Z2DA--635-21-139 | Repair Parking Garage 1 Deficiencies | CON (VA-26-00041470) (NRM - SCIP# VHA19-635-2023-52398)

Solicitation number36C25926R0082_1

VETERANS AFFAIRS, DEPARTMENT OF · VETERANS AFFAIRS, DEPARTMENT OF · NETWORK CONTRACT OFFICE 19 (36C259)

View opportunity on SAM.gov ↗
Response deadlineSep 17, 2026, 4:30 PM UTC
Deadline status14 days remaining
PostedSep 1, 2026
Record refreshedSep 2, 2026
Place of performanceOklahoma City, OK, 73104, United States

Opportunity summary

Source-cited

This solicitation is for repairing deficiencies in Parking Garage 1 for the VA in Oklahoma City, OK, and is set aside for SDVOSBs. The scope includes civil, structural, and electrical work, with a performance period of 270 calendar days after NTP. [2][1]

Key points

  • Project involves repairing Parking Garage 1 deficiencies. [2]
  • Set-aside is for Service-Disabled Veteran-Owned Small Business. [2]

Watch items

  • Proposals are due on September 17, 2026. [2]
  • Work must not impede the VAMC's mission. [2]

Sources

  1. 36C25926R0082_1.docxThis process permits tradeoffs between non-cost factors and cost/price and allows the Government to accept other than the lowest priced proposal or other than the highest rated proposal to achieve a best value contract award based on established evaluation criteria.
  2. Official SAM.gov noticeSet-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

The representation and certification requirements of paragraph (f)(1) of this provision do not apply if— (i) This solicitation includes a trade agreements notice or certification (e.g., 52.225-6, Trade Agreements Certificate); and (ii) The offeror has certified that all the offered products to be supplied are designated country end products or designated country construction material. (iii) The offeror shall email questions concerning sensitive technology to the Department of State at *CISADA106@state.gov*. (g) *Disclosure*. (1) If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliant: (i) Contract number and order number, if applicable; (ii) Identification of whether this disclosure relates to paragraph (c) on covered telecommunication equipment or services, or to paragraph (d) on FASCSA orders; (iii) A description of the products or services that the Contractor identifies or has reason to suspect is prohibited (include brand; model number, such as the original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable); (iv) The entity that produced the product or service (include entity name, unique entity identifier, Contractor and Government Entity (CAGE) code, facilities responsible for design, fabrication, assembly, packaging, and test of the product, and whether the entity was the OEM or a distributor (provide manufacturer codes and distributor codes used for the product)); (v) Description of the functionality of the product or service and how that functionality impacts the risk to the product or service; (vi) An explanation of any factors relevant to determining if the product or service should be permitted by an applicable exception, exemption, or waiver (if the offeror would like the Government to consider a waiver); (vii) Whether alternative products or services are available that would be compliant with the prohibition; (viii) If the product or service is related to item maintenance, include the following information on the item being maintained: (A) Brand; (B) Model number, OEM number, manufacturer part number, or wholesaler number; and (C) Item description, as applicable. (ix) Any readily available information about mitigation actions undertaken or recommended. (2) If a disclosure is required to be submitted to a contracting office, the offeror shall submit the disclosure as follows: (i) If a Department of Defense contracting office, the offeror shall submit the disclosure to the website at [*https://dibnet.dod.mil*](https://dibnet.dod.mil). (ii) For all other contracting offices, the Offeror shall submit the disclosure to the Contracting Officer. (3) If the disclosure provided does not contain any of the information required by paragraph (1), and the Offeror later discovers new information that is required by paragraph (1), then the Offeror shall submit a subsequent disclosure within 72 hours of discovering the new information. (h) *Executive agency review of disclosures*.

Scope

The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products, other than commercially available off-the-shelf items, or commercial services), in which the subcontractor may have Federal contract information residing in or transiting through its information system. (End of Provision) ## 4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract: (a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes.

Deliverables

For Federal Supply Schedules, Governmentwide acquisition contracts, multi-agency contracts or any other procurement instrument intended for use by multiple agencies, upon notification from the Contracting Officer, during the performance of the contract, the Contractor shall promptly make any necessary changes or modifications to remove any product or service produced or provided by a source that this clause prohibits. (h) *General report*.

Evaluation

This process permits tradeoffs between non-cost factors and cost/price and allows the Government to accept other than the lowest priced proposal or other than the highest rated proposal to achieve a best value contract award based on established evaluation criteria.

