Solicitation
Bravo Dive Boat 65DS1101
DEPT OF DEFENSE · DEPT OF THE NAVY · PUGET SOUND NAVAL SHIPYARD IMF
Small Business Set Aside - TotalNAICS 336611PSC J019Amended
Response deadlineDec 16, 2026
PostedDec 15, 2025
SolicitationN4523A26Q1110
Notice ID5e019b090a3647d8856e0e845dbc5f32
Notice typeSolicitation
Set-asideSmall Business Set Aside - Total
Place of performanceBremerton, WA
AwardNot posted
Notice description
AMENDMENT 0005 POSTED 12/5. RFC #16 Response available in Attachments. AMENDMENT 0004 POSTED 12/3. AMENDMENT 0003 POSTED 11/26. AMENDMENT 0002 POSTED 11/21. AMENDMENT 0001 POSTED 11/19. The Regional Maintenance Center at Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF) intends to award a stand-alone Firm-Fixed-Price contract to accomplish the maintenance, repair, and preservation in support of one (1) 65 FT BRAVO DIVE BOAT 65DS1101. Work will be accomplished at the Contractor's facility. Geographical Area of consideration: To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA. 65DS1101 Length: 69 FT 10 IN Width: 22 FT 0 IN Draft: 3 FT 6 IN Full Displacement: 55 L TONS Age: 13 YEARS Light Load: 8,000 lbs Hull Type: Aluminum Scope Overview: Coordinate with the Contracting Officer, via the Contracting Officers Representative (COR) to deliver the vessel to the Contractors facility from Puget Sound Naval Shipyard (PSNS) Bremerton, WA. Remove all fendering and sweep blast clean. Accomplish survey of hull to identify and repair corrosion, preserve the exterior above and below the waterline, including the crane. Apply nonskid to horizontal surfaces on the exterior and interior of the boat. Replace motor mounts. Remove, inspect and install shafting, rudders and propellers. HVAC repair. Maintain and repair watertight hatches and doors. Repair, modify and preserve push knee. Replace and modify corroded deck and bulkhead structure in the main cabin. Install remote fuel shut offs. Identify and repair corrosion beneath the transformers in the aft lazzarette, install a weather shield above the starboard transformer in the aft lazzarette. Replace hydraulic, and fuel hoses. Identify and repair corroded structure beneath the shower room drain. Remove windows, repair window heaters, and reinstall windows. Replace fire suppression system piping and recertify system. Repair damage to the port bow. Accomplish modification and repair of swim platform stairs. Restore preservation system on the console in the pilot house. Replace existing generators with supplied Kohler generators, Modify, repair and install fendering system. Modify and repair the monkey heater system. Remove, inspect, preserve and install rudders. Replace thru hull valves and flexible hoses. Replace false bulkheads in the shower room and head. Open, clean and inspect all tanks. Perform sea trials after completion of repairs and full cure time of preservation. Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the COR. The Period of Performance is expected to be 25 March 2026 to 29 May 2026. This is a 100% Small Business set-aside under the North American Industry Classification System (NAICS) 336611, size standard 1,300 employees. All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts. Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov. NOTE 1: Please pay particular attention to the inclusion of DFARS 252.232-7998 Obligations in Advance of Fiscal Year 2026 Funding (DEVIATION 2026-O0001). NOTE 2: Please review Request for Quote instructions regarding contract financing.
Notice and amendment history
- Solicitation · LatestPosted Dec 15, 2025 · closes Dec 16, 2026
- SolicitationPosted Dec 5, 2025 · closes Dec 16, 2026
- SolicitationPosted Dec 4, 2025 · closes Dec 9, 2026
- SolicitationPosted Dec 3, 2025 · closes Dec 9, 2026
- SolicitationPosted Nov 26, 2025 · closes Dec 9, 2026
- SolicitationPosted Nov 26, 2025 · closes Dec 4, 2026
- SolicitationPosted Nov 21, 2025 · closes Dec 4, 2026
- SolicitationPosted Nov 19, 2025 · closes Dec 4, 2026
- SolicitationPosted Nov 5, 2025 · closes Dec 4, 2026
Attachments
Select a filename to open the official SAM.gov notice and access the file.
