fish and Wildlife Service requires a qualified contractor to fabricate, package, ship, deliver, install, and test Phase 2 interpretive exhibits for the Tetlin National Wildlife Refuge Visitor Center in Tok, Alaska. Work includes custom exhibit fabrication, graphics, multimedia components, taxidermy and natural materials, transportation, on-site installation, testing, and closeout in accordance with Government-provided Issued for Fabrication design documents. This requirement is a total small business set-aside.
No field-level changes were detected between related notices.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.