Submission

Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON SEPTEMBER 1, 2026. The purpose of this amendment is as follows: Post second site visit documents. Extend proposal to have needed time to answer submitted questions. Proposals due on September 17, 2026 @ 11:30 AM CST. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other terms and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 20, 2026. The purpose of this amendment is as follows: Post site visit documents and responses to questions. Clarify statement of work with updated information. Add second site visit on 8/25/26 @ 9:00 AM CST. Meet in the CCR trailer F5. See site map for location. Questions are due no later than 8/26/26 at 2:30 PM CST. Extend proposal due date to September 4, 2026 @ 11:30 AM CST. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other items and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 17, 2026. The solicitation has a technical issue with posting full amendments. Once the issue is resolved all responses to questions will be posted. Original: Project 635-21-139, Repair Parking Garage 1 Deficiencies OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a Contracting Officer s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment. The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the prime contractor have a Competent Person known as site superintendent on the job at all times (must have a 30-hour OSHA card), and that all contractor and subcontractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Storage and Security: Contractor shall be responsible for storage and security of the project site at East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. Contractor shall request Contracting Officer approve use bonded and insured off-site storage locations and COR shall access to view off-site stored materials and equipment. Parking: Contractor s personnel can park within project site, park on the fourth floor of the Parking Garage or utilize street parking in the neighborhood. Contractor shall not utilize adjacent parking lot for The Cathedral of Our Lady of Perpetual Help. Oklahoma City VA Medical Center shall not waive or make reimbursement for parking violations of the Contractor s personnel under any circumstances. Work Hours: Construction shall be performed during normal working hours Monday Fridays from 7:30 am to 3:30 pm excluding federal holidays unless requested and approved by the COR and 14-day notice is required. Federal holidays include: New Year's Day January 1st Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. Delivery Location: All work related to this contract shall be performed at the Parking Garage 1 located East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104 Payment Information: The contractor shall provide the following payment information for VA use. It must be an exact match with the information under the contract number in the Contract Registration (not the contractor s company or individual representative s registration) as well as with the information under the contractor s DUNS number in the System Award for Management http://www.SAM.gov. Mismatched information will result in rejected invoice. Company Name Legal Business Name and DBA (Doing Business As) Name Mailing Address Contact and Address Information Remittance Address Remit To Address Information Employer s Identification Number Federal Tax ID DUNS (Data Universal Numbering System) CODES, STANDARDS AND EXECUTIVE ORDERS: VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects: VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/). PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards VA BIM Manual V2.2 PG-18-5 Equipment Guide List H-18-8 VA Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards) PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides. Occupational, Safety and Health Administration (OSHA) Standards. National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1. ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification. Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1- 2013. Safety Standard for Refrigeration Systems ASHRAE Standard 15 2016.

