This solicitation, set aside for small businesses, requires work on locker room and bathroom flooring and locker replacement in Novato, CA. Key tasks include providing temporary sanitation facilities and submitting an Asbestos and Lead Survey Report. [4][1][2]
Award based on lowest acceptable priced offer. [3]
Watch items
Temporary mobile restroom/shower facilities needed. [1]
Asbestos and Lead Survey Report is a deliverable. [2]
Sources
Construction+Solicitation+PAC+Strike+Team+Bathroom+Renovations.pdf2.2 Specific Work Items 2.2.1 Temporary Sanitation Facilities Scope: Prior to starting any interior demolition, the contractor shall provide, install, and maintain temporary mobile restroom, shower, and handwashing facilities on-site. Requirements: These facilities must fully accommodate base personnel for the duration of the locker room shutdown.
2.2 Specific Work Items 2.2.1 Temporary Sanitation Facilities Scope: Prior to starting any interior demolition, the contractor shall provide, install, and maintain temporary mobile restroom, shower, and handwashing facilities on-site. Requirements: These facilities must fully accommodate base personnel for the duration of the locker room shutdown.
Section M – Evaluation factors for Award Basis for award: Award shall be made to the responsible offeror submitting the lowest priced offer that is evaluated as acceptable all evaluation criteria.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
This requirement is set aside for small businesses. Offers are due by email to the contracting officer (primary point of contact) and contract specialist (secondary point of contact) by the due date on this announcement. The contractor shall perform the required specified tasks and all implied tasks required by the Statement of Work. Please see the attachments to this announcement for the solicitation and supporting documents. Questions are due to the contracting officer and contract specialist by 11 September 2026. Questions submitted after this date may not be answered prior to the closing of this solicitation.
What changed
No field-level changes were detected between related notices.