← Active opportunities
OpenCombined Synopsis/SolicitationAmended

FCI Seagoville Hot Water Generator Replacement

Solicitation number15B51426Q00000023

JUSTICE, DEPARTMENT OF · FEDERAL PRISON SYSTEM / BUREAU OF PRISONS · FCI SEAGOVILLE

View opportunity on SAM.gov ↗
Response deadlineSep 16, 2026, 3:00 PM UTC
Deadline status13 days remaining
PostedSep 2, 2026
Record refreshedSep 3, 2026
Place of performanceSeagoville, TX, United States

Opportunity summary

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

15B51426Q00000023 Page 8 of 30 Clause Title Fill-ins (if applicable) 52.204-14 (DEV) Service Contract Reporting Requirements (Oct 2016) (DEVIATION NOV 2025) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-6 (DEV) Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025) (DEVIATION NOV 2025) 52.209-9 (DEV) Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (DEVIATION NOV 2025) 52.209-10 (DEV) Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) (DEVIATION NOV 2025) 52.211-12 Liquidated Damages-Construction (Sept 2000) (a): "$1,860.63" 52.212-4 (DEV) Terms and Conditions-Commercial Products and Commercial Services (Nov 2023) (DEVIATION NOV 2025) 52.215-21 (DEV) Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data- Modifications (Nov 2021) (DEVIATION DEC 2025) 52.215-21 Alt I (DEV) Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data- Modifications (Nov 2021) - Alternate I (DEVIATION DEC 2025) 52.219-14 (DEV) Limitations on Subcontracting (Oct 2022) (DEVIATION DEC 2025) (f)(1) End of Base Term: "X" 52.222-1 (DEV) Notice to the Government of Labor Disputes (Feb 1997) (DEVIATION DEC 2025) 52.222-3 (DEV) Convict Labor (June 2003) (DEVIATION DEC 2025) 52.222-4 (DEV) Contract Work Hours and Safety Standards--Overtime Compensation (May 2018) (DEVIATION DEC 2025)

Scope

The requirements set forth in the preceding paragraphs of this clause apply to all subcontractors and CSPs who perform work in connection with the contract, including any CSP providing services for any other CSP under the contract, and the Contractor shall flow down this clause to all subcontractors and CSPs performing under this contract.

Deliverables

• For security and safety purposes, forty-eight (48) hour advance notice in writing, prior to disruption to the system must be given to the Contracting Officer and COR. • Provide complete narrative descriptions of all system operations. • The contractor shall provide one complete set hardcopy D-size drawings of the entire system, an electronic version of all the plans in Computer Aided Design (CAD) format (2007 edition or later) and in PDF format in disc/s upon completion of the project. • The contractor shall provide an Installation Certification of the completed and tested systems that contain an affidavit signed by the contractor and manufacturer’s representative, notarized, certifying that the complete systems meet the contract requirements and are fully operational per the manufacturer's recommendations. • Equipment submittals for heater packages include cut sheets, connection requirements, electrical requirements, and accessories. • Valve/strainer/trap assemblies and steam/condensate component data (including materials, ratings, and installation details). • Rigging/hoisting plan, path of travel, equipment weights, lift points, and floor loading verification as applicable. • Shutdown/outage plan (steam, domestic water, electrical) including proposed schedule and contingency plan to maintain operations. • Controls/BAS future-ready plan identifying RS-485 Modbus termination location, conduit route, cable type, labeling scheme, and spare pair(s). • Project schedule and manpower plan.

