Presolicitation
Operations and Maintenance (O&M) Services for the SBIWTP
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO · INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO · INTERNAT. BOUNDARY AND WATER COMM.
No Set aside usedNAICS 221320PSC M1NDAmended
Response deadlineSep 18, 2026
PostedAug 26, 2026
Solicitation191BWC27R0001
Notice ID4298e0cdc3fa4c22ae2587b8733ea1c6
Notice typePresolicitation
Set-asideNo Set aside used
Place of performanceSan Ysidro, CA, 92173
AwardNot posted
Notice description
1. Overview The United States Section of the International Boundary and Water Commission (USIBWC) intends to issue a Request for Proposals (RFP) for a performance?based, full?service Operations and Maintenance (O&M) contract for the South Bay International Wastewater Treatment Plant (SBIWTP) and associated conveyance assets in San Diego County, California. The planned contract type is Firm?Fixed?Price (FFP) with defined performance outcomes and metrics. Place of Contract Performance: San Diego County, CA (SBIWTP and associated conveyance systems) Estimated Solicitation Release Date: On or about September 18, 2026 Response Time / Closing Date: Not less than 60 calendar days after issuance (final calendar to be specified in the RFP) Contract Type: Firm?Fixed?Price (FFP) Period of Performance: Base year plus four (4) one?year option periods Contact Point: Contracting Officer (CO), USIBWC Acquisition Division Philip Johnson at Philip.johnson@ibwc.gov 2. Description of Requirement (FAR 5.207(c)) USIBWC seeks a qualified O&M contractor to operate, maintain, and manage SBIWTP and its conveyance infrastructure (e.g., canyon collectors, pump stations, junction boxes, and South Bay Land/Ocean Outfall interfaces). Services include day?to?day plant operations; maintenance, servicing, repair and replacement; influent/effluent sampling and laboratory testing; system monitoring and data recording; quality control; reporting; asset and fleet management; grounds and housekeeping; chemical supply; and related services necessary for continuous, compliant operation. The O&M contractor will coordinate closely with the Governments Progressive Design?Build (PDB) team during ongoing rehabilitation and expansion activities. The Government remains legally responsible for permit compliance; the contractor supports compliance through operations, monitoring, and reporting aligned to performance metrics. 3. Source?Selection Approach USIBWC anticipates using a Highest Technically Rated with a Fair & Reasonable Price (HTR?FRP) method under FAR Part 15, consistent with USIBWCs RFO Class Deviation. Award is expected to be made to the highest technically rated responsible offeror whose price is determined fair and reasonable; no tradeoff analysis would be conducted. Final method will be confirmed in the RFP. 4. Important Notes This is a presolicitation notice only; it does not solicit proposals. All official instructions to offerors, proposal submission requirements, evaluation criteria, and terms/conditions will be in the RFP posted to SAM.gov. 5. Tentative Acquisition Milestones Presolicitation Notice: On or about September 18, 2026 RFP Issuance: Within 24 weeks after presolicitation (target) Proposal Due Date: Not less than 60 calendar days after RFP issuance
Notice and amendment history
- PresolicitationPosted Aug 26, 2026 · closes Sep 18, 2026
- Presolicitation · LatestPosted Aug 26, 2026 · closes Sep 18, 2026
Attachments
No attachments are currently listed.