Combined Synopsis/Solicitation
NM FS SNTFE310 263(1) Gallinas Canyon Road
TRANSPORTATION, DEPARTMENT OF · FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Small Business Set Aside - TotalNAICS 541380PSC B519Amended
Response deadlineSep 3, 2026
PostedAug 27, 2026
Solicitation6982AF26Q000019
Notice ID3e645f7a40e140e7b993574fcb85fb08
Notice typeCombined Synopsis/Solicitation
Set-asideSmall Business Set Aside - Total
Place of performanceNM, 87731
AwardNot posted
Notice description
This RFQ is for geotechnical borings associated with the design and construction of Gallinas Canyon Road. The geotechnical investigation will gather subsurface data to inform the 30% project design and cost estimate. The program includes nineteen (19) planned boreholes. These boreholes fall into two categories: corridor characterization and bridge investigation. Project Locations and Descriptions: The Federal Highway Administration (FHWA), Central Federal Lands Highway Division, and the Forest Service are partnering to reconstruct a portion of FR 263, Gallinas Canyon Road. This reconstruction project includes roadway resurfacing, widening, and realignment. The realignment incorporates options for several bridge replacements and rock cuts. Gallinas Canyon lies within San Miguel County, NM. The project alignment begins at Burro Basin Trailhead and proceeds East for approximately 6 miles to the intersection of FR 263 and FR 156. The existing alignment consists of a narrow, winding road that crosses 15 bridges.
Notice and amendment history
- Combined Synopsis/Solicitation · LatestPosted Aug 27, 2026 · closes Sep 3, 2026
- Combined Synopsis/SolicitationPosted Aug 27, 2026 · closes Sep 3, 2026
- Combined Synopsis/SolicitationPosted Aug 18, 2026 · closes Sep 3, 2026
Attachments
Select a filename to open the official SAM.gov notice and access the file.