Submission

The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

Attached is a solicitation package prepared by the Federal Bureau of Prisons, FCI Seagoville for the provision of Hot Water Generator Replacement- located at FCC Seagoville, TX. This package contains all necessary information to submit a quote. Quote Submission Requirements and Instructions The information requested must be submitted by contractors and received on or before the solicitation response date and time. If any of the following information is not received, the Contract Specialist may elect to deem quotes non-compliant or request the required information from one or any of the contractors, whichever is most advantageous to the Government, at the discretion of the Contract Specialist. Questions regarding this requirement may be directed in writing to Camille Gonzalez, Contract Specialist, c9gonzalez@bop.gov Evaluation and Award Methodology: Award of a contract will be made to the quoter who submits a quote, conforming to the requirements of the solicitation, determined to be the best value to the Government considering price and past performance. The following factors will be evaluated: Price: Price shall be evaluated utilizing the total aggregate pricing offered by the quoter. Past Performance: The Contractor Performance Assessment Reporting System (CPARS) at www.cpars.gov and/or the professional references submitted with quotes, and/or any other relevant information available to the Contract Specialist may be used for past performance evaluation. SAM Registration: All potential quoters are advised that this solicitation included the provision at FAR 52.204.7, System for Award Management, which requires that an offeror be registered in SAM when submitting an offer or quote and continue to be registered throughout the duration of the task order. Quoters should include their Unique Entity Identifier (UEI) Number in their quotation. Failure to complete the registration procedures outlined in this clause may result in elimination from consideration for award. PTAC: If you have questions about the System for Award Management (SAM), Government procedures in general, or need assistance in the preparation of your quote, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org. Freedom of Information Act: The Freedom of Information Act (FOIA) and its amendments have resulted in an increasing number of requests to Federal Agencies for copies of quotes from other than Government sources. The quoter should identify information in its quote it believes should be withheld from these sources, on the basis it consists of "trade secrets and commercial or financial information obtained from a person and privileged or confidential" (exemption (b)(4)of the (FOIA). This identification will assist in the decision by a responsible federal official to disclose or withhold the requested information. If a quoter considers elements of its quote to be exempt under FOIA, ensure the following notice is annotated on the titlepage of the quote: "Elements of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secrets or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material considered privileged or confidential on this basis is contained on pages ____." The quote must annotate each individual item it considers privileged or confidential under the FOIA exemption with the following notice: "The data or information is considered confidential or privileged, and not subject to mandatory disclosure under the FOIA." All information in an offeror's quote not designated may be subject to automatic public disclosure if it is requested under the FOIA. It must be emphasized that under the FOIA, no information is automatically exempt form public disclosure. However, no disclosures will be made without careful evaluation, giving due regard to the need for safeguarding material considered privileged or confidential by the quoter. It is the Department of Justice policy to withhold whenever possible, material that is genuinely privileged or confidential. II. Pre-Quote Questions: Any questions relating to the solicitation after the closing of the pre-quote conference/site visit shall be sent in WORD FORMAT to Camille Gonzalez, Contract Specialist, via email at c9gonzalez@bop.gov no later than ONE WEEK PRIOR TO SOLICITATION CLOSING DATE, at 10:00 am EST. In order to provide sufficient response time prior to the quote due date, the Government is establishing the above cut-off date for questions about the solicitation. All quoters shall quote/ offer in accordance with the current solicitation to include all amendments (if any) as issued by the Contract Specialist only. Funds are not presently available for this solicitation. No award will be made under this solicitation until funds are made available and confirmed in writing by the Contracting Specialist. The Government reserves the right to cancel this solicitation at any time; either before or after the closing date. In the event of cancellation, the Government shall have no obligation to reimburse any quoter for any costs incurred in connection with the preparation or submission of its quote. Site Visit is currently scheduled for 9 am, Monday, September 14, 2026 at FCI Seagoville, 2113 N HWY 175, Seagoville, TX 75159. Security forms are due 12 pm, Thursday, September 9, 2026. 2 forms of identification, NCIC and DOJ residency forms must be submitted to Camille Gonzalez at (c9gonzalez@bop.gov). All documents must be sent in PDF format.

