← Active opportunities
Combined Synopsis/Solicitation

On-site SCBA Annual Flow Testing

DEPT OF DEFENSE · DEPT OF THE NAVY · COMMANDING GENERAL

No Set aside usedNAICS 811310PSC J042Amended
Response deadlineSep 8, 2026
PostedAug 25, 2026
SolicitationM0068126Q0085
Notice ID5a7cb94f47c14893ad63421fb8d28c0c
Notice typeCombined Synopsis/Solicitation
Set-asideNo Set aside used
Place of performanceCA
AwardNot posted

Notice description

Requirement: Marine Corps Installations - West (MCIWEST) Fire & Emergency Services (F&ES) Departments require annual flow testing of department owned SCBA equipment for the various fire stations aboard Marine Corps Base (MCB) Camp Pendleton (CPEN), Marine Corps Air Station (MCAS) Miramar, Marine Corps Logistics Base (MCLB) Barstow, Marine Corps Air Ground Combat Center (MCAGCC) Twentynine (29) Palms and Marine Corps Mountain Warfare Training Center (MCMWTC) Bridgeport. These services are required for F&ES to be compliant with applicable National Fire Protection Association (NFPA), Occupational Safety and Health Administration (OSHA), and original equipment manufacturer (OEM) standards. Services are required on an annual schedule. Flow testing services shall be performed on-site. ?? IMPORTANT NOTICE TO PROSPECTIVE QUOTERS – PLEASE READ CAREFULLY ?? To ensure your quote is determined technically compliant and eligible for evaluation and award, offerors must review the entire solicitation package and all attached documents prior to quote submission. Incomplete submissions or failure to adhere strictly to solicitation instructions may result in your quote being deemed non-responsive and excluded from further evaluation. Key Submission Reminders: Section L (Instructions to Quoters): Follow all format, volume, and submission guidelines precisely. Ensure all requested pricing formats, representations, certifications, and technical narratives are provided. Section M (Evaluation Factors for Award): Review how quotes will be evaluated. Address every evaluation factor and sub-factor thoroughly with direct supporting documentation. Mandatory Attachments: Review, complete, sign, and return the Technical Acceptability Checklist with your quote. Quotes submitted without all required documentation or failing to meet the minimum stated requirements will not be considered.

Notice and amendment history

Attachments

Select a filename to open the official SAM.gov notice and access the file.