← Active opportunities
OpenSolicitationAmended

BLM-CO TRFO BASIN WELL AND WATER SYSTEM

Solicitation number140L1726R0005

INTERIOR, DEPARTMENT OF THE · BUREAU OF LAND MANAGEMENT · COLORADO STATE OFFICE

View opportunity on SAM.gov ↗
Response deadlineSep 9, 2026, 6:00 PM UTC
Deadline status6 days remaining
PostedAug 28, 2026
Record refreshedAug 29, 2026
Place of performanceLatitude: 38.06529167° N Longitude: -108.63154723° W, Naturita, CO, United States

Opportunity summary

Source-cited

This solicitation seeks a turnkey, solar-powered well water system for the BLM-CO TRFO Basin in Colorado, designed to supply a wildlife drinking tank. The work must be completed within 360 days and is set aside for Indian Small Business Economic Enterprises. [1]

Key points

  • Provide turnkey solar well water system for wildlife tank [1]
  • Set-aside for Indian Small Business Economic Enterprise [1]

Watch items

  • Work completion timeline is 360 days from NTP [1]
  • Response deadline is September 9, 2026 [1]

Sources

  1. Official SAM.gov notice1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

6 citations · 1 source

1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS This is a solicitation announcement for well improvements of a well house located at the Bureau of Land Management TRFO Basin Well, Montrose County, Colorado near Naturita, CO. Socio-economic Categories: While this procurement will be solicited only to the C-MAC Indian Small Business Economic Enterprises. 1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance. System shall be designed to have a solar pumping system at an existing water well. Provide water to an elevated buried storage tank. The buried storage tank will gravity feed the drinking tank. An additional tee and valve shall be provided for a future upgrade for a stockwater tank. System shall be designed to be freeze proof and operational in the winter to the frost free hydrant at the drinking tank. 1.2 LOCATION Latitude: 38.06529167° N Longitude: -108.63154723° W From Naturita, CO. Travel south on CO-141 for approximately 12 miles. Turn right (west) on County Road U29. Travel approximately 5 miles. The project is on the left (south). 1.3 WORK SCHEDULE Work shall be completed within 360 days of the Notice to Proceed. Contractor shall complete all work within 360 days of starting work. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Period of Performance: Work shall be completed within 360 days of the Notice to Proceed. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Free assistance is available at your local APEX Accelerators - https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 15 - Contracting by Negotiation 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Montrose County, CO 6. Total Small Business Set-Aside for NAICS 237110 -Water and Sewer Line and Related Structures Construction $45 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -LPTA see Sections L and M Primary POC: Contracting Specialist Courtni Strickland cstrickland@ios.doi.gov

What changed

Aug 28, 2026 · 4 fields changed
TitleZ--BLM-CO TRFO BASIN WELL AND WATER SYSTEMBLM-CO TRFO BASIN WELL AND WATER SYSTEM
Set-asideSmall Business Set Aside - TotalIndian Small Business Economic Enterprise
DescriptionBLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS This solicitation is being amended to reopened to change the set aside to 100% Total Small Business due to original set-aside resulting in no responses, post it to open market (SAM.gov), update terms and conditions, and adding attachments. All questions are due by September 2, 2026 1200 MD. This is a solicitation announcement for well improvements of a well house located at the Bureau of Land Management TRFO Basin Well, Montrose County, Colorado near Naturita, CO. 1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance. System shall be designed to have a solar pumping system at an existing water well. Provide water to an elevated buried storage tank. The buried storage tank will gravity feed the drinking tank. An additional tee and valve shall be provided for a future upgrade for a stockwater tank. System shall be designed to be freeze proof and operational in the winter to the frost free hydrant at the drinking tank. 1.2 LOCATION Latitude: 38.06529167° N Longitude: -108.63154723° W From Naturita, CO. Travel south on CO-141 for approximately 12 miles. Turn right (west) on County Road U29. Travel approximately 5 miles. The project is on the left (south). 1.3 WORK SCHEDULE Work shall be completed within 360 days of the Notice to Proceed. Contractor shall complete all work within 360 days of starting work. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Period of Performance: Work shall be completed within 360 days of the Notice to Proceed. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Free assistance is available at your local APEX Accelerators - https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 12- Acquisition of Commercial Products and Commercial Services 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Montrose County, CO 6. Total Small Business Set-Aside for NAICS 237110 -Water and Sewer Line and Related Structures Construction $45 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -LPTA see Sections L and M Primary POC: Contracting Specialist Courtni Strickland cstrickland@ios.doi.govBLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS This is a solicitation announcement for well improvements of a well house located at the Bureau of Land Management TRFO Basin Well, Montrose County, Colorado near Naturita, CO. Socio-economic Categories: While this procurement will be solicited only to the C-MAC Indian Small Business Economic Enterprises. 1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance. System shall be designed to have a solar pumping system at an existing water well. Provide water to an elevated buried storage tank. The buried storage tank will gravity feed the drinking tank. An additional tee and valve shall be provided for a future upgrade for a stockwater tank. System shall be designed to be freeze proof and operational in the winter to the frost free hydrant at the drinking tank. 1.2 LOCATION Latitude: 38.06529167° N Longitude: -108.63154723° W From Naturita, CO. Travel south on CO-141 for approximately 12 miles. Turn right (west) on County Road U29. Travel approximately 5 miles. The project is on the left (south). 1.3 WORK SCHEDULE Work shall be completed within 360 days of the Notice to Proceed. Contractor shall complete all work within 360 days of starting work. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Period of Performance: Work shall be completed within 360 days of the Notice to Proceed. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Free assistance is available at your local APEX Accelerators - https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 15 - Contracting by Negotiation 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Montrose County, CO 6. Total Small Business Set-Aside for NAICS 237110 -Water and Sewer Line and Related Structures Construction $45 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -LPTA see Sections L and M Primary POC: Contracting Specialist Courtni Strickland cstrickland@ios.doi.gov
Documents6Removed

Notice history

Attachments

No attachments are currently listed.

Back to top ↑