Combined Synopsis/Solicitation
Generator Preventative Maintenance Services
DEPT OF DEFENSE · DEPT OF THE ARMY · W7NU USPFO ACTIVITY OHANG 179
Small Business Set Aside - TotalNAICS 811310PSC J061Amended
Response deadlineSep 8, 2026
PostedAug 26, 2026
SolicitationW50S8R26Q0025
Notice ID63ba90b43a864178a08a9b9b7f1d66f6
Notice typeCombined Synopsis/Solicitation
Set-asideSmall Business Set Aside - Total
Place of performanceMansfield, OH, 44903
AwardNot posted
Notice description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; Offers are being requested and a written solicitation will not be issued. Solicitation number W50S8R26Q0025 is issued as a Request for Quotation (RFQ). This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. This solicitation is 100% small business set aside. The NAICS code that applies is 811310 and the size standard is $12.5M. This action will result in a firm-fixed price (FFP) purchase order utilizing simplified acquisition procedures. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement: Contract Line Items (CLINS): CLIN 0001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance PoP: 15 September 2026 14 September 2027 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: CLIN 0002 The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform B409 generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement Paragraph 5.2. B409 Generator Diagnostic Inspection PoP: 15 September 2026 14 September 2027 Qty: 1 Unit of Measure: JOB Unit Cost: Total Cost: CLIN 0003 The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform B409 generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement Paragraph 5.2. B409 Generator Repair/Overhaul PoP: 15 September 2026 14 September 2027 Qty: 1 Unit of Measure: JOB Unit Cost: Total Cost: Sub- CLINS Price Included in CLIN 0003 CLIN 0003AA Engine Gasket and Seal Replacement (PWS 5.2.2) Total Price: CLIN 0003AB Cooling System Refurbishment (PWS 5.2.2) Total Price: CLIN 0003AC Fuel System Refurbishment (PWS 5.2.2) Total Price: CLIN 0003AD Electrical and Starting System Replacement (PWS 5.2.2) Total Price: CLIN 1001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance Note: Maintenance for the B409 generator is a non-severable component of the overall FFP monthly rate for CLIN 1001 and shall be included in the total proposed cost. However, for Government informational and budgeting purposes, the offeror shall provide a separate, non-binding annual cost breakdown specifically for the B409 generator within their price proposal. PoP: 15 September 2027 14 September 2028 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: CLIN 2001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance Note: Maintenance for the B409 generator is a non-severable component of the overall FFP monthly rate for CLIN 1001 and shall be included in the total proposed cost. However, for Government informational and budgeting purposes, the offeror shall provide a separate, non-binding annual cost breakdown specifically for the B409 generator within their price proposal. PoP: 15 September 2028 14 September 2029 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: CLIN 3001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance Note: Maintenance for the B409 generator is a non-severable component of the overall FFP monthly rate for CLIN 1001 and shall be included in the total proposed cost. However, for Government informational and budgeting purposes, the offeror shall provide a separate, non-binding annual cost breakdown specifically for the B409 generator within their price proposal. PoP: 15 September 2029 14 September 2030 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: CLIN 4001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance Note: Maintenance for the B409 generator is a non-severable component of the overall FFP monthly rate for CLIN 1001 and shall be included in the total proposed cost. However, for Government informational and budgeting purposes, the offeror shall provide a separate, non-binding annual cost breakdown specifically for the B409 generator within their price proposal. PoP: 15 September 2030 14 September 2031 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: Delivery location/Place of Performance 1947 Harrington Memorial Road, Mansfield, OH, 44903 Site Visit: A site visit has been scheduled for 24 August 2026 at 10:00 AM EST. Due to security conditions, all offerors SHALL register to attend this conference and site visit. Email the following information for all attendees to James Kliewer at james.kliewer.2@us.af.mil Upon request, a base access form will be provided for interested site visit attendees to fill out and sign. The base access form shall be completed and provided by 20 August 2026 at 1:00 PM EST in order to ensure access to the installation. Visitors shall arrive no sooner than 30 minutes/no later than 15 minutes prior to start of site visit. Note that failure to arrive at front gate prior to 9:45 A.M. may be grounds for exclusion from site visit, as there will be a one-time escort for all attendees (i.e. escort will not return to front gate for those who arrive late). Addendum 52.212-1 Instructions to Offerors-Commercial Items. 