What changed

Sep 2, 2026 · 2 fields changed
DescriptionAttached is a solicitation package prepared by the Federal Bureau of Prisons, FCI Seagoville for the provision of Hot Water Generator Replacement- located at FCC Seagoville, TX. This package contains all necessary information to submit a quote. Quote Submission Requirements and Instructions The information requested must be submitted by contractors and received on or before the solicitation response date and time. If any of the following information is not received, the Contract Specialist may elect to deem quotes non-compliant or request the required information from one or any of the contractors, whichever is most advantageous to the Government, at the discretion of the Contract Specialist. Questions regarding this requirement may be directed in writing to Camille Gonzalez, Contract Specialist, c9gonzalez@bop.gov Evaluation and Award Methodology: Award of a contract will be made to the quoter who submits a quote, conforming to the requirements of the solicitation, determined to be the best value to the Government considering price and past performance. The following factors will be evaluated: Price: Price shall be evaluated utilizing the total aggregate pricing offered by the quoter. Past Performance: The Contractor Performance Assessment Reporting System (CPARS) at www.cpars.gov and/or the professional references submitted with quotes, and/or any other relevant information available to the Contract Specialist may be used for past performance evaluation. SAM Registration: All potential quoters are advised that this solicitation included the provision at FAR 52.204.7, System for Award Management, which requires that an offeror be registered in SAM when submitting an offer or quote and continue to be registered throughout the duration of the task order. Quoters should include their Unique Entity Identifier (UEI) Number in their quotation. Failure to complete the registration procedures outlined in this clause may result in elimination from consideration for award. PTAC: If you have questions about the System for Award Management (SAM), Government procedures in general, or need assistance in the preparation of your quote, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org. Freedom of Information Act: The Freedom of Information Act (FOIA) and its amendments have resulted in an increasing number of requests to Federal Agencies for copies of quotes from other than Government sources. The quoter should identify information in its quote it believes should be withheld from these sources, on the basis it consists of "trade secrets and commercial or financial information obtained from a person and privileged or confidential" (exemption (b)(4)of the (FOIA). This identification will assist in the decision by a responsible federal official to disclose or withhold the requested information. If a quoter considers elements of its quote to be exempt under FOIA, ensure the following notice is annotated on the titlepage of the quote: "Elements of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secrets or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material considered privileged or confidential on this basis is contained on pages ____." The quote must annotate each individual item it considers privileged or confidential under the FOIA exemption with the following notice: "The data or information is considered confidential or privileged, and not subject to mandatory disclosure under the FOIA." All information in an offeror's quote not designated may be subject to automatic public disclosure if it is requested under the FOIA. It must be emphasized that under the FOIA, no information is automatically exempt form public disclosure. However, no disclosures will be made without careful evaluation, giving due regard to the need for safeguarding material considered privileged or confidential by the quoter. It is the Department of Justice policy to withhold whenever possible, material that is genuinely privileged or confidential. II. Pre-Quote Questions: Any questions relating to the solicitation after the closing of the pre-quote conference/site visit shall be sent in WORD FORMAT to Camille Gonzalez, Contract Specialist, via email at c9gonzalez@bop.gov no later than ONE WEEK PRIOR TO SOLICITATION CLOSING DATE, at 10:00 am EST. In order to provide sufficient response time prior to the quote due date, the Government is establishing the above cut-off date for questions about the solicitation. All quoters shall quote/ offer in accordance with the current solicitation to include all amendments (if any) as issued by the Contract Specialist only. Funds are not presently available for this solicitation. No award will be made under this solicitation until funds are made available and confirmed in writing by the Contracting Specialist. The Government reserves the right to cancel this solicitation at any time; either before or after the closing date. In the event of cancellation, the Government shall have no obligation to reimburse any quoter for any costs incurred in connection with the preparation or submission of its quoteAttached is a solicitation package prepared by the Federal Bureau of Prisons, FCI Seagoville for the provision of Hot Water Generator Replacement- located at FCC Seagoville, TX. This