← Active opportunities
Solicitation

small-volume gas pycnometer

COMMERCE, DEPARTMENT OF · NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY · DEPT OF COMMERCE NIST

Small Business Set Aside - TotalNAICS 334516PSC 6640Amended
Response deadlineSep 3, 2026
PostedAug 21, 2026
Archive dateSep 18, 2026
Solicitation1333ND26QNB640546
Notice ID5ebcd7b382d64e06b7d3026a35871bbf
Notice typeSolicitation
Set-asideSmall Business Set Aside - Total
Place of performance
Public-source intelligence

Source-backed opportunity brief

6 citations · 2 sources

NO Are there specified connection or pressure requirements for the two-stage gas regulator?

Scope

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 small-volume gas pycnometer with vacuum sample preparation capability in accordance with the attached requirement document.

Deliverables

BUSINESS ELIGIBLE UNDER THE WOMEN-OWNED BUSINESS PROGRAM 1333ND26QNB640546 Attachment Page PAGE 3 OF 26 1333ND26QNB640546 Attachment Page PAGE 4 OF 26 1333ND26QNB640546 SCHEDULE Continued ITEM NO.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Official notice text

This soliciation is being amended to answer questions. Does the SBA nonmanufacturer rule apply, and has a class or individual waiver been issued for this acquisition? NO May a small-business reseller furnish an otherwise compliant product manufactured by a company exceeding the solicitation's 1,250-employee size standard? YES Does the 0.1 cm³ requirement refer to sample-cell capacity or minimum measurable sample volume? YES Would a system with temperature control beginning at 4°C be unacceptable where the requirement states at least 3°C-60°C? 4 WOULD BE ACCEPTABLE Must the three-year warranty be provided directly by the OEM, or may the prime provide equivalent warranty coverage? OEM Are installation, commissioning, calibration or user training required? NO Are there specified connection or pressure requirements for the two-stage gas regulator? NO Please confirm whether email is the required quotation-submission method. EMAIL No additonal changes have been made. Please review the attachment.

What changed

Aug 21, 2026 · 2 fields changed
DescriptionThis soliciation is being amended to answer questions. Does the SBA nonmanufacturer rule apply, and has a class or individual waiver been issued for this acquisition? NO May a small-business reseller furnish an otherwise compliant product manufactured by a company exceeding the solicitation's 1,250-employee size standard? YES Does the 0.1 cm³ requirement refer to sample-cell capacity or minimum measurable sample volume? YES Would a system with temperature control beginning at 4°C be unacceptable where the requirement states at least 3°C-60°C? 4 WOULD BE ACCEPTABLE Must the three-year warranty be provided directly by the OEM, or may the prime provide equivalent warranty coverage? OEM Are installation, commissioning, calibration or user training required? NO Are there specified connection or pressure requirements for the two-stage gas regulator? NO Please confirm whether email is the required quotation-submission method. EMAIL No additonal changes have been made. Please review the attachment.Please review the attachment.
Documents1Removed

Notice history

Attachments

Select a filename to open the source file. If a saved copy is not available yet, FedRoster will continue to the official notice.