Combined Synopsis/Solicitation
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
AGRICULTURE, DEPARTMENT OF · FOREST SERVICE · USDA FOREST SERVICE
Small Business Set Aside - TotalNAICS 238990PSC Z2PZAmended
Response deadlineSep 30, 2026
PostedAug 12, 2026
Solicitation1240BH26R0013
Notice ID42d2afa84427481497083f2202798590
Notice typeCombined Synopsis/Solicitation
Set-asideSmall Business Set Aside - Total
Place of performanceFifty Six, AR, 72533
AwardNot posted
Notice description
On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled C04m Attachment 11 Golder 1240BH26R0013. This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.
Notice and amendment history
- Combined Synopsis/Solicitation · LatestPosted Aug 12, 2026 · closes Sep 30, 2026
- Combined Synopsis/SolicitationPosted Aug 4, 2026 · closes Sep 30, 2026
Attachments
Select a filename to open the official SAM.gov notice and access the file.
- C04h Attachment 8 Estim Quant 1240BH26R0013.xlsx33 KB
- C05m Attachment 11 Golder 1240BH26R0013.pdf980 KB
- C04c Attachment 3 Drawings BSC 1240BH26R0013.pdf3982 KB
- C04g Attachment 7 Recommendations1240BH26R0013.pdf4020 KB
- C04k Attachment 11 General Decisio AR20260022 05182026.pdf1520 KB
- C04f Attachment 6 SOI 1240BH26R0013.xlsx13 KB
- C04b Attachment 2 Specs BSC LH 1240BH26R0013.pdf1214 KB
- C04a Attachment 1 SOW BSC 1240BH26R0013.docx73 KB
- C04j Attachment 10 RFI Form 1240BH26R0013.docx29 KB
- C04i Attachment 9 Site Visit 1240BH26R0013.docx125 KB
- C05 SF30 1240BH26R0013-0001.pdf84 KB
- C04 SF1442 1240BH26R0013.pdf321 KB
- C04e Attachment 5 Env Assessment 1240BH26R0013.pdf8033 KB
- C04d Attachment 4 Dwgs BSC Handrails 1240BH26R0013.pdf87944 KB