← Active opportunities
OpenPresolicitation

OK FW TSM 10(1) NFH Entrance Road and Parking Improvements

Solicitation number6982AF27B000003

TRANSPORTATION, DEPARTMENT OF · FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI

View opportunity on SAM.gov ↗
Response deadlineSep 10, 2026, 8:00 PM UTC
Deadline status7 days remaining
PostedAug 24, 2026
Record refreshedAug 25, 2026
Place of performanceTishomingo, OK, 73460, United States

Opportunity summary

Source-cited

This is a Small Business Set-Aside project for NFH Entrance Road and Parking Improvements in Tishomingo, OK, involving road reclamation and new parking construction. The estimated cost range is between $700,000 and $2,000,000, but plans and specifications are not available. [1]

Key points

  • Project involves full depth reclamation and asphalt paving for roads. [1]
  • The project is a Small Business Set Aside. [1]

Watch items

  • Response deadline is September 10, 2026. [1]
  • Construction is anticipated from June 2027 to October 2027. [1]

Sources

  1. Official SAM.gov noticeTHIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

6 citations · 1 source

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S.

Scope

SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement.

Deliverables

PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD ANTICIPATED SCHEDULE: Advertisement - September 2026 Award - November 2026 Construction - June 2027 through October 2027 ESTIMATED COST RANGE: Between $700,000 and $2,000,000

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD ANTICIPATED SCHEDULE: Advertisement - September 2026 Award - November 2026 Construction - June 2027 through October 2027 ESTIMATED COST RANGE: Between $700,000 and $2,000,000

What changed

No field-level changes were detected between related notices.

Notice history

Attachments

No attachments are currently listed.

Back to top ↑