1.GENERAL INSTRUCTIONS TO OFFERORS: This Request for Quotation (RFQ) is being issued in accordance with the procedures at RFO FAR 12. The contracting officer is vested by authority above with additional procedural discretion and flexibility, for this acquisition which may allow to solicit, offer, evaluate, and award in a simplified manner that maximizes efficient economy, minimizes burden and administrative costs for both the Government and industry through procedures awarding this Contract. The Offerors quote shall be submitted electronically as outlined below. The government contemplates awarding a single FFP contract based on a competition between small businesses where the Offerors quote is most advantageous to the Government, price and other factors considered. 1.1. Questions regarding this RFQ shall be in writing and directed via e-mail to james.kliewer.2@us.af.mil. All correspondence shall reference W50S8R26Q0025. The cut-off for questions is no later than 26 August 2026 at 1:00 P.M. ET. All questions will be answered electronically so that all respondents will be provided with equal access to all questions and answers. 1.2. The Offeror is notified that the Government will not reimburse costs incurred for quote preparation. The proposal evaluation and discussion procedures. FAR 15.203 do not apply to this acquisition. The Government will conduct evaluations using an approach that is most advantageous to the government, price and other factors considered, using RFO FAR 12.203, considering solely the offerors response to this RFQ. 1.3. The government does not intend to hold any exchanges after receipt of quotes and respondents are advised to submit their best offer at the time quotes are due. In the event that exchanges with respondents after the receipt of quotes are deemed necessary, the contracting officer may hold such exchanges with any or all quoters, at any time, in any manner, without complying with the rules in 15.204, which are not applicable to this acquisition. A competitive range may, or may not, be established at the sole discretion of the contracting officer. All respondents will be treated fairly and impartially, in accordance with RFO FAR 1.102. 1.4. The offeror shall submit an unclassified quote which demonstrates its ability to perform and meet the requirements in Attachment 1 Performance Work Statement (PWS). 1.5. Quote shall conform to all the requirements of this RFQ. Failure to conform may result in your quote being rejected and no longer considered for award. 1.6. By responding to this RFQ, the offeror agrees to meet all the requirements incorporated herein, including those listed in the PWS, and agrees to all the terms, conditions, and provisions. 1.6.1. The Offerors quote shall be submitted electronically to the addresses listed under Quote Submission Instructions. The closing date and time for submittal of quote is 8 September 2026, 1:00 P.M. EST. 1.7 Quote Organization 1.7.1. The Offerors quote shall consist of three volumes. The offeror shall submit an unclassified quote which demonstrates its ability to perform and meet the requirements in Attachment 1 Performance Work Statement, enclosed with this solicitation. Volume 1 Factor 1. Technician Qualifications Factor 2. Technical Approach for Generator Overhaul Factor 3. Service Response Plan b. Volume 2 Past Performance c. Volume 3 - Price Required Content 1.8 Volume 1 Technical shall be organized in sections as it addresses the corresponding sections. The offeror shall provide a realistic and descriptive solution for tasks and evidence that the offeror has current capability and resources to meet the requirements defined in Attachment 1 Performance Work Statement. To facilitate the evaluation of Technical Capability, the Offerors Technical Proposal must specifically address the following sub-factors: Factor 1: Technician Qualifications Requirement: Offerors shall provide verifiable documentation (e.g., copies of current certificates, official training records) demonstrating that proposed personnel meet or exceed the minimum certification requirements identified in the PWS. Standard for "Acceptable" Rating: The proposal must include valid, current documentation demonstrating that the proposed workforce includes technicians who possess: A current EGSA Journeyman or Master Technician certification. OEM factory training or certification for both Cummins and Kohler generator systems as listed in Technical Exhibit 3. NFPA 70E (Standard for Electrical Safety in the Workplace) training completed within the last three (3) years. Standard for "Unacceptable" Rating: The proposal fails to provide documentation for any of the required certifications, or any provided certification is expired, invalid, or does not meet the requirements as stated. Factor 2: Technical Approach for Generator Overhaul Requirement: Offerors shall submit a technical approach narrative (not to exceed 3 pages) that describes their plan for executing the comprehensive overhaul of the Cummins 900
Notice and amendment history
- Combined Synopsis/Solicitation · LatestPosted Aug 26, 2026 · closes Sep 8, 2026
- Combined Synopsis/SolicitationPosted Aug 26, 2026 · closes Sep 8, 2026
- Combined Synopsis/SolicitationPosted Aug 17, 2026 · closes Sep 3, 2026
- Sources SoughtPosted Jul 29, 2026 · closes Aug 3, 2026
Attachments
Select a filename to open the official SAM.gov notice and access the file.
- Attachment 3 Wage Determination.pdf347 KB
- Attachment 1- Performance Work Statement Generator Maintenance - 27 JUL 26.pdf1396 KB
- Attachment 2 Provisions and Clauses.pdf34 KB
- Attachment 1- Performance Work Statement Generator Maintenance - 25 August 2026.pdf1447 KB
- Questions and Answers Round 1.pdf41 KB
- Questions and Answers Round 2.pdf45 KB