4310--610 - COMPRESSORS Boiler Plant Bldg 76 - ENGINEERING, NIHCS Amendment to Answer Contractor Questions

Solicitation number36C25026Q0889

VETERANS AFFAIRS, DEPARTMENT OF · VETERANS AFFAIRS, DEPARTMENT OF · 250-NETWORK CONTRACT OFFICE 10 (36C250)

View opportunity on SAM.gov ↗
Response deadlineSep 10, 2026, 8:00 PM UTC
Deadline status7 days remaining
PostedAug 24, 2026
Record refreshedSep 2, 2026
Place of performanceDepartment Of Veterans Affairs VA Northern Indiana Healthcare System 1700 East 38th Street, Marion, IN, 46953, United States

Opportunity summary

Source-cited

This RFQ from the Veterans Affairs is for compressors for Boiler Plant Bldg 76, with a response deadline of September 10, 2026. The procurement is designated as a Small Business Set Aside - Total. [5]

Key points

  • Pricing must be submitted within Section B of SF 1449. [3]
  • Evaluation factors are detailed under 52.212-2 for commercial products. [4]

Watch items

  • Prohibitions exist regarding certain telecommunications equipment. [1]
  • Payment occurs after delivery, installation, and acceptance. [2]

Sources

  1. 36C25026Q0889-0001+-+Air+Compressor+Updated+RFQ.pdfSee sections 1823 through 1825 and 1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers. (d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract. (1) Certain telecommunications and video surveillance equipment, systems, or services. (i) Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system (paragraph (a)(1)(B) of section 889 of the
  2. 36C25026Q0889-0001+-+Air+Compressor+Updated+RFQ.pdf36C25026Q0889 Page 20 of 30 changes or modifications to remove any product or service produced or provided by a source that this clause prohibits. (h) General report. (1) If the Contractor identifies or is notified by any source, (including a subcontractor at any tier), that any product or service provided or used (or to be provided or used) during contract performance does not comply with any prohibition in this clause, then the Contractor shall report the following information, or as much information is known, in writing to the contracting office as identified in paragraph (h)(2) within 72 hours: (i) Contract number and order number, if applicable; (ii) The specific prohibition the product
  3. 36C25026Q0889-0001+-+Air+Compressor+Updated+RFQ.pdfSubmittals: File #1: General Information and Price/Cost Schedule: The offeror shall submit their pricing within the schedule, Section B, of SF 1449.
  4. 36C25026Q0889-0001+-+Air+Compressor+Updated+RFQ.pdf(End of Addendum to 52.212-1) 36C25026Q0889 Page 30 of 30 E.5 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION) (a) Evaluation factors.
  5. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

See sections 1823 through 1825 and 1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers. (d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract. (1) Certain telecommunications and video surveillance equipment, systems, or services. (i) Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system (paragraph (a)(1)(B) of section 889 of the John S.

