← Active opportunities
Combined Synopsis/Solicitation

Exterior Porches, Roofs and Stairs (3) Replacement

DEPT OF DEFENSE · DEPT OF THE NAVY · NAVAL RESEARCH LABORATORY

Small Business Set Aside - TotalNAICS 238190PSC Z2JZ
Response deadlineSep 21, 2026
PostedAug 31, 2026
Archive dateOct 6, 2026
SolicitationN0017326Q1904
Notice ID3e6a02fbdce94baa9b66357b483b37b0
Notice typeCombined Synopsis/Solicitation
Set-asideSmall Business Set Aside - Total
Place of performanceWashington, DC, 20375
Public-source intelligence

Source-backed opportunity brief

8 citations · 5 sources

By submission of its offer, the Offeror represents that it will not require its employees or subcontractors to sign or comply with Representation internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information ( , agency Office of the Inspector General). e.g. (v) Section 889(a)(1)(A) and section 889 (a)(1)(B) of Public Law 115-232.

Scope

Protocol. (f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions. in WAWF for this contract or task or delivery order: (1) The Contractor shall submit payment requests using the following document type(s): Document type. (i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher. (ii) For fixed price line items- (A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. n/a (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.) (B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Deliverables

See attachment 2 for a preliminary design for the new stairs and roofs (three (3)). o Kick-Off Meeting: The Govt will plan and coordinate a kick-off meeting within two (2) weeks of contract award. o Schedule: The awardee shall provide a project schedule within three (3) weeks of contract award. o Design Submittal: For design tasks, contractors shall provide the following, when applicable:  Shop Drawings  Foundation Drawings  Miscellaneous accessories Drawings  All preliminary drawings shall be submitted to the NRL Engineer in Charge (EIC) prior to any production, fabrication, or build. o Controlled Unclassified Information (CUI):  When noted in the Task order that project data is classified as CUI “Controlled Unclassified Information”, contractor shall handle, storage, reproduce and disposal of documents in accordance with 32 CFR Part 2002 and applicable agency policy.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Official notice text

This requirement is for the demolition of three (3) existing exterior metal stair sets with porch roofs and the design, fabrication and installation of replacement sets for the US Naval Research Laboratory (NRL), Bldg. A59. The full description and response requirements are included in the Request for Quotes (RFQ) N0017326Q1904 along with attachments. A site visit is required before submitting any proposal or quote. The site visit is scheduled for Wednesday, September 9, at 10:00am EDT at NRL. All visitors must notify NRL Contracts at least 2 days prior to the scheduled visit. If you are unable to attend on this date, another date may be requested, although the requested date/time may not be available. No change to the response date and time specified above will be granted based on an inability to visit NRL on the planned site visit day. Your quick response is appreciated to facilitate an award prior to current fiscal year end.

What changed

No field-level changes were detected between related notices.

Notice history

Attachments

Select a filename to open the source file. If a saved copy is not available yet, FedRoster will continue to the official notice.