← Active opportunities
Solicitation

ACTUATOR,MECHANICAL

DEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · SPRMM1 DLA MECHANICSBURG

NAICS 333613PSC 3040Amended
Response deadlineSep 30, 2026
PostedAug 26, 2026
SolicitationSPRMM126QMF39
Notice ID2b652b90a5524e70b87f1df75cc5b4f1
Notice typeSolicitation
Set-aside
Place of performance
AwardNot posted

Notice description

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|MIL-I-45208/ISO 9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The purpose of this amendment is to extend the date for quotes to 9/20/26. All other terms and conditions remain the same. \ The purpose of this amendment is to update the TDP and extend the date for quotes. All other terms and conditions remain the same. The purpose of this amendment is to extend the date for quotes to 15 JUL 2026. 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. Drawings or technical data are available for this item. 3. Delivery days_________aro. 4. Offer valid for _____ days. 5. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST state who the Original Equipment Manufacturer (OEM) is ?Commercial and Government Entity Code (CAGE) code? and the part number you are offering. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment(PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA athttps://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report (COMBO) through PIEE WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ 12. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four elements are met. Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per DFARS 215.101-2-70(a)(1)(i). This procurement requires Higher Level Inspection. Drawings for this solicitation will be accessed via the website, www.SAM.gov.Click the Search button and type the solicitation number in the box and hitenter. Links to the solicitation should follow on the right. Click the BLUELINKwith the name of the item that is identified as the "Updated Solicitation". Click to the left on "Attachments/Links" which will take you to the link to request access to the drawings. Drawing access request should be submitted by the Data Custodian listed on your approved DD2345.Only the Data C Custodian will be granted access to the controlled drawings. If there are problems accessing the drawings, please contact the buyer POClisted on this solicitation. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the ACTUATOR,MECHANICAL . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=6397408 |53711| C| |A|0001 | B|49998|9999999 3. REQUIREMENTS 3.1 Manufacture and Design - The ACTUATOR,MECHANICAL furnished under this contract/purchase order shall meet the requirements as specified on ;Drawing number Naval Sea command 803-6397408; . 3.2 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 3.3 Configuration Control in accordance with MIL-STD-973 Short Form procedures - The requirements of MIL-STD-973 are hereby invoked in the contract/purchase order. The tailoring notes stated in the order cited in paragraph 6.2.1.3 are stated below: A. Considered, tailoring implemented B. Automated processing and submittal is not required. Interactive access to digital data is not required. C. Configuration audits are not required. D. Contractor's configuration management plan is not requried. E. Configuration terminology development documentation is required. F. Only paragraphs 5.3.3.2, 5.3.6.4, 5.3.6.7, 5.3.6.7.3 are required. G. FCD is not required. H. ACD and PCD is not required. I. Not Applicable (NA) to this contract/purchase order. J. NA to this contract/purchase order. K. NA to this contract/purchase order. L. Paragraph 5.3.6 with the exception of paragraph 5.3.6.5 and 5.3.6.7.1 are required. M. Paragraph 5.3.6.6 and 5.3.6.6.2 are required. N. Paragraph 5.3.6.6.1 is not required unless specifically cited elsewhere in Section "C" of this contract/purchase order. O. The marking requirement is stated elsewhere in Section "C" of this contract/purchase order. P. Interface requirements are as specified on the drawings provided with this contract/purchase order or the primary equipment performance MIL-SPEC or STD cited in Section "C" of this contract/purchase order. Q. NA to this contract/purchase order. R. All Class I changes to either a Government owned Configuration Identification (CI) or baseline configuration shall be submitted to the Procurement Contracting Officer for review and subsequent approval - conditional approval or disapproval. NDI, COTS, and PDI items previously accepted by the Government shall be submitted as above. This process does not excuse the contractor from initially offering to the Government an item which meets the minimum technical and operational requirements set forth in this contract/ purchase order. S. Preliminary Change Notices and Advance Change Study Notices are not required. T. NA to this contract/purchase order. U. and V. Class II Engineering Change Proposal (ECP) may be carried through provided the Government QAR reviews and concurs with the classification review which resulted in the ECP being classified as Class II. W. Paragraph 5.4.3 is required. X. Paragraph 5.4.4 is required. Y. NORS are not required for this c

Notice and amendment history

Attachments

Select a filename to open the official SAM.gov notice and access the file.