Scope
SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck.
TRANSPORTATION, DEPARTMENT OF · FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
This presolicitation notice is for replacing a deficient culvert with a steel girder bridge in Rocky Mountain National Park. The project scope includes bridge construction, roadway surfacing, and stream diversion, with an estimated cost between $700,000 and $2,000,000. [1]
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE PROJECT NUMBER: CO NP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE PROJECT NUMBER: CO NP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No.
SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck.
PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10' wide x 48' long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68" dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement - September 2026 Award - December 2026 NTP - December 2026 Contract Completion - November 2027 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.
Grand Lake, CO, 80447, USA
Posted Aug 25, 2026; Responses due Sep 9, 2026, 8:00 PM UTC; Archive date Sep 30, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE PROJECT NUMBER: CO NP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities. SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. Access to the site is through a gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13' wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100' west of the bridge. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10' wide x 48' long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68" dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement - September 2026 Award - December 2026 NTP - December 2026 Contract Completion - November 2027 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.
No field-level changes were detected between related notices.
No attachments are currently listed.