Scope
4.0 Scope of Work 4.1 General Requirements • The Contractor shall perform a comprehensive inspection of all 13 gas boilers and calibrate the associated gas sensors. • The Contractor must troubleshoot any conditions found that affect the proper operation of the boilers. • Bidders are responsible for verifying all site conditions and quantities prior to bid submission.