Scope

36C25026Q0889 Page 20 of 30 changes or modifications to remove any product or service produced or provided by a source that this clause prohibits. (h) General report. (1) If the Contractor identifies or is notified by any source, (including a subcontractor at any tier), that any product or service provided or used (or to be provided or used) during contract performance does not comply with any prohibition in this clause, then the Contractor shall report the following information, or as much information is known, in writing to the contracting office as identified in paragraph (h)(2) within 72 hours: (i) Contract number and order number, if applicable; (ii) The specific prohibition the product or service is not complying with; (iii) A description of the products or services that the Contractor identifies or has reason to suspect is prohibited (include brand; model number, such as the original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable); (iv) The entity that produced the product or service (include entity name, unique entity identifier, Contractor and Government Entity (CAGE) code, facilities responsible for design, fabrication, assembly, packaging, and test of the product, and whether the entity was the OEM or a distributor (provide manufacturer codes and distributor codes used for the product)); (v) Description of the functionality of the product or service and how that functionality impacts the risk to the product or service; (vi) An explanation of any factors relevant to determining if the product or service should be permitted by an applicable exception, exemption, or waiver (if the contractor would like the Government to consider a waiver, and asks for such a waiver); (vii) Whether alternative products or services are available that would comply with the prohibition; (viii) If the product or service is related to item maintenance, include the following information on the item being maintained: (A) Brand; (B) Model number, OEM number, manufacturer part number, or wholesaler number; and (C) Item description, as applicable. (ix) Any readily available information about mitigation actions implemented or recommended. (2) If a report must be submitted to a contracting office, the Contractor shall submit the report as follows: (i) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil. (ii) For all other contracting offices, the Contractor shall report to the Contracting Officer. (iii) For indefinite delivery contracts, the Contractor shall report to both the contracting office for the indefinite delivery contract and the contracting office for any affected order. (3) If the report provided does not contain any of the information required by paragraph (h)(1) of this clause, and the contractor later discovers new information that is required by paragraph (h)(1) of this clause, then the contractor shall submit a subsequent report within 72 hours of discovering the new information. (4) The contractor shall also report the information in paragraph (h)(1) if the contractor wishes to ask for a waiver of the requirements of a new FASCSA order being applied through modification. (i) New FASCSA orders report. (1) During contract performance, the Contractor shall review SAM at least once every three months, or as advised by the Contracting Officer, to check for covered articles subject to FASCSA order(s), or for products or services produced by a source subject to FASCSA order(s) not currently identified under paragraph (e) of this clause. (2) If the Contractor identifies a new FASCSA order(s) that could impact their supply chain, then the Contractor shall conduct a reasonable inquiry to identify whether a covered article or product or service produced or provided by a source subject to the FASCSA order(s) was

Place of performance

Department Of Veterans Affairs VA Northern Indiana Healthcare System 1700 East 38th Street, Marion, IN, 46953, USA

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

RFQ 36C25026Q0889 Questions and Answers The solicitation references both VAAR 852.219-75 and 852.219-76 regarding the Limitations on Subcontracting certification. Which certification must be completed and submitted with our quotation, and where can we obtain the required form? Answer: The VARR references concerning the Limitations on Subcontracting were mistakenly put in the RFQ. All mentions of VAAR 852.219-75 and VAAR 852.219-76 have been removed from the RFQ. How will the limitation on subcontracting be calculated for this requirement, considering that it includes equipment, materials, removal, installation, electrical and mechanical connections, and startup services? Answer: Limitations on subcontracting are not pertinent to this RFQ. All mentions of VAAR 852.219-75 and VAAR 852.219-76 have been removed from the RFQ. The site-visit RSVP deadline is listed as Friday, August 29, 2026, but August 29 falls on a Saturday. Is the correct RSVP deadline Friday, August 28, or Saturday, August 29? Also, is attendance at the site visit mandatory to submit a responsive quotation? Answer: The site-visit RSVP deadline is Friday, August 28, 2026. Attendance at the site visit is not mandatory. The Statement of Work identifies the RA-11I Fixed Speed 4 11KW compressor. Is this exact manufacturer and model required, or will an equal compressor meeting or exceeding the listed horsepower, PSI, CFM, electrical, and operational requirements be accepted? Answer: All mention of any manufacturer verbiage has been removed from the RFQ. If an equivalent product is permitted, are there any additional specifications that must be met, including voltage, phase, tank size, dryer requirements, controls, connection sizes, or required manufacturer certifications? Answer: There is no longer any mention of any exact manufacturer. The solicitation requires a manufacturer authorization letter when the prime contractor is not the manufacturer. Will a letter from the manufacturer confirming that our proposed supplier or installing subcontractor is an authorized dealer or distributor satisfy this requirement, or must the letter specifically name V Notary Service LLC as the authorized seller? Answer: As stated in the RFQ, if a contractor is not the manufacturer of the products being offered, they must provide a letter/memo from the manufacturer stating they are authorized to sell/distribute the manufacturer s products. A letter/memo stating a subcontractor is authorized to sell/distribute the manufacturers products is not sufficient. The delivery schedule lists September 30, 2026, while the period of performance is October 1 through October 31, 2026. Should the two compressors and startup kits be delivered by September 30, with removal and installation performed during October? Answer: Any mention of a period of performance has been removed. The contractor is required to complete the three (3) line items in the RFQ 60 days after receipt of the order (ARO). Please confirm whether any bid bond, payment bond, performance bond, prevailing-wage determination, or special insurance coverage is required for this procurement. Answer: There is no requirement for any bid bond, payment bond, performance bond, prevailing wage determination, or special insurance coverage required for this requirement. Will payment be issued after the complete installation and acceptance of both compressors, or may the contractor invoice separately for delivered equipment and completed installation milestones? Answer: Payment will be made after the delivery, installation and acceptance of the products. Progress payments are not authorized.

