← Active opportunities
OpenCombined Synopsis/Solicitation

2SLS DOC Lifting Equipment Proof Load-Trinity

Solicitation numberFA461026Q0051

DEPT OF DEFENSE · DEPT OF THE AIR FORCE · FA4610 30 CONS PK

View opportunity on SAM.gov ↗
Response deadlineSep 9, 2026, 7:00 PM UTC
Deadline status6 days remaining
PostedAug 27, 2026
Record refreshedAug 29, 2026
Place of performanceLompoc, CA, 93437, United States

Opportunity summary

Source-cited

The Department of Defense requires Annual Proof loads, NDI, and related services at Vandenberg Space Force Base, CA, with a response deadline of September 9, 2026. This is a Small Business Set Aside solicitation requesting quotes for commercial products and services. [4]

Key points

  • Services include Annual Proof loads and Non-Destructive Inspections [1]
  • Evaluation considers the lowest priced quote meeting SOW requirements [1]

Watch items

  • Submission requires a technical quote demonstrating capability [2]
  • Compliance with SAM RFO 52.204-7 is mandatory [3]

Sources

  1. Proof+Load+Trinity+Combo+Synop+20260824.pdf150 VANDENBERG SFB, CA 93437 27 August 2026 Factor 2 — Technical Capability The Government will evaluate the quote of the lowest priced quoter to determine whether the offered product(s) and services meet or exceed all requirements set forth in Attachment 1 – Statement of Work (SOW).
  2. Proof+Load+Trinity+Combo+Synop+20260824.pdfThe technical quote shall provide a proposed technical approach that demonstrates the offeror is capable of meeting the performance objectives, schedule, and deliverables in the attached Statement of Work (SOW). (End of Addendum)
  3. Attachment+2_RFQ+Pricing+Sheet+20260827.xlsxSelection of the Best Value offer will be made IAW the Evaluation Factors outlined in the RFQ. \n | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | SYSTEM FOR ACQUISITION MANAGEMENT (SAM):\nAll potential offerors are reminded that compliance with RFO 52.204-7, System for Award Management, is mandatory.
  4. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 5 sources

150 VANDENBERG SFB, CA 93437 27 August 2026 Factor 2 — Technical Capability The Government will evaluate the quote of the lowest priced quoter to determine whether the offered product(s) and services meet or exceed all requirements set forth in Attachment 1 – Statement of Work (SOW).

Scope

Electronic Data Interchange, or File Transfer Protocol. (f) The Contractor shall use the following information when WAWF payment instructions. submitting payment requests and receiving reports in WAWF for this contract or task or delivery order: (1) The Contractor shall submit payment requests using the following Document type. document type(s): (i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher. (ii) For fixed price line items- (A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. ____ (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.) (B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer. ____ (Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.) Page 5 of 7 (iii) For customary progress payments based on costs incurred, submit a progress payment request. (iv) For performance based payments, submit a performance based payment request. (v) For commercial financing, submit a commercial financing request. (2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract. [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.] (3) The Contractor shall use the information in the Routing Data Table Document routing. below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Deliverables

The technical quote shall provide a proposed technical approach that demonstrates the offeror is capable of meeting the performance objectives, schedule, and deliverables in the attached Statement of Work (SOW). (End of Addendum)

Evaluation

Selection of the Best Value offer will be made IAW the Evaluation Factors outlined in the RFQ. \n | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | SYSTEM FOR ACQUISITION MANAGEMENT (SAM):\nAll potential offerors are reminded that compliance with RFO 52.204-7, System for Award Management, is mandatory.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

This is a combined synopsis/solicitation for commercial products and services prepared in accordance with part 12 of the Revolutionary FAR Overhaul (RFO). This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The 30th Contracting Squadron at Vandenberg Space Force Base (SFB), CA has a requirement for the Annual Proof loads, Annual Non-Destructive Inspections (NDI), and other services, in accordance with (IAW) the attached Statement of Work (SOW). Submission Deadline: Responses to this solicitation must be submitted by 12:00 PM Pacific Time, Wednesday, 9 September 2026. The Government intends to award a Firm-Fixed-Price (FFP) purchase order to the responsible quoter whose quote, conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Please see Combo Synop attachment for more information.

What changed

No field-level changes were detected between related notices.

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