Solicitation
13--RING,CLAMPING
DEPT OF DEFENSE · DEPT OF THE NAVY · NAVSUP WEAPON SYSTEMS SUPPORT MECH
NAICS 332993PSC 1350Amended
Response deadlineSep 18, 2026
PostedAug 20, 2026
SolicitationN0010425QNC18
Notice ID8d101d3cecbf499ba99ec59e87afc619
Notice typeSolicitation
Set-aside
Place of performance
AwardNot posted
Notice description
CONTACT INFORMATION|4|N744.11|CFD|NA|rachel.e.kern4.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specifications Section C and Section E. | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| PRODUCTION LOT TESTING|1|60 days| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|NA|TBD|N00104|TBD|TBD|See Schedule|TBD|NA|NA|TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery|One year from date of delivery||||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (DEV 2026-O0042)(FEB 2026)|7|ONE (1)|0001AA|TBD||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025) (DEVIATION 2025-O0003)|13|332993|1,500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION OF FIRST ARTICLE TESTING|3|X||| 1. Amendment 0004 hereby extends the quote due date from 15 SEP 2025 to 28 NOV 2025. 2. All other terms and conditions remain unchanged. \ 1. Amendment 0003 hereby updates the TDP and bidset of this requirement. 2. The quote due date is extended from 22 AUG 2025 to 15 SEP 2025. 3. All other terms and conditions remain unchanged. \ 1. Amendment 0002 hereby extends the quote due date from 30 MAY 2025 to 22 AUG 2025. 2. All other terms and conditions remain unchanged. \ This solicitation is for the PROCUREMENT of 3 each NSN: 1350 016711961. 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods suchas email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 5. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS).Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. 7. This solicitation requires First Article Testing (FAT). See FAR 52.290-4 First Article Approval - Government Testing for more details. 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the RING,CLAMPING . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=6558508 |53711| A|FN |D| | | | DRAWING DATA=6558511 |53711| A|FN |D| | | | DRAWING DATA=6558567 |53711| A|FN |D| | | | DRAWING DATA=6558568 |53711| A|FN |D| | | | DRAWING DATA=6964634 |53711| C|FN |D| | | | DRAWING DATA=6964634 |53711| C|PL |D| | | | DRAWING DATA=8475682 |53711| -|FN |D| | | | DRAWING DATA=8595200 |53711| -|DOC|A| | | | DRAWING DATA=8595224 |53711| -|FN |D| | | | DRAWING DATA=8635324 |53711| -|FN |D| | | | DRAWING DATA=8667125 |53711| A|FN |D| | | | DRAWING DATA=8667230 |53711| -|FN |D| | | | DOCUMENT REF DATA=MIL-STD-129 | | |R |190927|A| |02| DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the RING,CLAMPING furnished under this contract/purchase order shall meet the design, manufacture, and performance requirements specified on drawing ;6964634; cage ;53711; . 3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130. 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 3.5 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required. 3.6 Production Lot Approval (Government Testing) - Production Lot Test and approval is required. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Quality System Requirements - The supplier shall provide and maintain a quality system acceptable to the Government. The quality system requirements shall be in accordance with ISO 9001. 4.2.1 ;Suppliers currently using and maintaining Inspection System Requirements to MIL-I-45208 are granted permission to utilize MIL-I-45208 if desired.; 4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this con
Notice and amendment history
- SolicitationPosted Aug 20, 2026 · closes Sep 18, 2026
- Solicitation · LatestPosted Aug 20, 2026 · closes Sep 18, 2026
- PresolicitationPosted Aug 20, 2026 · closes Sep 18, 2026
- SolicitationPosted May 22, 2026 · closes Jun 22, 2026
- SolicitationPosted May 22, 2026 · closes Jun 22, 2026
- PresolicitationPosted May 22, 2026 · closes Jun 22, 2026
- SolicitationPosted May 4, 2026 · closes May 7, 2026
- PresolicitationPosted May 4, 2026 · closes May 7, 2026
- SolicitationPosted Apr 16, 2026 · closes May 7, 2026
- SolicitationPosted Apr 16, 2026 · closes May 7, 2026
- SolicitationPosted Jan 29, 2026 · closes Mar 6, 2026
- SolicitationPosted Jan 29, 2026 · closes Mar 6, 2026
- PresolicitationPosted Jan 29, 2026 · closes Mar 6, 2026
- SolicitationPosted Oct 6, 2025 · closes Nov 28, 2025
- SolicitationPosted Oct 6, 2025 · closes Nov 28, 2025
- SolicitationPosted Oct 6, 2025 · closes Nov 28, 2025
- PresolicitationPosted Oct 6, 2025 · closes Nov 28, 2025
- SolicitationPosted Aug 15, 2025 · closes Sep 15, 2025
- SolicitationPosted Jul 22, 2025 · closes Aug 22, 2025
- SolicitationPosted Jul 22, 2025 · closes Aug 22, 2025
Attachments
No attachments are currently listed.