Response deadlineSep 30, 2026, 10:30 AM UTC
Deadline status27 days remaining
PostedAug 13, 2026
Record refreshedSep 2, 2026
Place of performanceBabb, MT, United States
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sourcesFor Federal Supply Schedules, Governmentwide acquisition contracts, multi-agency contracts or any other procurement instrument intended for use by multiple agencies, upon notification from the Contracting Officer, during the performance of the contract, the Contractor shall promptly make any necessary changes or modifications to remove any product or service produced or provided by a source that this clause prohibits. (h) General report. (1) If the Contractor identifies or is notified by any source, (including a subcontractor at any tier), that any product or service provided or used (or to be provided or used) during contract performance does not comply with any prohibition in this clause, then the Contractor shall report the following information, or as much information is known, in writing to the contracting office as identified in paragraph (h)(2) within 72 hours: (i) Contract number and order number, if applicable; (ii) The specific prohibition the product or service is not complying with; (iii) A description of the products or services that the Contractor identifies or has reason to suspect is prohibited (include brand; model number, such as the original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable); (iv) The entity that produced the product or service (include entity name, unique entity identifier, Contractor and Government Entity (CAGE) code, facilities responsible for design, fabrication, assembly, packaging, and test of the product, and whether the entity was the OEM or a distributor (provide manufacturer codes and distributor codes used for the product)); Sol.
Scope
Construction Services Statement of Work, V8.0 Piegan Parking Garage, Piegan LPOE, MT0551AE May 27, 2026 19 of 28 Back to Top submitting shop drawings to the COR/PM, the Contractor shall review the shop drawings for completeness and shall establish that the shop drawings meet the contract requirements.
Deliverables
The Project Schedule shall use the Critical Path Method (CPM) for the planning, scheduling and reporting of the work to be performed under the contract.
Evaluation
Evaluation of Offers – Lowest Price Technically Acceptable (1) The Government intends to award a contract resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value from the selection of the technically acceptable proposal with the lowest evaluated price.
Submission
Offerors shall acknowledge receipt of any amendment to this RFP by the date and time specified in the amendment(s). (c) Submission, modification, revision, and withdrawal of proposals.(1)(i) Proposals and modifications to proposals shall be— (A) Submitted using the method and the format specified in the RFP; (B) Addressed to the office specified in the RFP; and (C) Showing the time and date specified for receipt, the RFP number, and the name and address of the offeror. (ii) Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i)(B) and (C) of this provision. (2) The first page of the proposal must show— (i) The RFP number; (ii) The name, address, and telephone number of the offeror (and electronic address if available); (iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the RFP and agreement to furnish any or all items upon which prices are offered at the price set opposite each item; (iv) Names, titles, and telephone number (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP; and (v) Name, title, and signature of person authorized to sign the proposal.
Eligibility
Set-aside: Small Business Set Aside - Total
Place of performance
Babb, MT, USA
Key dates
Posted Aug 13, 2026; Responses due Sep 30, 2026, 10:30 AM UTC; Archive date Oct 15, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.