← Active opportunities
OpenCombined Synopsis/Solicitation

PM Atlas CopCo Compressor

Solicitation number36C26226Q1410

VETERANS AFFAIRS, DEPARTMENT OF · VETERANS AFFAIRS, DEPARTMENT OF · 262-NETWORK CONTRACT OFFICE 22 (36C262)

View opportunity on SAM.gov ↗
Response deadlineSep 8, 2026, 5:00 PM UTC
Deadline status5 days remaining
PostedAug 27, 2026
Record refreshedSep 2, 2026
Place of performanceNorth Hills, CA, 91343, United States

Opportunity summary

Source-cited

This service contract is for preventative and corrective maintenance/repair of an Atlas Copco SF11 Compressor at a facility in North Hills, CA. The response deadline for this Small Business Set Aside is September 8, 2026. [4]

Key points

  • Maintenance includes replacing pumps, starters, and air filters. [4]
  • The Government will award the contract to the responsible offeror. [3]

Watch items

  • Contractor must review SAM quarterly for FASCSA compliance. [2]
  • Prohibitions exist regarding certain telecommunications equipment. [1]

Sources

  1. RFQ+Compressor+PM+Sepulveda+36C26226Q1410.pdfSee sections 1823 through 1825 and 1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers. (d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract. (1) Certain telecommunications and video surveillance equipment, systems, or services. (i) Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part 36C26226Q1410
  2. RFQ+Compressor+PM+Sepulveda+36C26226Q1410.pdf36C26226Q1410 Page 21 of 37 (h)(1) of this clause, then the contractor shall submit a subsequent report within 72 hours of discovering the new information. (4) The contractor shall also report the information in paragraph (h)(1) if the contractor wishes to ask for a waiver of the requirements of a new FASCSA order being applied through modification. (i) New FASCSA orders report. (1) During contract performance, the Contractor shall review SAM at least once every three months, or as advised by the Contracting Officer, to check for covered articles subject to FASCSA order(s), or for products or services produced by a source subject to FASCSA order(s) not currently identified under paragraph (e
  3. RFQ+Compressor+PM+Sepulveda+36C26226Q1410.pdfThe Government intends to award a contract resulting from this solicitation to the responsible offeror whose offer conforms to the technical requirements and the evaluation factors.
  4. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

See sections 1823 through 1825 and 1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers. (d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract. (1) Certain telecommunications and video surveillance equipment, systems, or services. (i) Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part 36C26226Q1410

Scope

36C26226Q1410 Page 21 of 37 (h)(1) of this clause, then the contractor shall submit a subsequent report within 72 hours of discovering the new information. (4) The contractor shall also report the information in paragraph (h)(1) if the contractor wishes to ask for a waiver of the requirements of a new FASCSA order being applied through modification. (i) New FASCSA orders report. (1) During contract performance, the Contractor shall review SAM at least once every three months, or as advised by the Contracting Officer, to check for covered articles subject to FASCSA order(s), or for products or services produced by a source subject to FASCSA order(s) not currently identified under paragraph (e) of this clause. (2) If the Contractor identifies a new FASCSA order(s) that could impact their supply chain, then the Contractor shall conduct a reasonable inquiry to identify whether a covered article or product or service produced or provided by a source subject to the FASCSA order(s) was provided to the Government or used during contract performance.

Deliverables

For Federal Supply Schedules, Governmentwide acquisition contracts, multi-agency contracts or any other procurement instrument intended for use by multiple agencies, upon notification from the Contracting Officer, during the performance of the contract, the Contractor shall promptly make any necessary changes or modifications to remove any product or service produced or provided by a source that this clause prohibits. (h) General report. (1) If the Contractor identifies or is notified by any source, (including a subcontractor at any tier), that any product or service provided or used (or to be provided or used) during contract performance does not comply with any prohibition in this clause, then the Contractor shall report 36C26226Q1410

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

This service contract is for the preventative and corrective maintenance/repair of the Atlas Copco SF11 Compressor located at the Greater Los Angeles Sepulveda Outpatient Clinic and Nursing Home facility. All repairs and maintenance to include; replacing pumps, starters, overloads, air filters and contacts and shall meet the requirements identified in the statement of work.

What changed

No field-level changes were detected between related notices.

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.