← Active opportunities
Combined Synopsis/Solicitation

F10295 Console Furniture

DEPT OF DEFENSE · DEPT OF THE AIR FORCE · FA8601 AFLCMC PZIO

No Set aside usedNAICS 337214PSC 7110
Response deadlineSep 10, 2026
PostedAug 24, 2026
Archive dateSep 25, 2026
SolicitationFA860126P0138
Notice ID6c973552c50444a08c63b540119b0c2c
Notice typeCombined Synopsis/Solicitation
Set-asideNo Set aside used
Place of performanceWright Patterson AFB, OH, 45433
Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

grounds to believe that the employee is habitually careless or unqualified. (7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract. (8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract. (9) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property. (i) Payments. (1) Work performed.

Scope

The Government will perform inspections and tests in a manner that will not unduly delay the work. (2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties. (3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier. (4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements.

Deliverables

Schedule Upon award, provide a schedule with exact dates for the following milestones: • Detailed requirements analysis • Final design submittal • Pre-production approval submittal • Fabrication period • Factory acceptance/packing & shipping • Delivery date • Installation QTY: 1 For Government Use Only Meets Does Not Meet Additional Comments: 2.0 Description of Work Once the contract has been awarded, it becomes the responsibility of the contractor to validate the actual site conditions as well as any specific programming needs of the customer.

Evaluation

Evaluation Factors for Award FAR Clauses Incorporated by Full Text 52.212-2 Evaluation-Commercial Products and Commercial Services. (Deviation 2026-O0038) (Feb 2026) Evaluation-Commercial Products and Commercial Services (Feb 2026) (Deviation 2026-O0038) (a) Evaluation factors.

Submission

After reviewing SAM information , the Offeror verifies by submission of this offer that the representations and certifications currently posted electronically at FAR 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services , have been entered or updated in the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard(s) applicable to the NAICS code(s) referenced for this solicitation), at the time this offer is submitted and are incorporated in this offer by reference (see FAR 4.1201), except for paragraphs ______________. [Offeror to identify the applicable paragraphs at (c) through (v) of this provision that the offeror has completed for the purposes of this solicitation only, if any.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Official notice text