What changed

Sep 1, 2026 · 3 fields changed
Response deadline2026-09-04T16:30:00+00:002026-09-17T16:30:00+00:00
DescriptionAN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 20, 2026. The purpose of this amendment is as follows: Post site visit documents and responses to questions. Clarify statement of work with updated information. Add second site visit on 8/25/26 @ 9:00 AM CST. Meet in the CCR trailer F5. See site map for location. Questions are due no later than 8/26/26 at 2:30 PM CST. Extend proposal due date to September 4, 2026 @ 11:30 AM CST. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other items and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 17, 2026. The solicitation has a technical issue with posting full amendments. Once the issue is resolved all responses to questions will be posted. Original: Project 635-21-139, Repair Parking Garage 1 Deficiencies OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a Contracting Officer s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment. The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the prime contractor have a Competent Person known as site superintendent on the job at all times (must have a 30-hour OSHA card), and that all contractor and subcontractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Storage and Security: Contractor shall be responsible for storage and security of the project site at East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. Contractor shall request Contracting Officer approve use bonded and insured off-site storage locations and COR shall access to view off-site stored materials and equipment. Parking: Contractor s personnel can park within project site, park on the fourth floor of the Parking Garage or utilize street parking in the neighborhood. Contractor shall not utilize adjacent parking lot for The Cathedral of Our Lady of Perpetual Help. Oklahoma City VA Medical Center shall not waive or make reimbursement for parking violations of the Contractor s personnel under any circumstances. Work Hours: Construction shall be performed during normal working hours Monday Fridays from 7:30 am to 3:30 pm excluding federal holidays unless requested and approved by the COR and 14-day notice is required. Federal holidays include: New Year's Day January 1st Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. Delivery Location: All work related to this contract shall be performed at the Parking Garage 1 located East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104 Payment Information: The contractor shall provide the following payment information for VA use. It must be an exact match with the information under the contract number in the Contract Registration (not the contractor s company or individual representative s registration) as well as with the information under the contractor s DUNS number in the System Award for Management http://www.SAM.gov. Mismatched information will result in rejected invoice. Company Name Legal Business Name and DBA (Doing Business As) Name Mailing Address Contact and Address Information Remittance Address Remit To Address Information Employer s Identification Number Federal Tax ID DUNS (Data Universal Numbering System) CODES, STANDARDS AND EXECUTIVE ORDERS: VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects: VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/). PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards VA BIM Manual V2.2 PG-18-5 Equipment Guide List H-18-8 VA Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards) PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides. Occupational, Safety and Health Administration (OSHA) Standards. National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1. ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification. Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1- 2013. Safety Standard for Refrigeration Systems ASHRAE Standard 15 2016.AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON SEPTEMBER 1, 2026. The purpose of this amendment is as follows: Post second site visit documents. Extend proposal to have needed time to answer submitted questions. Proposals due on September 17, 2026 @ 11:30 AM CST. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other terms and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 20, 2026. The purpose of this amendment is as follows: Post site visit documents and responses to questions. Clarify statement of work with updated information. Add second site visit on 8/25/26 @ 9:00 AM CST. Meet in the CCR trailer F5. See site map for location. Questions are due no later than 8/26/26 at 2:30 PM CST. Extend proposal due date to September 4, 2026 @ 11:30 AM CST. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other items and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 17, 2026. The solicitation has a technical issue with posting full amendments. Once the issue is resolved all responses to questions will be posted. Original: Project 635-21-139, Repair Parking Garage 1 Deficiencies OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a Contracting Officer s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment. The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the prime contractor have a Competent Person known as site superintendent on the job at all times (must have a 30-hour OSHA card), and that all contractor and subcontractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Storage and Security: Contractor shall be responsible for storage and security of the project site at East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. Contractor shall request Contracting Officer approve use bonded and insured off-site storage locations and COR shall access to view off-site stored materials and equipment. Parking: Contractor s personnel can park within project site, park on the fourth floor of the Parking Garage or utilize street parking in the neighborhood. Contractor shall not utilize adjacent parking lot for The Cathedral of Our Lady of Perpetual Help. Oklahoma City VA Medical Center shall not waive or make reimbursement for parking violations of the Contractor s personnel under any circumstances. Work Hours: Construction shall be performed during normal working hours Monday Fridays from 7:30 am to 3:30 pm excluding federal holidays unless requested and approved by the COR and 14-day notice is required. Federal holidays include: New Year's Day January 1st Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. Delivery Location: All work related to this contract shall be performed at the Parking Garage 1 located East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104 Payment Information: The contractor shall provide the following payment information for VA use. It must be an exact match with the information under the contract number in the Contract Registration (not the contractor s company or individual representative s registration) as well as with the information under the contractor s DUNS number in the System Award for Management http://www.SAM.gov. Mismatched information will result in rejected invoice. Company Name Legal Business Name and DBA (Doing Business As) Name Mailing Address Contact and Address Information Remittance Address Remit To Address Information Employer s Identification Number Federal Tax ID DUNS (Data Universal Numbering System) CODES, STANDARDS AND EXECUTIVE ORDERS: VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects: VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/). PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards VA BIM Manual V2.2 PG-18-5 Equipment Guide List H-18-8 VA Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards) PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides. Occupational, Safety and Health Administration (OSHA) Standards. National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1. ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification. Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1- 2013. Safety Standard for Refrigeration Systems ASHRAE Standard 15 2016.
