Response deadlineSep 23, 2026, 2:00 PM UTC
Deadline status20 days remaining
PostedAug 25, 2026
Record refreshedSep 2, 2026
Place of performanceNorth Chicago, IL, 60064, United States
Opportunity summary
Source-citedThis solicitation requires providing all labor and materials for steam service renovations at Green House Homes 201 and 202, replacing existing gas boilers and steam generators. The work must be phased to minimize impact on residents, and the performance location is North Chicago, IL. [1]
Key points
- Project involves replacing gas boilers and steam generators for steam service. [1]
- Contractor must use only domestic construction material unless exceptions apply. [2]
Watch items
- Response deadline is September 23, 2026. [3]
- The opportunity is an SDVOSB Set-Aside. [3]
Sources
- 36C25226B0036_1+(2).docx
The representation and certification requirements of paragraph (f)(1) of this provision do not apply if— (i) This solicitation includes a trade agreements notice or certification (e.g., 52.225-6, Trade Agreements Certificate); and (ii) The offeror has certified that all the offered products to be supplied are designated country end products or designated country construction material. (iii) The offeror shall email questions concerning sensitive technology to the Department of State at *CISADA106@state.gov*. (g) *Disclosure*. (1) If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting
- 36C25226B0036_1+(2).docx
The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause. (2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: None (3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that- (i) The cost of domestic construction material would be unreasonable. (A) *For domestic construction material that is not a critical item or does not contain critical components.* (*1*) The cost of a particula
- Official SAM.gov notice
Set-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sourcesThe representation and certification requirements of paragraph (f)(1) of this provision do not apply if— (i) This solicitation includes a trade agreements notice or certification (e.g., 52.225-6, Trade Agreements Certificate); and (ii) The offeror has certified that all the offered products to be supplied are designated country end products or designated country construction material. (iii) The offeror shall email questions concerning sensitive technology to the Department of State at *CISADA106@state.gov*. (g) *Disclosure*. (1) If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliant: (i) Contract number and order number, if applicable; (ii) Identification of whether this disclosure relates to paragraph (c) on covered telecommunication equipment or services, or to paragraph (d) on FASCSA orders; (iii) A description of the products or services that the Contractor identifies or has reason to suspect is prohibited (include brand; model number, such as the original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable); (iv) The entity that produced the product or service (include entity name, unique entity identifier, Contractor and Government Entity (CAGE) code, facilities responsible for design, fabrication, assembly, packaging, and test of the product, and whether the entity was the OEM or a distributor (provide manufacturer codes and distributor codes used for the product)); (v) Description of the functionality of the product or service and how that functionality impacts the risk to the product or service; (vi) An explanation of any factors relevant to determining if the product or service should be permitted by an applicable exception, exemption, or waiver (if the offeror would like the Government to consider a waiver); (vii) Whether alternative products or services are available that would be compliant with the prohibition; (viii) If the product or service is related to item maintenance, include the following information on the item being maintained: (A) Brand; (B) Model number, OEM number, manufacturer part number, or wholesaler number; and (C) Item description, as applicable. (ix) Any readily available information about mitigation actions undertaken or recommended. (2) If a disclosure is required to be submitted to a contracting office, the offeror shall submit the disclosure as follows: (i) If a Department of Defense contracting office, the offeror shall submit the disclosure to the website at [*https://dibnet.dod.mil*](https://dibnet.dod.mil). (ii) For all other contracting offices, the Offeror shall submit the disclosure to the Contracting Officer. (3) If the disclosure provided does not contain any of the information required by paragraph (1), and the Offeror later discovers new information that is required by paragraph (1), then the Offeror shall submit a subsequent disclosure within 72 hours of discovering the new information. (h) *Executive agency review of disclosures*.
Scope
N O C O D E TRANSMITTAL NUMBER I T E M N O D A T A I N S T R U C T I O N S S C H E D U L E S S T A T E M E N T S SPECIFCATION PARAGRAPH NUMBER DESCRIPTION OF ITEM SUBMITTED 01 45 00 Quality Control 1.4 Preconstruction Submittal X X X 1.4 Design Data X X X 1.4 Test Reports X X X 01 45 29 Testing Laboratory Services 1.3 Accreditation Requirements and Scope of Accreditation X X 1.3 Written Reports X X 01 57 19 Temporary Environmental Controls 1.4 Environmental Protection Plan X X X X X 1.5 Demolition Debris Management Plan x 1.5 Monthly Construction & Demolition Debris Diversion and Disposal x 01 58 16 Temporary Interior Signage - No Submittals Required - - - - - - - - - - - - - 01 74 19 Construction Waste Management - No Submittals Required - - - - - - - - - - - - - 01 91 00 General Commissioning Requirements 1.12 Preliminary Commissioning Plan Submittal X X X X X X 1.12 Final Commissioning Plan Submittal X X X X X 1.12 Systems Functional Performance Test Procedure X X X X X X 1.12 Pre-Functional Checklists X X X 1.12 Test and Inspection Reports X X X X 1.12 Corrective Action Documents X X X X 1.12 Preliminary Commissioning Report Submittal X X X X 1.12 Final Commissioning Report Submittal X X X X 1.12 Data for Commissioning X X X X X 3.9.C Training Module Submittals X DIVISION 02 – EXISTING CONDITIONS 02 21 13 Site Surveys 1.3 B Survey Drawings X X 02 41 00 Demolition 1.2 B Related Work Section 01 35 26 Accident Prevention Plan - - - - - - - - - - - - - DIVISION 07 – THERMAL AND MOISTURE PROTECTION 07 84 00 Firestopping 1.3 B Sustainable Design Submittals X X 1.3 C Installer Qualifications X 1.3 D Inspector Qualifications X 1.3 E Manufacturer’s Literature and Data X 1.3 F Certificates X 1.3 G Certified Laboratory Test X 1.3 H Manufacturer’s Certificates X 1.5 B, C Quality Assurance X 3.1 A Examination X X 01 33 00 - 2
Deliverables
The contractor shall provide biweekly (or weekly based on progress meeting interval) computer-produced time, cost, and resource schedules and reports generated from project updates.
Evaluation
The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause. (2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: None (3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that- (i) The cost of domestic construction material would be unreasonable. (A) *For domestic construction material that is not a critical item or does not contain critical components.* (*1*) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent; (*2*) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(*1*) of this clause. (*3*) The procedures in paragraph (b)(3)(i)(A)(*2*) of this clause will no longer apply as of January 1, 2030. (B) *For domestic construction material that is a critical item or contains critical components.*
Submission
The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal.
Eligibility
Set-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Place of performance
North Chicago, IL, 60064, USA
Key dates
Posted Aug 25, 2026; Responses due Sep 23, 2026, 2:00 PM UTC; Archive date Oct 8, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.