Scope
SCOPE To fulfill the objective of this contract, the Contractor shall provide support to ensure compliance with the CGP requirements for the project per the applicable permit as well as the requirements in this SOW.
TRANSPORTATION, DEPARTMENT OF · FEDERAL HIGHWAY ADMINISTRATION · 690567 WESTERN FEDERAL LANDS DIV
This RFQ seeks Post-Construction Environmental Compliance Monitoring Services for the MT FLAP BOR 2980(1) Sun River Bridge Replacement project in Augusta, MT. The award will be based on the lowest priced quote submitted by a small business. [3][2]
SCOPE To fulfill the objective of this contract, the Contractor shall provide support to ensure compliance with the CGP requirements for the project per the applicable permit as well as the requirements in this SOW.
Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. (End of provision) FAR 52.212-2 – Evaluation – Commercial Products and Commercial Services (DEVIATION Aug 2025) ADDENDUM BASIS FOR AWARD The lowest priced quote will be considered as the quote offering the lowest price on the Price Schedule (Section B) grand total for the base and all options, if any.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
For Federal Supply Schedules, Governmentwide acquisition contracts, multi-agency contracts or any other procurement instrument intended for use by multiple agencies, upon notification from the Contracting Officer, during the performance of the contract, the Contractor shall promptly make any necessary changes or modifications to remove any product or service produced or provided by a source that this clause prohibits. (h) General report. (1) If the Contractor identifies or is notified by any source, (including a subcontractor at any tier), that any product or service provided or used (or to be provided or used) during contract performance does not comply with any prohibition in this clause, then the Contractor shall report the following information, or as much information is known, in writing to the contracting office as identified in paragraph (h)(2) within 72 hours: (i) Contract number and order number, if applicable; (ii) The specific prohibition the product or service is not complying with; C-21 MT FLAP BOR 2980(1) Sun River Bridge Replacement (iii) A description of the products or services that the Contractor identifies or has reason to suspect is prohibited (include brand; model number, such as the original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable); (iv) The entity that produced the product or service (include entity name, unique entity identifier, Contractor and Government Entity (CAGE) code, facilities responsible for design, fabrication, assembly, packaging, and test of the product, and whether the entity was the OEM or a distributor (provide manufacturer codes and distributor codes used for the product)); (v) Description of the functionality of the product or service and how that functionality impacts the risk to the product or service; (vi) An explanation of any factors relevant to determining if the product or service should be permitted by an applicable exception, exemption, or waiver (if the contractor would like the Government to consider a waiver, and asks for such a waiver); (vii) Whether alternative products or services are available that would comply with the prohibition; (viii) If the product or service is related to item maintenance, include the following information on the item being maintained: (A) Brand; (B) Model number, OEM number, manufacturer part number, or wholesaler number; and (C) Item description, as applicable. (ix) Any readily available information about mitigation actions implemented or recommended. (2) If a report must be submitted to a contracting office, the Contractor shall submit the report as follows: (i) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil. (ii) For all other contracting offices, the Contractor shall report to the Contracting Officer. (iii) For indefinite delivery contracts, the Contractor shall report to both the contracting office for the indefinite delivery contract and the contracting office for any affected order. (3) If the report provided does not contain any of the information required by paragraph (h)(1) of this clause, and the contractor later discovers new information that is required by paragraph (h)(1) of this clause, then the contractor shall submit a subsequent report within 72 hours of discovering the new information. (4) The contractor shall also report the information in paragraph (h)(1) if the contractor wishes to ask for a waiver of the requirements of a new FASCSA order being applied through modification.
SCOPE To fulfill the objective of this contract, the Contractor shall provide support to ensure compliance with the CGP requirements for the project per the applicable permit as well as the requirements in this SOW.
DELIVERABLES SCHEDULE Task Deliverable Submittal Format Submittal Due Date Electronic Hard Copy 7.A.
Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. (End of provision) FAR 52.212-2 – Evaluation – Commercial Products and Commercial Services (DEVIATION Aug 2025) ADDENDUM BASIS FOR AWARD The lowest priced quote will be considered as the quote offering the lowest price on the Price Schedule (Section B) grand total for the base and all options, if any.
DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION WESTERN FEDERAL LANDS HIGHWAY DIVISION 610 EAST FIFTH STREET VANCOUVER, WA 98661-3801 Phone: (360) 619-7738 e-mail : WFL.Purchasing@dot.gov QUICK INDEX Page Item A-1 SF 1449, Solicitation, Offer and Award B-1 Continuation of SF 1449 C-1 Contract Clauses D-1 Performance Work Statement E-1 Solicitation Provisions and Instructions to Offerors Attachments 0001 Price Schedule 0002 Stormwater Pollution Prevention Plan (SWPPP) 0003 Offeror Work Experience 0004 Past Performance Questionnaire 0005 US Department of Labor SCA Wage Determination This solicitation is a Total Small Business Set-aside See FAR clause 52.219-6 Quote Response Due Date See Page A-1, Block 8 ii (This page intentionally left blank) iii Quotation Submittal Checklist Before submitting your offer, please review the following: Done?
Set-aside: Small Business Set Aside - Total
Augusta, MT, 59410, USA
Posted Aug 26, 2026; Responses due Sep 10, 2026, 9:00 PM UTC; Archive date Sep 25, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR 12.201-1, Simplified procedures. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number 69056726Q000038 is issued as a request for quotation (RFQ) for Post-Construction Environmental Compliance Monitoring Services in support of the MT FLAP BOR 2980(1) Sun River Bridge Replacement projects. This acquisition is a TOTAL SMALL BUSINESS SET-ASIDE and incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52. Additional information as required in RFO 12.202(b)(1) is provided in the RFQ document attached herein.
No field-level changes were detected between related notices.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.