Solicitation
HATCH,MARINE
DEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · SPRMM1 DLA MECHANICSBURG
NAICS 336612PSC 2040Amended
Response deadlineSep 4, 2026
PostedJul 21, 2026
SolicitationSPRMM126QHC88
Notice ID3974f7b567d64c899969c3a68de908b7
Notice typeSolicitation
Set-aside
Place of performance
AwardNot posted
Notice description
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| PRODUCTION LOT TESTING|1|| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ZIE| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10||||||||||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (DEV 2026-O0042)(FEB 2026)|7|||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| PREFERENCE FOR PRIVATELY OWNED U.S.-FLAG COMMERCIAL VESSELS (DEV 2026-O0047)(MAR 2026))|2||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION OF FIRST ARTICLE TESTING|3|||| 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. Drawings or technical data are available for this item. Drawings for this solicitation will be accessed via the website, www.SAM.gov. Click the Search button and type the solicitation number in the box and hit enter. Links to the solicitation should follow on the right. Click the BLUE LINK with the name of the item that is identified as the "Updated Solicitation". Click to the left on "Attachments/Links" which will take you tothe link to request access to the drawings. Drawing access request should be submitted by the Data Custodian listed on your approved DD2345. Only the Data Custodian will be granted access to the controlled drawings. If there are problems accessing the drawings, please contact the buyer POC listed on this solicitation. 3. Delivery days_________aro. 4. Offer valid for _____ days. 5. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST state who the Original Equipment Manufacturer (OEM) is ?Commercial and Government Entity Code (CAGE) code? and the part number you are offering. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ 12. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four elements are met. Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per DFARS 215.101-2-70(a)(1)(i). This procurement requires Higher Level Inspection. This requirement is being solicited under FAR Part 18, Emergency Acquisitions, utilizing Emergency Acquisition Flexibilities (EAF) Authority. If there are any conflicts with PLT or FAT, the Navy procedures supersede, as the Navy owns the process. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the HATCH,MARINE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 2.3 ;Requests for additional government-owned documents should be submitted in writing to the contract officer responsible for the applicable order. Release of drawings or other documents will be approved and handled by the technical community for the system.; DRAWING DATA=WS19169 |53711| B| |D| | | | DRAWING DATA=WS19171 |53711| A| |D| | | | DRAWING DATA=WS19172 |53711| -| |D| | | | DRAWING DATA=WS19172 |53711| |1N |D| | | | DRAWING DATA=WS19173 |53711| -| |D| | | | DRAWING DATA=WS19173 |53711| |1N |D| | | | DRAWING DATA=WS19201 |53711| D| |D| | | | DRAWING DATA=5219976 |53711| J| |D| | | | DRAWING DATA=5219976 |53711| J|PL |D| | | | DRAWING DATA=6539789 |53711| A| |D| | | | DRAWING DATA=6661708 |53711| A| |D| | | | DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=ISO9001 | | | |160921|A| | | 3. REQUIREMENTS 3.1 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.2 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required. 3.3 Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required. 3.4 Marking - This item shall be physically identified in accordance with MIL-STD-130. 3.5 Soldering - The requirements for soldered electrical and electronic assemblies shall conform to IPC J-STD-001, Class ;3; . 3.6 Cage Code/Reference Number Items - The HATCH,MARINE furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;53711 6692849-39; 3.7 ;Sources who have prior approved FAT are waived CDRL requirements with the exception of PLT.; 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 First Article Test/Inspection (Contractor) - The Contractor shall conduct ;Non destructive; First Article Test/Inspection on ;1; unit(s) in accordance with requirements ;on drawing 5219976 ; . 4.3 First Article Compatibility Test (Government) - Upon satisfactory completion of the First Article Test/Inspection by the Contractor, ;1; unit(s) shall be shipped to ;NSWC, PHD; for compatibility test to assure satisfactory, form, fit and function within the applicable end item or system. Government First Article Compatibility Test shall consist of ;non destructive; testing. If the testing is nondestructive, the first article sample ;will; be returned.// 4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during the performance of the contract and for a period of four years after final delivery of supplies. 4.5 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.6 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.7 ;Sources who have prior approved FAT are waived CDRL requirements, with the exception of PLT.; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards),
Notice and amendment history
- Solicitation · LatestPosted Jul 21, 2026 · closes Sep 4, 2026
Attachments
No attachments are currently listed.