Response deadlineSep 9, 2026, 1:00 PM UTC
Deadline status6 days remaining
PostedSep 2, 2026
Record refreshedSep 3, 2026
Place of performanceBiloxi, MS, 39534, United States
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sourcesthose for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items, if the subcontract or other contractual instrument will contain a requirement to process, store, or transmit FCI or CUI; and (2) Prior to awarding a subcontract or other contractual instrument, ensure that the subcontractor has a current CMMC certificate or current CMMC status at the CMMC level that is appropriate for the information that is being flowed down to the subcontractor based on the requirements at 32 CFR 170.23. (End of clause) 252.236-7001 Contract Drawings and Specifications. (Aug 2000) CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000) (a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer. (b) The Contractor shall- (1) Check all drawings furnished immediately upon receipt; (2) Compare all drawings and verify the figures before laying out the work; (3) Promptly notify the Contracting Officer of any discrepancies; (4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and (5) Reproduce and print contract drawings and specifications as needed. (c) In general-- (1) Large-scale drawings shall govern small-scale drawings; and (2) The Contractor shall follow figures marked on drawings in preference to scale measurements. (d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work.
Scope
The Contractor shall- Subcontracts (1) Insert the substance of this clause, including this paragraph (f) and excluding paragraph (e)(1), in subcontracts and other contractual instruments, including those for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items, if the subcontract or other contractual instrument will contain a requirement to process, store, or transmit FCI or CUI; and (2) Prior to awarding a subcontract or other contractual instrument, ensure that the subcontractor has a current CMMC certificate or current CMMC status at the
Deliverables
52 01 33 00 Please confirm review durations for initial submittals and resubmittals and whether review periods are included in the project schedule.
Evaluation
Contractor Selection Selection of a contractor will be based on competitive, lowest price technically acceptable acquisition procedures as prescribed in FAR Part 15, consistent with the evaluation factors described in Section M - Evaluation Factors for Award.
Submission
The CMMC UIDs are provided in SPRS after the Offeror enters the results of self-assessment(s) for each such information system. (End of provision) FA301026R00100002 Page 45 of 50 252.215-7012 Requirements for Submission of Proposals via Electronic Media. (Jan 2018) REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018) The Offeror shall submit the cost portion of the proposal via the following electronic media: PDF or Excel file (End of provision)
Eligibility
Set-aside: Small Business Set Aside - Total
Place of performance
Biloxi, MS, 39534, USA
Key dates
Posted Sep 2, 2026; Responses due Sep 9, 2026, 1:00 PM UTC; Archive date Sep 24, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.