Scope
SCOPE The Contractor shall furnish all labor, facilities, utilities, materials, and incidental services necessary to perform the requirements of this SOW.
ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · ADVANCED RSRCH PROJ AGENCY ARPA-E
This RFQ seeks quotes for host site operations and support services for ARPA-E's COOLERCHIPS Technology Program in the USA. The contractor must furnish all necessary labor, facilities, and support services for the technology showcase period. [4][1]
SCOPE The Contractor shall furnish all labor, facilities, utilities, materials, and incidental services necessary to perform the requirements of this SOW.
1. **DELIVERABLES** The Contractor shall provide the following deliverables: * Project Manager contact information. * Site Readiness Plan. * Utility Coordination Plan. * Safety Plan. * Installation Schedule. * Facility Restoration Confirmation.
1. **Evaluation of Proposals:** The Government will use tradeoff analysis when making the best value determination and award, based on the following three factors: Evaluation Factor 1 (Technical Capability), Evaluation Factor 2 (Past Performance), and Evaluation Factor 3 (Price).
You are invited to submit a quote in response to this RFQ.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
The Contractor failed to abate an alleged violation or enforce the requirements of a compliance plan, when directed by the Contracting Officer to do so. (g) Full cooperation. (1) The Contractor shall, at a minimum- (i) Disclose to the agency Inspector General information sufficient to identify the nature and extent of an offense and the individuals responsible for the conduct; (ii) Provide timely and complete responses to Government auditors' and investigators' requests for documents; (iii) Cooperate fully in providing reasonable access to its facilities and staff (both inside and outside the U.S.) to allow contracting agencies and other responsible Federal agencies to conduct audits, investigations, or other actions to ascertain compliance with the Trafficking Victims Protection Act of 2000 (22 U.S.C. chapter 78), E.O.
SCOPE The Contractor shall furnish all labor, facilities, utilities, materials, and incidental services necessary to perform the requirements of this SOW.
1. **DELIVERABLES** The Contractor shall provide the following deliverables: * Project Manager contact information. * Site Readiness Plan. * Utility Coordination Plan. * Safety Plan. * Installation Schedule. * Facility Restoration Confirmation.
1. **Evaluation of Proposals:** The Government will use tradeoff analysis when making the best value determination and award, based on the following three factors: Evaluation Factor 1 (Technical Capability), Evaluation Factor 2 (Past Performance), and Evaluation Factor 3 (Price).
You are invited to submit a quote in response to this RFQ.
Set-aside: No Set aside used
USA
Posted Sep 1, 2026; Responses due Sep 15, 2026, 6:00 PM UTC; Archive date Sep 30, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
You are invited to submit a quote in response to this RFQ. RFQ Objective: The Contractor will provide host site operations and support services necessary for ARPA-E to conduct the COOLERCHIPS Technology Program. The Contractor shall provide the facilities, utilities, infrastructure, engineering support, and logistical support necessary to support the technology showcase throughout the period of performance. See the following attachments for more details pertaining to this RFQ: 1. RFQ Details 2. Attachment 1 - SOW 3. Attachment 2 - Pricing Worksheet 4. Attachment 3 - Terms & Conditions
No field-level changes were detected between related notices.