Documents1215
Aug 20, 2026 · 4 fields changed
Response deadline2026-08-31T16:30:00+00:002026-09-04T16:30:00+00:00
Archive date2026-11-302026-12-31
DescriptionAN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 17, 2026. The solicitation has a technical issue with posting full amendments. Once the issue is resolved all responses to questions will be posted. Original: Project 635-21-139, Repair Parking Garage 1 Deficiencies OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a Contracting Officer s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment. The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the prime contractor have a Competent Person known as site superintendent on the job at all times (must have a 30-hour OSHA card), and that all contractor and subcontractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Storage and Security: Contractor shall be responsible for storage and security of the project site at East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. Contractor shall request Contracting Officer approve use bonded and insured off-site storage locations and COR shall access to view off-site stored materials and equipment. Parking: Contractor s personnel can park within project site, park on the fourth floor of the Parking Garage or utilize street parking in the neighborhood. Contractor shall not utilize adjacent parking lot for The Cathedral of Our Lady of Perpetual Help. Oklahoma City VA Medical Center shall not waive or make reimbursement for parking violations of the Contractor s personnel under any circumstances. Work Hours: Construction shall be performed during normal working hours Monday Fridays from 7:30 am to 3:30 pm excluding federal holidays unless requested and approved by the COR and 14-day notice is required. Federal holidays include: New Year's Day January 1st Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. Delivery Location: All work related to this contract shall be performed at the Parking Garage 1 located East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104 Payment Information: The contractor shall provide the following payment information for VA use. It must be an exact match with the information under the contract number in the Contract Registration (not the contractor s company or individual representative s registration) as well as with the information under the contractor s DUNS number in the System Award for Management http://www.SAM.gov. Mismatched information will result in rejected invoice. Company Name Legal Business Name and DBA (Doing Business As) Name Mailing Address Contact and Address Information Remittance Address Remit To Address Information Employer s Identification Number Federal Tax ID DUNS (Data Universal Numbering System) CODES, STANDARDS AND EXECUTIVE ORDERS: VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects: VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/). PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards VA BIM Manual V2.2 PG-18-5 Equipment Guide List H-18-8 VA Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards) PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides. Occupational, Safety and Health Administration (OSHA) Standards. National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1. ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification. Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1- 2013. Safety Standard for Refrigeration Systems ASHRAE Standard 15 2016.AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 20, 2026. The purpose of this amendment is as follows: Post site visit documents and responses to questions. Clarify statement of work with updated information. Add second site visit on 8/25/26 @ 9:00 AM CST. Meet in the CCR trailer F5. See site map for location. Questions are due no later than 8/26/26 at 2:30 PM CST. Extend proposal due date to September 4, 2026 @ 11:30 AM CST. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other items and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 17, 2026. The solicitation has a technical issue with posting full amendments. Once the issue is resolved all responses to questions will be posted. Original: Project 635-21-139, Repair Parking Garage 1 Deficiencies OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a Contracting Officer s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment. The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the prime contractor have a Competent Person known as site superintendent on the job at all times (must have a 30-hour OSHA card), and that all contractor and subcontractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Storage and Security: Contractor shall be responsible for storage and security of the project site at East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. Contractor shall request Contracting Officer approve use bonded and insured off-site storage locations and COR shall access to view off-site stored materials and equipment. Parking: Contractor s personnel can park within project site, park on the fourth floor of the Parking Garage or utilize street parking in the neighborhood. Contractor shall not utilize adjacent parking lot for The Cathedral of Our Lady of Perpetual Help. Oklahoma City VA Medical Center shall not waive or make reimbursement for parking violations of the Contractor s personnel under any circumstances. Work Hours: Construction shall be performed during normal working hours Monday Fridays from 7:30 am to 3:30 pm excluding federal holidays unless requested and approved by the COR and 14-day notice is required. Federal holidays include: New Year's Day January 1st Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. Delivery Location: All work related to this contract shall be performed at the Parking Garage 1 located East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104 Payment Information: The contractor shall provide the following payment information for VA use. It must be an exact match with the information under the contract number in the Contract Registration (not the contractor s company or individual representative s registration) as well as with the information under the contractor s DUNS number in the System Award for Management http://www.SAM.gov. Mismatched information will result in rejected invoice. Company Name Legal Business Name and DBA (Doing Business As) Name Mailing Address Contact and Address Information Remittance Address Remit To Address Information Employer s Identification Number Federal Tax ID DUNS (Data Universal Numbering System) CODES, STANDARDS AND EXECUTIVE ORDERS: VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects: VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/). PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards VA BIM Manual V2.2 PG-18-5 Equipment Guide List H-18-8 VA Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards) PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides. Occupational, Safety and Health Administration (OSHA) Standards. National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1. ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification. Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1- 2013. Safety Standard for Refrigeration Systems ASHRAE Standard 15 2016.