- C9 N4523A26Q1110 65DS1101 RFC 17 Response.pdfFile size unavailable
- C9 N4523A26Q1110 65DS1101 RFC 16 Response.pdfFile size unavailable
- C8 N4523A26Q1110 65SD1101 Attachment-9 Growth Management Program Tracking Log.xlsxFile size unavailable
- C9 N4523A26Q1110 65DS1101 Attachment-2 Price Worksheet - Amendment 0001.xlsxFile size unavailable
- C9 N4523A26Q1110 65DS1101 RFC 13-14 Responses.pdfFile size unavailable
- C9 N4523A26Q1110 65DS1101 Amendment 0004.pdfFile size unavailable
- C8 N4523A26Q1110 65DS1101 Attachment-3 RFC Form.pdfFile size unavailable
- C9 N4523A26Q1110 65DS1101 RFC 1-8 Responses.pdfFile size unavailable
- C9 N4523A26Q1110 65DS1101 RFC 15 Response.pdfFile size unavailable
- C8 N4523A26Q1110 65DS1101 Attachment-5 Corporate Experience Data Sheet.pdfFile size unavailable
- C9 N4523A26Q1110 65DS1101 RFC 9-12 Responses.pdfFile size unavailable
- C8 N4523A26Q1110 65DS1101 Exhibit B GFP Attachment.pdfFile size unavailable
- C8 N4523A26Q1110 65DS1101 Attachment-6 Drawings_References Request.pdfFile size unavailable
- C8 N4523A26Q1110 65SD1101 Attachment-8 Growth Management Request Form.docxFile size unavailable
- C8 N4523A26Q1110 65DS1101 Attachment-7 BAVR Instructions.pdfFile size unavailable
- C9 N4523A26Q1110 65DS1101 Amendment 0005.pdfFile size unavailable
- C8 N4523A26Q1110 65DS1101 Attachment-4 Contract Performance Data Sheet.pdfFile size unavailable
- C8 N4523A26Q1110 65DS1101 Solicitation.pdfFile size unavailable
- C8 N4523A26Q1110 65DS1101 Exhibit A CDRLs_DIDs Request.pdfFile size unavailable
- C9 N4523A26Q1110 65DS1101 Attachment-1 Statement of Work - Errata 2.pdfFile size unavailable
- C9 N4523A26Q1110 65DS1101 RFC 17 Response.pdf167 KB
- C9 N4523A26Q1110 65DS1101 RFC 16 Response.pdf164 KB
- C9 N4523A26Q1110 65DS1101 Attachment-2 Price Worksheet - Amendment 0001.xlsx87 KB
- C8 N4523A26Q1110 65SD1101 Attachment-9 Growth Management Program Tracking Log.xlsx24 KB
- C9 N4523A26Q1110 65DS1101 Amendment 0003.pdf509 KB
- C9 N4523A26Q1110 65DS1101 Amendment 0002.pdf438 KB
- C9 N4523A26Q1110 65DS1101 RFC 13-14 Responses.pdf168 KB
- C9 N4523A26Q1110 65DS1101 Amendment 0004.pdf100 KB
- C8 N4523A26Q1110 65DS1101 Solicitation.pdf556 KB
- C8 N4523A26Q1110 65DS1101 Attachment-3 RFC Form.pdf268 KB
- C9 N4523A26Q1110 65DS1101 Amendment 0001.pdf438 KB
- C9 N4523A26Q1110 65DS1101 RFC 1-8 Responses.pdf170 KB
- C9 N4523A26Q1110 65DS1101 RFC 15 Response.pdf168 KB
- C8 N4523A26Q1110 65DS1101 Attachment-5 Corporate Experience Data Sheet.pdf288 KB
- C9 N4523A26Q1110 65DS1101 RFC 9-12 Responses.pdf257 KB
- C8 N4523A26Q1110 65DS1101 Exhibit B GFP Attachment.pdf3 KB
- C8 N4523A26Q1110 65DS1101 Attachment-6 Drawings_References Request.pdf364 KB
- C8 N4523A26Q1110 65SD1101 Attachment-8 Growth Management Request Form.docx28 KB
- C8 N4523A26Q1110 65DS1101 Attachment-7 BAVR Instructions.pdf183 KB
- C9 N4523A26Q1110 65DS1101 Amendment 0005.pdf570 KB
- C8 N4523A26Q1110 65DS1101 Attachment-4 Contract Performance Data Sheet.pdf233 KB
- C9 N4523A26Q1110 65DS1101 Attachment-1 Statement of Work - Errata 2.pdf1107 KB
- C8 N4523A26Q1110 65DS1101 Exhibit A CDRLs_DIDs Request.pdf168 KB