Solicitation
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
DEPT OF DEFENSE · DEPT OF THE AIR FORCE · FA8137 AFSC PZIOC
SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)NAICS 236220PSC Z1AAAmended
Response deadlineSep 4, 2026
PostedAug 26, 2026
SolicitationFA813726R0026
Notice ID61022eb2e5ff4f49bba05aad110bbcda
Notice typeSolicitation
Set-asideSBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
Place of performanceTinker AFB, OK, 73145
AwardNot posted
Notice description
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 08 - 26 August 2026 1) 2nd round of Prebid RFI Responses have been posted to the attachments section and are labeled: "250063_Pre-Bid RFI_Responses Round 2 COR" 2) The proposal due date has been extend from August 31st 2026 @ 2:00 pm (1400) to September 4th 2026 @ 2:00 pm (1400) 3) The solicitation amendmnet has been posted to the attachments section and is labeled: "Solicitation Amendment FA813726R00260001 SF 30". THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 07 - 11 August 2026 1) Due to the revised Statement of Work, and Drawings, this solicitation will be opened up for a second round of RFI's 2) RFI's will be due 13 August 2026 @ 1400 (2:00 pm) 3) RFI's are to be sent to SSgt Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 06 - 5 August 2026 1) A revised Statmenet of Work labeled "250063_ATT01_SOW_Amend_01" has been posted to the attachments section of this solicitation. 2) Revised drawings labeled "250063_ATT02_Drawings_Amend_01" have been posted to the the attachments section of this solicitation. 3) Proposals are due 31 August 2026 @ 1400 (2:00 PM) CST 4) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 05 - 31 JULY 2026 1) Prebid RFI Responses have been posted to the attachments section and are labeled: "250063_Prebid RFI Responses" 2) Proposals are due 31 August 2026 @ 1400 (2:00 pm) CST. 3) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 04 - 23 JULY 2026 1) An updated Site Visit Sign in Sheet has been posted. 2) RFI's are due 24 July 2026 @ 1400 (2:00 pm) CST THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 03 - 20 JULY 2026 1) Due to several missed RSVP's an additional site visit will be held 21 July 2026 @ 1230 (12:30 PM) 2) If you attended the first site visit you are not required to attend the additional site visit 3) If you wish to attend the additional site visit please send an RSVP to SSgt Isaac Demmers at isaac.demmers@us.af.mil by 1800 (6:00 pm) on 20 July 2026 THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 02 - 20 JULY 2026 1) The site visit for this requirement was conducted on 20 July 2026 2) RFI's are due 24 July 2026 @ 1400 (2:00 pm) CST 3) The site visit sign in sheet has been posted in the attachments THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 01 - 13 JULY 2026 1) The official solicitation document for this requirement labeled (Solicitation - FA813726R0026) has been replaced to refelct an issue date of: 13 Jul 2026 2) All other terms and conditions remain the same THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY After review of the project specific documents, if you are a SBA Certified WOSB, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Monday, 20 July, 2026 at 0900 (9:00 am) CST. The meet up location for the site visit will be at the North West Parking lot of Building 9001. Approximate coordinates are: 35°23'43.9"N 97°23'56.8"W -- An attachment titled "Site Visit Meet Up Location" can be found in the attachments and gives the specific details and visual for the meet up point. You must attend the initial Site Vist for the project, to be considered eligible to propose. Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil". THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
Notice and amendment history
- Solicitation · LatestPosted Aug 26, 2026 · closes Sep 4, 2026
- SolicitationPosted Aug 11, 2026 · closes Aug 31, 2026
- SolicitationPosted Aug 5, 2026 · closes Aug 31, 2026
- SolicitationPosted Jul 31, 2026 · closes Aug 31, 2026
- SolicitationPosted Jul 23, 2026 · closes Aug 31, 2026
- SolicitationPosted Jul 20, 2026 · closes Aug 31, 2026
- SolicitationPosted Jul 20, 2026 · closes Aug 31, 2026
- SolicitationPosted Jul 13, 2026 · closes Aug 31, 2026
- SolicitationPosted Jul 13, 2026 · closes Aug 31, 2026
- SolicitationPosted Jul 9, 2026 · closes Aug 31, 2026
Attachments
Select a filename to open the official SAM.gov notice and access the file.