Documents712
Aug 17, 2026 · 3 fields changed
Response deadline2026-08-24T16:30:00+00:002026-08-31T16:30:00+00:00
Archive date2026-11-182026-11-30
DescriptionProject 635-21-139, Repair Parking Garage 1 Deficiencies OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a Contracting Officer s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment. The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the prime contractor have a Competent Person known as site superintendent on the job at all times (must have a 30-hour OSHA card), and that all contractor and subcontractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Storage and Security: Contractor shall be responsible for storage and security of the project site at East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. Contractor shall request Contracting Officer approve use bonded and insured off-site storage locations and COR shall access to view off-site stored materials and equipment. Parking: Contractor s personnel can park within project site, park on the fourth floor of the Parking Garage or utilize street parking in the neighborhood. Contractor shall not utilize adjacent parking lot for The Cathedral of Our Lady of Perpetual Help. Oklahoma City VA Medical Center shall not waive or make reimbursement for parking violations of the Contractor s personnel under any circumstances. Work Hours: Construction shall be performed during normal working hours Monday Fridays from 7:30 am to 3:30 pm excluding federal holidays unless requested and approved by the COR and 14-day notice is required. Federal holidays include: New Year's Day January 1st Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. Delivery Location: All work related to this contract shall be performed at the Parking Garage 1 located East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104 Payment Information: The contractor shall provide the following payment information for VA use. It must be an exact match with the information under the contract number in the Contract Registration (not the contractor s company or individual representative s registration) as well as with the information under the contractor s DUNS number in the System Award for Management http://www.SAM.gov. Mismatched information will result in rejected invoice. Company Name Legal Business Name and DBA (Doing Business As) Name Mailing Address Contact and Address Information Remittance Address Remit To Address Information Employer s Identification Number Federal Tax ID DUNS (Data Universal Numbering System) CODES, STANDARDS AND EXECUTIVE ORDERS: VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects: VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/). PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards VA BIM Manual V2.2 PG-18-5 Equipment Guide List H-18-8 VA Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards) PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides. Occupational, Safety and Health Administration (OSHA) Standards. National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1. ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification. Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1- 2013. Safety Standard for Refrigeration Systems ASHRAE Standard 15 2016.AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 17, 2026. The solicitation has a technical issue with posting full amendments. Once the issue is resolved all responses to questions will be posted. Original: Project 635-21-139, Repair Parking Garage 1 Deficiencies OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a Contracting Officer s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment. The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the prime contractor have a Competent Person known as site superintendent on the job at all times (must have a 30-hour OSHA card), and that all contractor and subcontractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Storage and Security: Contractor shall be responsible for storage and security of the project site at East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. Contractor shall request Contracting Officer approve use bonded and insured off-site storage locations and COR shall access to view off-site stored materials and equipment. Parking: Contractor s personnel can park within project site, park on the fourth floor of the Parking Garage or utilize street parking in the neighborhood. Contractor shall not utilize adjacent parking lot for The Cathedral of Our Lady of Perpetual Help. Oklahoma City VA Medical Center shall not waive or make reimbursement for parking violations of the Contractor s personnel under any circumstances. Work Hours: Construction shall be performed during normal working hours Monday Fridays from 7:30 am to 3:30 pm excluding federal holidays unless requested and approved by the COR and 14-day notice is required. Federal holidays include: New Year's Day January 1st Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. Delivery Location: All work related to this contract shall be performed at the Parking Garage 1 located East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104 Payment Information: The contractor shall provide the following payment information for VA use. It must be an exact match with the information under the contract number in the Contract Registration (not the contractor s company or individual representative s registration) as well as with the information under the contractor s DUNS number in the System Award for Management http://www.SAM.gov. Mismatched information will result in rejected invoice. Company Name Legal Business Name and DBA (Doing Business As) Name Mailing Address Contact and Address Information Remittance Address Remit To Address Information Employer s Identification Number Federal Tax ID DUNS (Data Universal Numbering System) CODES, STANDARDS AND EXECUTIVE ORDERS: VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects: VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/). PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards VA BIM Manual V2.2 PG-18-5 Equipment Guide List H-18-8 VA Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards) PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides. Occupational, Safety and Health Administration (OSHA) Standards. National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1. ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification. Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1- 2013. Safety Standard for Refrigeration Systems ASHRAE Standard 15 2016.

Notice history

  • Solicitation · LatestPosted Sep 1, 2026 · response deadline Sep 17, 2026, 4:30 PM UTC
  • SolicitationPosted Aug 20, 2026 · response deadline Sep 4, 2026, 4:30 PM UTC
  • SolicitationPosted Aug 17, 2026 · response deadline Aug 31, 2026, 4:30 PM UTC
  • SolicitationPosted Aug 11, 2026 · response deadline Aug 24, 2026, 4:30 PM UTC
  • SolicitationPosted Jul 23, 2026 · response deadline Aug 24, 2026, 4:30 PM UTC