Scope
SPECIFIC REQUIREMENTS DESIGN SERVICES The Contractor shall design the ITP Dormitories Project as outlined in this document and following the concept/design bridging documents found in Attachment A.
STATE, DEPARTMENT OF · STATE, DEPARTMENT OF · ACQUISITIONS - AQM MOMENTUM
This Sources Sought notice seeks market research for designing and constructing a new dormitory facility for the ITP Training Compound in Comayagua, Honduras. The project requires a complete Design-Review, Engineering, Construction, and Turnover solution for approximately 156 male police students. [2]
SPECIFIC REQUIREMENTS DESIGN SERVICES The Contractor shall design the ITP Dormitories Project as outlined in this document and following the concept/design bridging documents found in Attachment A.
This sources sought synopsis announcement does not constitute a formal solicitation, and is not a request for proposal, request for quote, invitation for bid, does not obligate the government to award a contract, issue a solicitation, reimburse respondents for any proposal preparation and/or submittal costs, nor does its issuance in any way restrict the Government as to its ultimate acquisition approach.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
The Government may review the Contractor's schedule for compliance with contract requirements; however, the Contractor shall remain solely responsible for timely project completion.
SPECIFIC REQUIREMENTS DESIGN SERVICES The Contractor shall design the ITP Dormitories Project as outlined in this document and following the concept/design bridging documents found in Attachment A.
Deliverables Schedule Deliverable Item Hard Copy Electron ic Copy Due Date Notes Proposal Cost Estimate 1 Work Plan 1 Key Personnel 1 Preconstruction Design and Construction Schedule 1 Within 10 days after contract award Safety Plan 1 Within 10 days after contract award Quality Assurance Plan 1 Within 10 days after contract award Insurances and Permits 1 Within 10 days after contract award Design Phase 65% Design Documents 2 1 Within 30 days after NTP Government shall require 5 days to review 65% design submittals.
All contractual requirements have been satisfactorily fulfilled.
This sources sought synopsis announcement does not constitute a formal solicitation, and is not a request for proposal, request for quote, invitation for bid, does not obligate the government to award a contract, issue a solicitation, reimburse respondents for any proposal preparation and/or submittal costs, nor does its issuance in any way restrict the Government as to its ultimate acquisition approach.
HND
Posted Sep 1, 2026; Responses due Sep 11, 2026, 4:00 PM UTC; Archive date Sep 26, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
This is a sources sought notice for information only. This sources sought is for the purpose of conducting market research to provide data for planning purposes. This sources sought synopsis announcement does not constitute a formal solicitation, and is not a request for proposal, request for quote, invitation for bid, does not obligate the government to award a contract, issue a solicitation, reimburse respondents for any proposal preparation and/or submittal costs, nor does its issuance in any way restrict the Government as to its ultimate acquisition approach. The Government will not pay for any materials provided in response to this notice and submittals will not be returned to the sender. The Bureau of International Narcotics and Law Enforcement Affairs (INL), U.S. Embassy Tegucigalpa, intends to construct a new student dormitory facility within the Instituto Técnico Policial (ITP) Training Compound located in Comayagua, Honduras. The objective of this project is to provide a complete Design-Review, Engineering, Construction Documents, Construction, Testing, Commissioning, and Turnover solution for the construction of a new dormitory facility at the Instituto Técnico Policial (ITP) in Comayagua, Honduras The proposed facility is intended to accommodate approximately 156 male police students and includes dormitory sleeping areas, restroom facilities, shower facilities, and laundry areas required for daily operation of the training center. The project has been intentionally developed utilizing a simplified and highly repetitive construction approach intended to facilitate construction, reduce project duration, simplify maintenance requirements, and maximize long-term operational value. The Government has developed a Conceptual Design Package, further referred to as Bridging Documents (See Appendix A), establishing the intended facility configuration, capacities, architectural appearance, minimum material requirements, and minimum technical standards. These documents are included as Government Reference Drawings and Technical Appendices and form part of this Statement of Work. The Contractor shall review the bridging documents, develop construction documents (CDs) to be approved by the government, and construct the project in accordance with the approved CDs. The Contractor shall furnish all labor, supervision, engineering services, professional certifications, materials, equipment, transportation, tools, permits, testing, quality control, safety measures, and incidentals necessary to design and construct a complete and operational facility. The completed facility shall be safe, durable, maintainable, code-compliant, and fully operational upon final Government acceptance. This is not a solicitation nor will a solicitation package be issued as a result of this announcement, and no award shall be made as a result of this announcement. In the event that a solicitation is developed, it will be assigned a formal Request for Proposal (RFP) number or Request for Quotation (RFQ) and the announcement will be published on SAM.gov. RESPONSES DUE For the purposes of this acquisition the applicable NAICS code is 236220. Responses are requested no later than 11 September 2026 at 12:00 PM EDT. Direct expression of interest as well as required documentation should be submitted in writing, via email, to Joonpil Hwang at hwangj2@state.gov and David M. Scott at ScottDM@state.gov. All prospective offerors are responsible for monitoring this site for the release of all other information pertaining to the synopsis and solicitation. RESPONSE SUBMISSION INFORMATION All potential sources with the capability to provide the requirements referenced in this sources sought are invited to submit, in writing, sufficient information within the page limitations listed below. This information should demonstrate the respondent's ability to fulfill the technical, delivery, and support requirements and be responsive to the technical questions in this RFI as indicated below. We will not answer technical questions or provide additional technical information at this time via this sources sought notice. Please understand that the rough order of magnitude is for the purposes of market research and your firm will in no way be committed to any estimate you provide under this notice. Responses to this RFI shall include the following: 1. A cover sheet which includes: Company Name Address Point of Contact E-mail Address Phone Number DUNS Number Primary Business and Market Areas Business Size and Socioeconomic Status (if applicable) 2. Relevant Construction Project Experience (four (4) page limit): The potential offerors need to demonstrate that they posses, within the last five years, construction experience similar to that described in this specified source sought category in Honduras. Offerors must verify experience commensurate with the construction of the above stated sample TOs' works in environments and working conditions comparable to that of Honduras (i.e., insurgency presence, seismic activity, lack of appropriate sanitation services, lack of electricity, etc.). Experience described above needs to include the offeror's role, primary contractor or sub-contractor. Each project experience needs to include the contract number, the US Agency or private company that awarded the contract and contract monetary value. Potential offerors need to possess Honduran licenses to operate legally throughout the territory. Submit copies of such licenses. The potential offerors need to document experience in coordinating with host nation government(s) to mitigate and solve potential issues; Experience in importation of materials, equipment, manpower, and any other necessary resources required for the completion of design-build projects; 3. Capabilities of Successfully Completing constructions (six (6) page limit): Ability to provide all required design and engineering services, manpower, and materials to construct new buildings or to renovate existing ones; Ability to provide and deliver required materials and equipment to projects located in Honduras; Capabilities to import all required material and equipment through either sea or air transportation to Honduras; Ability that, should a solicitation be issued in the future for this requirement, offerors should declare if the offeror is applying as a primary contractor, a joint venture or partnership or other as applicable to their submission. Ability that, should sub-contractors figure into an offeror's plans, the offeror will be expected to specify what percentage of work will be tasked to assigned sub-contractors. Period of Performance The proposed period of performance of this requirement is 330 calendar days from issuance of Notice to Proceed.