package contains all necessary information to submit a quote. Quote Submission Requirements and Instructions The information requested must be submitted by contractors and received on or before the solicitation response date and time. If any of the following information is not received, the Contract Specialist may elect to deem quotes non-compliant or request the required information from one or any of the contractors, whichever is most advantageous to the Government, at the discretion of the Contract Specialist. Questions regarding this requirement may be directed in writing to Camille Gonzalez, Contract Specialist, c9gonzalez@bop.gov Evaluation and Award Methodology: Award of a contract will be made to the quoter who submits a quote, conforming to the requirements of the solicitation, determined to be the best value to the Government considering price and past performance. The following factors will be evaluated: Price: Price shall be evaluated utilizing the total aggregate pricing offered by the quoter. Past Performance: The Contractor Performance Assessment Reporting System (CPARS) at www.cpars.gov and/or the professional references submitted with quotes, and/or any other relevant information available to the Contract Specialist may be used for past performance evaluation. SAM Registration: All potential quoters are advised that this solicitation included the provision at FAR 52.204.7, System for Award Management, which requires that an offeror be registered in SAM when submitting an offer or quote and continue to be registered throughout the duration of the task order. Quoters should include their Unique Entity Identifier (UEI) Number in their quotation. Failure to complete the registration procedures outlined in this clause may result in elimination from consideration for award. PTAC: If you have questions about the System for Award Management (SAM), Government procedures in general, or need assistance in the preparation of your quote, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org. Freedom of Information Act: The Freedom of Information Act (FOIA) and its amendments have resulted in an increasing number of requests to Federal Agencies for copies of quotes from other than Government sources. The quoter should identify information in its quote it believes should be withheld from these sources, on the basis it consists of "trade secrets and commercial or financial information obtained from a person and privileged or confidential" (exemption (b)(4)of the (FOIA). This identification will assist in the decision by a responsible federal official to disclose or withhold the requested information. If a quoter considers elements of its quote to be exempt under FOIA, ensure the following notice is annotated on the titlepage of the quote: "Elements of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secrets or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material considered privileged or confidential on this basis is contained on pages ____." The quote must annotate each individual item it considers privileged or confidential under the FOIA exemption with the following notice: "The data or information is considered confidential or privileged, and not subject to mandatory disclosure under the FOIA." All information in an offeror's quote not designated may be subject to automatic public disclosure if it is requested under the FOIA. It must be emphasized that under the FOIA, no information is automatically exempt form public disclosure. However, no disclosures will be made without careful evaluation, giving due regard to the need for safeguarding material considered privileged or confidential by the quoter. It is the Department of Justice policy to withhold whenever possible, material that is genuinely privileged or confidential. II. Pre-Quote Questions: Any questions relating to the solicitation after the closing of the pre-quote conference/site visit shall be sent in WORD FORMAT to Camille Gonzalez, Contract Specialist, via email at c9gonzalez@bop.gov no later than ONE WEEK PRIOR TO SOLICITATION CLOSING DATE, at 10:00 am EST. In order to provide sufficient response time prior to the quote due date, the Government is establishing the above cut-off date for questions about the solicitation. All quoters shall quote/ offer in accordance with the current solicitation to include all amendments (if any) as issued by the Contract Specialist only. Funds are not presently available for this solicitation. No award will be made under this solicitation until funds are made available and confirmed in writing by the Contracting Specialist. The Government reserves the right to cancel this solicitation at any time; either before or after the closing date. In the event of cancellation, the Government shall have no obligation to reimburse any quoter for any costs incurred in connection with the preparation or submission of its quote. Site Visit is currently scheduled for 9 am, Monday, September 14, 2026 at FCI Seagoville, 2113 N HWY 175, Seagoville, TX 75159. Security forms are due 12 pm, Thursday, September 9, 2026. 2 forms of identification, NCIC and DOJ residency forms must be submitted to Camille Gonzalez at (c9gonzalez@bop.gov). All documents must be sent in PDF format.
Documents13

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