NOTE: 05c- F10295 Console Furniture Plan DWG.dwg (SAM.gov does not accept this type of document)-Interested parties reach out to Brian Algeo (brian.algeo.1@us.af.mil) for a copy by email. Combined Synopsis/Solicitation Notice Type: Combined Synopsis/Solicitation (RFQ) Issuing Office: AFLCMC/PZIBA, Base Support Contracting, Wright-Patterson AFB, OH Posted Date: August 24, 2026 Response Date: September 10, 2026, 11:00 AM EST Set-Aside: Unrestricted (Full and Open Competition) Classification Code (PSC): 7110 - Office Furniture NAICS Code: 337214 - Office Furniture (except Wood) Manufacturing Small Business Size Standard: 1,100 employees Description This is a combined synopsis/solicitation for commercial products prepared in accordance with the Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses in effect through the RFO (effective April 17, 2026) and the Revolutionary Defense Federal Acquisition Regulation Supplement (RDFARS) as of the date of issuance. The Department of the Air Force intends to award a firm-fixed-price contract for F10295 Console Furniture, Project 2026SH080 in accordance with the attached Statement of Work (SOW), on a Lowest Price Technically Acceptable (LPTA) basis. The Schedule of Supplies, place of performance, delivery information, and the full list of applicable provisions and clauses are set forth in the attached solicitation documents. Award is subject to the availability of funds. Basis for Award Award will be made to the responsible offeror whose proposal: Conforms to this combined synopsis/solicitation; Receives an "Acceptable" rating on Technical Capability; and Contains the lowest Total Evaluated Price (TEP), determined to be fair, reasonable, and not unbalanced. Technical Capability. This is a single pass/fail factor. To be rated Acceptable, the proposal must demonstrate that the offered items meet or exceed every requirement of the SOW. Each proposal shall: Identify the proposed manufacturer(s), make(s), and model(s); Provide manufacturer technical data, datasheets, or specification sheets verifying compliance with each SOW characteristic; and Identify any deviations or exceptions to the SOW. A proposal will be rated Unacceptable if it fails to demonstrate compliance with any SOW requirement, takes a material exception, or lacks sufficient technical detail to permit evaluation. Restating a requirement without supporting data is insufficient. Past Performance and Responsibility. Prior to award, the Contracting Officer may perform a responsibility determination under RFO Part 9, including a review of the offeror's record in the Contractor Performance Assessment Reporting System (CPARS) and the Supplier Performance Risk System (SPRS). Adverse findings may render an offeror non-responsible. The Government reserves the right to award without discussion or to make no award. Key Information Requirement: F10295 Console Furniture, Project 2026SH080 per SOW dated August 18, 2026 Contract Type: Firm-Fixed Price Period of Performance: 120 Days after contract Award Delivery: FOB Destination Facility #10295, 2586 Newark Street, Wright-Patterson Air Force Base, OH 45433; inspection and acceptance at destination. Cybersecurity Maturity Model Certification (CMMC) Per RDFARS 252.204-7021, this acquisition requires CMMC Level 1 (for handling Federal Contract Information only). Offerors must have a current CMMC Level 1 (or higher) self-assessment recorded in the Supplier Performance Risk System (SPRS) at the time of award. Waivers, grace periods, and Plans of Action and Milestones (POA&Ms) are not permitted. Buy American Act and Trade Agreements This acquisition is subject to the Buy American Act and applicable trade agreements as implemented in the RFO and RDFARS. Offerors shall identify the country of origin for the offered end product(s) in their Representations and Certifications. Domestic or qualifying/designated-country end products are required unless an authorized exception applies. Submission Instructions Deadline: September 10, 2026, 11:00 AM EST Subject Line: Solicitation FA860126Q0138, F10295 Console Furniture, Project 2026SH080 Submit via email to: Contract Specialist: Brian Algeo - brian.algeo.1@us.af.mil Contracting Officer: Candice L. Snow - candice.snow@us.af.mil Format: Single email ? 10 MB; attachments must be in .pdf, .docx, or .xlsx format. Compressed files (e.g., .zip) are not permitted. Confirmation: A receipt confirmation will be sent within one business day; if not received, contact the point of contact above. Proposal Content Requirements Proposals shall consist of two parts - a Technical Proposal and a Price Proposal - and shall provide sufficient detail to demonstrate compliance with all SOW requirements. Do not merely restate the Government's requirements. Each proposal shall include: Company name, address, SAM Unique Entity ID (UEI), CAGE Code, and TIN Point of contact name, phone number, and email address Proposal number, date, and validity period (minimum 90 days) Technical description with manuals, datasheets, or literature evidencing compliance with each SOW requirement. Completed Offeror Representations and Certifications. Itemized firm-fixed pricing with extended totals for all items listed in the SOW; FOB Destination (all shipping and installation included); Net 30. Important Notices SAM Registration: Offerors must have and maintain an active registration in the System for Award Management (SAM) at https://www.sam.gov throughout the solicitation process and for the life of the contract. Invoicing: Invoices shall be submitted electronically through Procurement Integrated Enterprise Environment (PIEE), formerly Wide Area Workflow (WAWF), at https://piee.eb.mil/. Questions All questions shall be submitted via email to the Contract Specialist and Contracting Officer no later than September 2nd, 2026, 11:00 AM EST, with the solicitation number listed in the subject line. Questions received after this deadline may not be considered. Attachments Statement of Work (SOW) F10295 Console Furniture, Project 2026SH080 Solicitation FA860126Q0138-Draft Offeror Representations and Certifications 05a- F10295 Console Furniture Plan 05b-F10295 Console Drawings 05c- F10295 Console Furniture Plan DWG.dwg (SAM.gov does not accept this type of document)-Interested parties reach out to Brian Algeo (brian.algeo.1@us.af.mil) for a copy by email. 05d- Shield Embroidery JPEG

What changed

No field-level changes were detected between related notices.

Notice history

Attachments

Select a filename to open the source file. If a saved copy is not available yet, FedRoster will continue to the official notice.