← Active opportunities
OpenSolicitation

CMR ABA Lift supply and installation

Solicitation number19C02026Q0032

STATE, DEPARTMENT OF · STATE, DEPARTMENT OF · U.S. EMBASSY BOGOTA

View opportunity on SAM.gov ↗
Response deadlineSep 9, 2026, 9:00 PM UTC
Deadline status6 days remaining
PostedAug 21, 2026
Record refreshedSep 2, 2026
Place of performanceBOGOTA, CO-DC, 110111, COL

Opportunity summary

Source-cited

This Request for Quotes seeks supply and installation of a CMR ABA lift in Bogota, Colombia, with a response deadline of September 9, 2026. Site visits are scheduled for August 28, 2026, and questions must be submitted before September 1, 2026. [3]

Key points

  • Award is based on the lowest priced, acceptable, responsible quoter. [2]
  • Submittals require security clearances and visitor access requests. [1]

Watch items

  • Site visit is scheduled for August 28, 2026. [3]
  • Quotations must be submitted in English. [3]

Sources

  1. Solicitation+19C02026Q0032.pdf11 Deliverables The Contractor shall submit all required documentation, technical data, certifications, and closeout items to the Contracting Officer’s Representative (COR) in accordance with the following schedule and requirements: 11.1 Pre-Construction and Administrative Submittals: • Security Clearances and Namechecks: Submit all required personal information and documentation for security background checks (Namecheck) at least one (1) month in advance for any contractor personnel scheduled to work on-site for more than five (5) days. • Visitor Access Requests (VAR): Submit formal visitor access requests (VAR) well in advance of scheduled work, adhering strictly to U.S.
  2. Solicitation+19C02026Q0032.pdf1): PROVISION TITLE AND DATE 52.204-7 SYSTEM FOR AWARD MANAGEMENT (NOV 2025) 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991) 39 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2025) 40 SECTION K - EVALUATION CRITERIA Award will be made to the lowest priced, acceptable, responsible quoter.
  3. Official SAM.gov noticeSet-aside: No Set aside used

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

See sections 1823 through 1825 and 1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers. (d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract. (1) Certain telecommunications and video surveillance equipment, systems, or services. (i) Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system (paragraph (a)(1)(B) of section 889 of the John S.

Scope

29 (iv) The entity that produced the product or service (include entity name, unique entity identifier, Contractor and Government Entity (CAGE) code, facilities responsible for design, fabrication, assembly, packaging, and test of the product, and whether the entity was the OEM or a distributor (provide manufacturer codes and distributor codes used for the product)); (v) Description of the functionality of the product or service and how that functionality impacts the risk to the product or service; (vi) An explanation of any factors relevant to determining if the product or service should be permitted by an applicable exception, exemption, or waiver (if the contractor would like the Government to consider a waiver, and asks for such a waiver); (vii) Whether alternative products or services are available that would comply with the prohibition; (viii) If the product or service is related to item maintenance, include the following information on the item being maintained: (A) Brand; (B) Model number, OEM number, manufacturer part number, or wholesaler number; and (C) Item description, as applicable. (ix) Any readily available information about mitigation actions implemented or recommended. (2) If a report must be submitted to a contracting office, the Contractor shall submit the report as follows: (i) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil. (ii) For all other contracting offices, the Contractor shall report to the Contracting Officer. (iii) For indefinite delivery contracts, the Contractor shall report to both the contracting office for the indefinite delivery contract and the contracting office for any affected order. (3) If the report provided does not contain any of the information required by paragraph (h)(1) of this clause, and the contractor later discovers new information that is required by paragraph (h)(1) of this clause, then the contractor shall submit a subsequent report within 72 hours of discovering the new information. (4) The contractor shall also report the information in paragraph (h)(1) if the contractor wishes to ask for a waiver of the requirements of a new FASCSA order being applied through modification. (i) New FASCSA orders report. (1) During contract performance, the Contractor shall review SAM at least once every three months, or as advised by the Contracting Officer, to check for covered articles subject to FASCSA order(s), or for products or services produced by a source subject to FASCSA order(s) not currently identified under paragraph (e) of this clause. (2) If the Contractor identifies a new FASCSA order(s) that could impact their supply chain, then the Contractor shall conduct a reasonable inquiry to identify whether a covered article or product or service produced or provided by a source subject to the FASCSA order(s) was provided to the Government or used during contract performance.

Deliverables

11 Deliverables The Contractor shall submit all required documentation, technical data, certifications, and closeout items to the Contracting Officer’s Representative (COR) in accordance with the following schedule and requirements: 11.1 Pre-Construction and Administrative Submittals: • Security Clearances and Namechecks: Submit all required personal information and documentation for security background checks (Namecheck) at least one (1) month in advance for any contractor personnel scheduled to work on-site for more than five (5) days. • Visitor Access Requests (VAR): Submit formal visitor access requests (VAR) well in advance of scheduled work, adhering strictly to U.S.

Evaluation

1): PROVISION TITLE AND DATE 52.204-7 SYSTEM FOR AWARD MANAGEMENT (NOV 2025) 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991) 39 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2025) 40 SECTION K - EVALUATION CRITERIA Award will be made to the lowest priced, acceptable, responsible quoter.

Submission

Embassy security protocols. • Review and Approval: Review and provide timely written approvals or rejections for all required submittals, material samples, shop drawings, catalog cuts, product data, technical proposals, and quotation requests (such as the verification and approval for bathroom accessories). • Inspection and Monitoring: Perform periodic site inspections, quality assurance monitoring, and progress reviews to verify that the work is proceeding in accordance with the contract documents, technical specifications, and safety standards. • Access to Utilities: Provide access to existing building utility services (water and electric power) at designated points to support construction operations, subject to coordination regarding planned utility shutdowns. • Testing and Commissioning Witnessing: Witness critical system tests, functional checkouts, and operational load testing of the accessibility lift and electrical distribution panels. • Final Acceptance: Conduct final inspections jointly with the Contractor and issue formal written acceptance and closeout documentation upon successful completion of all punch- list items, submission of certified as-built drawings, and delivery of O&M manuals and training.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

Enclosed is a Request for Quotes (RFQ) for CMR ABA lift supply & installation. If you would like to submit a quotation, follow the instructions in Section J of the solicitation. Site visit will be held on August 28, 2026 at 11:00, if you are interested in participating send an e-mail to BogotaGSOCompras@state.gov with complete information of your company representatives before August 25, 2026 including the names and ID representative (max. one (1) per company). If you send the information after the deadline, the access will be denied. Question will be received before September 1, 2026 at 4:00 Pm to BogotaGSOCompras@state.gov. Quotations are due by September 9, 2024 at 16:00 hours. No quotations will be accepted after this time. Quotations must be in English and incomplete quotations will not be accepted.

What changed

No field-level changes were detected between related notices.

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