Response deadlineSep 16, 2026, 4:00 PM UTC
Deadline status13 days remaining
PostedSep 1, 2026
Record refreshedSep 2, 2026
Place of performanceWashington, DC, 20515, United States
Opportunity summary
Source-citedThis solicitation is for Conservatory Doors Preventive Maintenance & Repair Services in Washington, DC, with a response deadline of September 16, 2026. A mandatory site visit is required, and the evaluation method is Lowest Priced Technically Acceptable. [3][2]
Key points
- Evaluation uses Lowest Priced Technically Acceptable method [2]
- Mandatory site visit is required for this opportunity [3]
Watch items
- Kick-Off Meeting due within 10 days after award [1]
- Door Inventory Diagram due within 30 days after award [1]
Sources
- J.1+SOW.docx
Unless otherwise noted, all days are calendar days. | **Deliverable/Description** | **Type** | **Delivery Method(s)** | **Delivery Date/Frequency** | | --- | --- | --- | --- | | Kick-Off Meeting (**6.1**) | Briefing | Virtual / PowerPoint | Within 10 days after award | | Project Management Plan (**6.3**) | Documents | Email / MS Word | **Draft** due with Proposal / **Final** w/in 30 days after award / **Update** at each Option Period | | Combined: Service Status (**6.4**) & Monthly Status Reports (**6.6**) | Documents | Email / MS Word | Within 7 days of visits / Monthly | | Door Inventory Diagram & Condition Assessment Report (**6.7 &** **Appendix B**) | Documents | Email / MS Word/Excel |
- J.2+Instructions+to+Quoters+and+Basis+for+Award+(L&M),+updated.docx
Within the best value continuum, the Government will use the **Lowest Priced Technically Acceptable** method in evaluating the proposals approved for evaluation.
- Official SAM.gov notice
Set-aside: No Set aside used
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sourcesThe Contractor failed to abate an alleged violation or enforce the requirements of a compliance plan, when directed by the Contracting Officer to do so. (g) Full cooperation. (1) The Contractor shall, at a minimum-- (i) Disclose to the agency Inspector General information sufficient to identify the nature and extent of an offense and the individuals responsible for the conduct; (ii) Provide timely and complete responses to Government auditors' and investigators' requests for documents;
Scope
It does not-- (i) Require the Contractor to waive its attorney-client privilege or the protections afforded by the attorney work product doctrine; (ii) Require any officer, director, owner, employee, or agent of the Contractor, including a sole proprietor, to waive his or her attorney client privilege or Fifth Amendment rights; or (iii) Restrict the Contractor from-- (A) Conducting an internal investigation; or Document Number: AOCSSB26R0062 Page 20 of 51 (B) Defending a proceeding or dispute arising under the contract or related to a potential or disclosed violation. (h) Compliance plan. (1) This paragraph (h) applies to any portion of the contract that-- (i) Is for supplies, other than commercially available off-the-shelf items, acquired outside the United States, or services to be performed outside the United States; and (ii) Has an estimated value that exceeds $550,000. (2) The Contractor shall maintain a compliance plan during the performance of the contract that is appropriate-- (i) To the size and complexity of the contract; and (ii) To the nature and scope of the activities to be performed for the Government, including the number of non-United States citizens expected to be employed and the risk that the contract or subcontract will involve services or supplies susceptible to trafficking in persons. (3) Minimum requirements.
Deliverables
Unless otherwise noted, all days are calendar days. | **Deliverable/Description** | **Type** | **Delivery Method(s)** | **Delivery Date/Frequency** | | --- | --- | --- | --- | | Kick-Off Meeting (**6.1**) | Briefing | Virtual / PowerPoint | Within 10 days after award | | Project Management Plan (**6.3**) | Documents | Email / MS Word | **Draft** due with Proposal / **Final** w/in 30 days after award / **Update** at each Option Period | | Combined: Service Status (**6.4**) & Monthly Status Reports (**6.6**) | Documents | Email / MS Word | Within 7 days of visits / Monthly | | Door Inventory Diagram & Condition Assessment Report (**6.7 &** **Appendix B**) | Documents | Email / MS Word/Excel | Within 30 days after award | | Quality Control Plan (QCP-**7.0**) | Documents | Email / MS Word | **Draft** due with Proposal / **Final** w/in 30 days after award / **Update** at each Option Period | | Safety Work Plan **(18.2)** | Documents | Email / MS Word | Within 15 days after award. | ## Kickoff Meeting The Contractor shall schedule, attend and facilitate a kick-off meeting within **ten (10) days** after the contract award.
Evaluation
Within the best value continuum, the Government will use the **Lowest Priced Technically Acceptable** method in evaluating the proposals approved for evaluation.
Submission
Price proposals shall be evaluated with respect to accuracy and completeness based on information submitted in the offeror’s written submission.
Eligibility
Set-aside: No Set aside used
Place of performance
Washington, DC, 20515, USA
Key dates
Posted Sep 1, 2026; Responses due Sep 16, 2026, 4:00 PM UTC; Archive date Oct 1, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.