What changed

Aug 24, 2026 · 3 fields changed
Title4310--610 - COMPRESSORS Boiler Plant Bldg 76 - ENGINEERING, NIHCS Marion VA Medical Center4310--610 - COMPRESSORS Boiler Plant Bldg 76 - ENGINEERING, NIHCS Amendment to Answer Contractor Questions
DescriptionAir Compressor removal and replacement at the Marion VA Medical Center.RFQ 36C25026Q0889 Questions and Answers The solicitation references both VAAR 852.219-75 and 852.219-76 regarding the Limitations on Subcontracting certification. Which certification must be completed and submitted with our quotation, and where can we obtain the required form? Answer: The VARR references concerning the Limitations on Subcontracting were mistakenly put in the RFQ. All mentions of VAAR 852.219-75 and VAAR 852.219-76 have been removed from the RFQ. How will the limitation on subcontracting be calculated for this requirement, considering that it includes equipment, materials, removal, installation, electrical and mechanical connections, and startup services? Answer: Limitations on subcontracting are not pertinent to this RFQ. All mentions of VAAR 852.219-75 and VAAR 852.219-76 have been removed from the RFQ. The site-visit RSVP deadline is listed as Friday, August 29, 2026, but August 29 falls on a Saturday. Is the correct RSVP deadline Friday, August 28, or Saturday, August 29? Also, is attendance at the site visit mandatory to submit a responsive quotation? Answer: The site-visit RSVP deadline is Friday, August 28, 2026. Attendance at the site visit is not mandatory. The Statement of Work identifies the RA-11I Fixed Speed 4 11KW compressor. Is this exact manufacturer and model required, or will an equal compressor meeting or exceeding the listed horsepower, PSI, CFM, electrical, and operational requirements be accepted? Answer: All mention of any manufacturer verbiage has been removed from the RFQ. If an equivalent product is permitted, are there any additional specifications that must be met, including voltage, phase, tank size, dryer requirements, controls, connection sizes, or required manufacturer certifications? Answer: There is no longer any mention of any exact manufacturer. The solicitation requires a manufacturer authorization letter when the prime contractor is not the manufacturer. Will a letter from the manufacturer confirming that our proposed supplier or installing subcontractor is an authorized dealer or distributor satisfy this requirement, or must the letter specifically name V Notary Service LLC as the authorized seller? Answer: As stated in the RFQ, if a contractor is not the manufacturer of the products being offered, they must provide a letter/memo from the manufacturer stating they are authorized to sell/distribute the manufacturer s products. A letter/memo stating a subcontractor is authorized to sell/distribute the manufacturers products is not sufficient. The delivery schedule lists September 30, 2026, while the period of performance is October 1 through October 31, 2026. Should the two compressors and startup kits be delivered by September 30, with removal and installation performed during October? Answer: Any mention of a period of performance has been removed. The contractor is required to complete the three (3) line items in the RFQ 60 days after receipt of the order (ARO). Please confirm whether any bid bond, payment bond, performance bond, prevailing-wage determination, or special insurance coverage is required for this procurement. Answer: There is no requirement for any bid bond, payment bond, performance bond, prevailing wage determination, or special insurance coverage required for this requirement. Will payment be issued after the complete installation and acceptance of both compressors, or may the contractor invoice separately for delivered equipment and completed installation milestones? Answer: Payment will be made after the delivery, installation and acceptance of the products. Progress payments are not authorized.
Documents24

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.