Place of performanceSalem, VA, 24153, United States
Opportunity summary
Source-cited
This solicitation requires a contractor to perform masonry work, including rebuilding a brick column, at a site in Salem, VA, with a 90-day performance period. The contract is designated as a Small Business Set Aside - Total, and responses are due by September 10, 2026. [4]
Key points
Work involves masonry repair, including rebuilding a brick column. [4]
Evaluation considers the technical understanding of the requirements. [2]
Watch items
Prohibitions exist regarding certain telecommunications equipment. [1]
Offerors only need to submit an overall proposed price initially. [3]
Sources
S02-36C24626Q0966-Solicitation-Masonry+Work+Bldg+7+8.26.26.pdfSee sections 1823 through 1825 and 1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers. (d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract. (1) Certain telecommunications and video surveillance equipment, systems, or services. (i) Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system (paragraph (a)(1)(B) of section 889 of the
S02-36C24626Q0966-Solicitation-Masonry+Work+Bldg+7+8.26.26.pdfFACTOR 1: TECHNICAL FACTOR The evaluation process will consider whether the quote demonstrates a clear understating of the technical features involved in meeting the requirements of the solicitation.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sources
See sections 1823 through 1825 and 1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers. (d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract. (1) Certain telecommunications and video surveillance equipment, systems, or services. (i) Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system (paragraph (a)(1)(B) of section 889 of the John S.
36C24626Q0966 Page 38 of 48 (iii) A description of the products or services that the Contractor identifies or has reason to suspect is prohibited (include brand; model number, such as the original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable); (iv) The entity that produced the product or service (include entity name, unique entity identifier, Contractor and Government Entity (CAGE) code, facilities responsible for design, fabrication, assembly, packaging, and test of the product, and whether the entity was the OEM or a distributor (provide manufacturer codes and distributor codes used for the product)); (v) Description of the functionality of the product or service and how that functionality impacts the risk to the product or service; (vi) An explanation of any factors relevant to determining if the product or service should be permitted by an applicable exception, exemption, or waiver (if the contractor would like the Government to consider a waiver, and asks for such a waiver); (vii) Whether alternative products or services are available that would comply with the prohibition; (viii) If the product or service is related to item maintenance, include the following information on the item being maintained: (A) Brand; (B) Model number, OEM number, manufacturer part number, or wholesaler number; and (C) Item description, as applicable. (ix) Any readily available information about mitigation actions implemented or recommended. (2) If a report must be submitted to a contracting office, the Contractor shall submit the report as follows: (i) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil. (ii) For all other contracting offices, the Contractor shall report to the Contracting Officer. (iii) For indefinite delivery contracts, the Contractor shall report to both the contracting office for the indefinite delivery contract and the contracting office for any affected order. (3) If the report provided does not contain any of the information required by paragraph (h)(1) of this clause, and the contractor later discovers new information that is required by paragraph (h)(1) of this clause, then the contractor shall submit a subsequent report within 72 hours of discovering the new information. (4) The contractor shall also report the information in paragraph (h)(1) if the contractor wishes to ask for a waiver of the requirements of a new FASCSA order being applied through modification.
For Federal Supply Schedules, Governmentwide acquisition contracts, multi-agency contracts or any other procurement instrument intended for use by multiple agencies, upon notification from the Contracting Officer, during the performance of the contract, the Contractor shall promptly make any necessary changes or modifications to remove any product or service produced or provided by a source that this clause prohibits. (h) General report. (1) If the Contractor identifies or is notified by any source, (including a subcontractor at any tier), that any product or service provided or used (or to be provided or used) during contract performance does not comply with any prohibition in this clause, then the Contractor shall report the following information, or as much information is known, in writing to the contracting office as identified in paragraph (h)(2) within 72 hours: (i) Contract number and order number, if applicable; (ii) The specific prohibition the product or service is not complying with;
FACTOR 1: TECHNICAL FACTOR The evaluation process will consider whether the quote demonstrates a clear understating of the technical features involved in meeting the requirements of the solicitation.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
Contractor to supply labor, material and equipment to perform the masonry project to repair the column in the fence alongside Roanoke Blvd.: Load, Deliver & Erect Scaffolding as Necessary Rebuild Brick Column to Original w/ New Face Brick (53-DD Modular) & New Brick Ties Install Existing Concrete Column Cap Clean Entire Jobsite Return to Pressure Wash Entire Work Area Disassemble, Load & Remove Scaffolding from Jobsite . The period of performance will be 90 days from NTP. VA to provide access to site.
What changed
No field-level changes were detected between related notices.
Notice history
Solicitation · LatestPosted Aug 26, 2026 · response deadline Sep 10, 2026, 9:30 PM UTC
Attachments
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.