Scope
Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.
VETERANS AFFAIRS, DEPARTMENT OF · VETERANS AFFAIRS, DEPARTMENT OF · 246-NETWORK CONTRACTING OFFICE 6 (36C246)
This solicitation requires providing chilled water from Building 31 to serve Buildings 42 and 43, bypassing existing chillers during normal operation. New work includes installing additional pumps in Building 42 for the Audiology line. [2][1]
The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government.
Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.
Set-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government.
Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.
The Project Manager shall identify the different report formats that the A/E shall provide based upon the monthly schedule updates.
Cement and Water Factor (See Table I): W.G.
When a resubmission, add alphabetic suffix on submittal description.
Set-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Salisbury, NC, 28144, USA
Posted Aug 6, 2026; Responses due Sep 11, 2026, 8:30 PM UTC; Archive date Sep 26, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Provide chilled water from the building 31 primary chiller to serve Buildings 42 and 43, bypassing the existing chillers in 42 and 43 during normal operation. Normal Operation (Primary from Building 31) • Building 42 and Building 43 are served directly from building 31 chilled-water plant. • The existing chillers for 42 and 43 are isolated and not in use. • Valves and actuators shall be connected to the Building Management System (BMS) and automatically controlled for mode selection. Bypass Mode (Local Chillers in Service) • Building 42: The existing chiller serves the 2" chilled-water line supplying Audiology. Glycol shall be replenished through the pot feeder. • Building 43: The existing chiller serves the 3" chilled-water line supplying the building. Glycol shall be replenished through the pot feeder. New Work / Modifications • Install additional pumps in Building 42 to serve the 2" chilled-water line to Audiology.