Scope
CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST CONTROL PLAN.
VETERANS AFFAIRS, DEPARTMENT OF · VETERANS AFFAIRS, DEPARTMENT OF · PCAC (36C776)
SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS.
CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST CONTROL PLAN.
SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR/VA FOR REVIEW AND APPROVAL.
SEE SMACNA 2005, FIGURE 9-16 INSULATION DUCT GASKET INSULATION SECTION "A-A" ACCESS PANEL CASING GASKET HANDLE INSIDE FLEXIBLE WASHER FACTORY FABRICATED LATCH SECTION "B-B" ACCESS DOOR INSULATION "B" "B" "A" "A" VRV FAN COIL UNIT (FCU) LOW VELOCITY SUPPLY AIR DUCTWORK.
**Project Manager (Qualifications) \*Qualifications should be provided back to the requestor to incorporate into their proposal, all Qualifications should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.** **One form shall be submitted for each Key Personnel Position requested.** | | | --- | | **1.
Set-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Pineville, LA, 71360, USA
Posted Aug 31, 2026; Responses due Sep 18, 2026, 7:00 PM UTC; Archive date Dec 19, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Amendment 0004 has been posted. Amendment 0004 extends the date for receipt of offers. The new date for receipt of offers is 9/18 at 3PM EDT. Amendment 0003 has been posted. Amendment 0003 provides the site visit sign-in sheet and agenda from the 8/20 site visit. Amendment 0002 has been posted. Amendment 0002 provides an updated Attachment 11 - Site Visit Details which includes a campus map. Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments. The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.