Response deadlineNov 2, 2026, 9:00 PM UTC
Deadline status60 days remaining
PostedJul 20, 2026
Record refreshedSep 2, 2026
Opportunity summary
Source-citedThis is a Construction Services project to build a new 0.65 MGD Membrane Bio-Reactor wastewater treatment plant at the Grand Canyon's South Rim Village. Contract activities must be scheduled to minimize visitor impact since the park will remain open during construction. [2][1]
Key points
- Construct new 0.65 MGD WWTP at South Rim Village site [2]
- Award based on Best Value: Technical, Past Performance, Price [3]
Watch items
- Logistics involve limited staging and unique material delivery [1]
- Proposal instructions will be issued on or after 08/01/2026 [1]
Sources
- B01_Synopsis_PreSolitNotice_RELEASED_Mar2025_2.pdf
The surrounding area is rural with limited staging room available, although staging is available within the park for material and contractor camp the nearest suppliers and lodging facilities is 75 miles from the Park, and unique material delivery requirements.
- B01_Synopsis_PreSolitNotice_RELEASED_Mar2025_2.pdf
Work to be performed under this Construction Services project requirement includes: Located on the South Rim of the Grand Canyon in the South Rim Village this project involves the construction of a new 0.65 MGD Membrane Bio-Reactor wastewater treatment plant (WWTP)at the existing Wastewater Treatment Plant site, including new treatment facilities (utility connections, site power, electrical, instrumentation and control),
- B01_Synopsis_PreSolitNotice_RELEASED_Mar2025_2.pdf
Award shall be made to the responsible Offeror whose offer conforms to requirements and represents the Best Value to the Government, considering Technical, Past Performance, and Price factors.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
6 citations · 4 sourcesThe surrounding area is rural with limited staging room available, although staging is available within the park for material and contractor camp the nearest suppliers and lodging facilities is 75 miles from the Park, and unique material delivery requirements.
Scope
Work to be performed under this Construction Services project requirement includes: Located on the South Rim of the Grand Canyon in the South Rim Village this project involves the construction of a new 0.65 MGD Membrane Bio-Reactor wastewater treatment plant (WWTP)at the existing Wastewater Treatment Plant site, including new treatment facilities (utility connections, site power, electrical, instrumentation and control),
Deliverables
The Park will remain open during construction thus contract activities and logistics must be structured and scheduled to minimize visitor impact.
Evaluation
Award shall be made to the responsible Offeror whose offer conforms to requirements and represents the Best Value to the Government, considering Technical, Past Performance, and Price factors.
Submission
Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or after 08/01/2026.
Key dates
Posted Jul 20, 2026; Responses due Nov 2, 2026, 9:00 PM UTC; Archive date Nov 17, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.