- esvEH_singledual_2023_V2.pdf267 KB
- 01 32 16.00 20.pdf28 KB
- 03 01 00.pdf148 KB
- 10 44 16.pdf14 KB
- TAFB B9001 VAV Schedule.pdf6 KB
- 23 00 00.pdf245 KB
- 23 05 48.00 40.pdf49 KB
- SOW Att 02c_Controlled Area Training - Certificate.pdf467 KB
- 00 71 00.pdf1569 KB
- 08 51 23.pdf38 KB
- 23 09 23.02.pdf168 KB
- 00 80 00.pdf8 KB
- 00 70 00.pdf897 KB
- 2026 TAFB Mechanical Standard_signed.pdf1242 KB
- Mechanical Schedules.xls1376 KB
- SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx16 KB
- 08 81 00.pdf57 KB
- 10 22 13.pdf22 KB
- 08 71 00.pdf59 KB
- 250063 React VII_Hardware schedule 25MAR26 JL.xlsx17 KB
- 2_-_HE05-JINV-S11EE---GNT---L_001.pdf55 KB
- 250063_ATT02_Drawings_Amend_01.pdf14143 KB
- 2026 TAFB FIRE PROTECTION STANDARD.pdf341 KB
- 23 05 15.pdf151 KB
- 26 51 00 INTERIOR LIGHTING.pdf101 KB
- 00 80 05.pdf10 KB
- 250063_Pre-Bid RFI_Responses Round 2 COR.pdf290 KB
- overall plan 04.15.2021.pdf184 KB
- 01 33 00.pdf856 KB
- 01 78 23.pdf34 KB
- Solicitation Amendment FA813726R00260001 SF 30.pdf219 KB
- 01 78 00.pdf1387 KB
- 05 40 00.pdf42 KB
- ELECTRICAL PANEL SCHEDULE U18L.xlsx23 KB
- 07 21 16.pdf26 KB
- lrad331965pd_spec.pdf384 KB
- 07 14 00.pdf40 KB
- 28 31 76.pdf200 KB
- 2020 TAFB Facility Standard.pdf5974 KB
- 250063_ATT 9_SOW.pdf373 KB
- REACT VII SA-01.pdf340 KB
- 2026 TAFB Electrical Standard - Signed.pdf523 KB
- Door_Window_Schedule.xlsx18 KB
- 09 67 23.15.pdf90 KB
- 23 05 93.pdf57 KB
- HE05IN_Dimension_Drawing.pdf194 KB
- 21 13 13.pdf103 KB
- DESV_Submittal.pdf457 KB
- 250063_Prebid RFI Responses.pdf224 KB
- afi48-104.pdf317 KB
- 10 14 00.10.pdf42 KB
- SOW Att 01_Appointment of Security Representative Template 496.docx101 KB
- Room finish schedule.xlsx10 KB
- 01 45 00.00 10.pdf36 KB
- 00 72 00.pdf5452 KB
- SOW Att 02a_Controlled Area Training.pptx651 KB
- 26 20 00.pdf187 KB
- JOIST SPECIAL INSPECTIONS.xlsx10 KB
- 07 92 00.pdf43 KB
- 01 33 16.00 10.pdf86 KB
- 08 11 13.pdf39 KB
- 23 36 00.00 40.pdf90 KB
- 250063_ATT 10_Submittal Register.xlsx70 KB
- ERV Schedule_TAFB B9001_O-212477.xlsx8 KB
- WWYK250063-04March2026.pdf76 KB
- 22 00 00.pdf359 KB
- 250063_ATT 11_Drawings.pdf14210 KB
- lk406gn05t4_spec.pdf220 KB
- 08 33 23.pdf47 KB
- 06 41 16.00 10.pdf57 KB
- 05 05 23.16.pdf34 KB
- esvperf_singledual_2023_V2.pdf670 KB
- 09 90 00.pdf139 KB
- 23 09 13.pdf171 KB
- z415-bz1.pdf286 KB
- 250063_ATT 10_Submittal Register.pdf360 KB
- 000_TABLE OF CONTENTS.pdf70 KB
- 250063_ATT01_SOW_Amend_01.pdf374 KB
- 23 64 26.pdf165 KB
- 23 07 00.pdf233 KB
- HELICAL PILES NOTES.docx15 KB
- 250063_ATT 4_ODS.pdf157 KB
- PILE SCHEDULE.xlsx11 KB
- UMRL.pdf686 KB
- WWYK250063-04March2026 1.docx425 KB
- 23 03 00.pdf25 KB
- z400i.pdf_safe.pdf121 KB
- 220042 As Built Drawings.pdf12150 KB
- 10 14 00.20.pdf30 KB
- 23 31 13.00 40.pdf182 KB
- 01 42 00.pdf10 KB
- 01 50 00.pdf300 KB
- Solicitation - FA813726R0026.pdf703 KB
- 23 08 00.pdf163 KB
- 07 84 00.pdf32 KB
- 250063_ATT 3_RMDF.pdf265 KB