← Active opportunities
OpenCombined Synopsis/SolicitationAmended

4 Fuel Tank Crates

Solicitation numberFA488726Q0052

DEPT OF DEFENSE · DEPT OF THE AIR FORCE · FA4887 56 CONS CC

View opportunity on SAM.gov ↗
Response deadlineSep 7, 2026, 1:00 PM UTC
Deadline status4 days remaining
PostedAug 27, 2026
Record refreshedSep 2, 2026
Place of performanceLuke Air Force Base, AZ, 85309, United States

Opportunity summary

Source-cited

This solicitation is for the build and delivery of shipping crates for four fuel tanks at Luke Air Force Base, AZ. Funds are not currently available, and the Government reserves the right to cancel the solicitation. [1][3]

Key points

  • Scope includes building and delivering 4 shipping crates for equipment. [1]
  • Evaluation considers past performance and price after technical acceptability. [2]

Watch items

  • Funds are not presently available for this effort. [3]
  • Quotes must remain firm through September 30, 2026. [3]

Sources

  1. STATEMENT+OF+WORK-+Crates.pdfSCOPE OF WORK: The scope of work includes the build and delivery of shipping crates for the following equipment: - 4 ea.
  2. Solicitation+-+FA488726Q0052.pdfTechnical rating will not be anevaluation factor butrather itwill first bedeterminedwhether or notthe contractor meets technical acceptability and then the proposal will beevaluated based on the evaluation factors; past performance and price.
  3. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 5 sources

The contractor shall use an automatic identification technology device for this verification that has been programmed to the requirements of Appendix A, MIL-STD-130, latest version. (ii) The issuing agency code- (A) Shall not be placed on the item; and (B) Shall be derived from the data qualifier for the enterprise identifier. (d) For each item that requires item unique identification under paragraph (c)(1)(i), (ii), or (iv) of this clause or when item unique identification is provided under paragraph (c)(1)(v), in addition to the information provided as part of the Material Inspection and Receiving Report specified elsewhere in this contract, the Contractor shall report at the time of delivery, as part of the Material Inspection and Receiving Report, the following information: (1) Unique item identifier. (2) Unique item identifier type. (3) Issuing agency code (if concatenated unique item identifier is used). (4) Enterprise identifier (if concatenated unique item identifier is used). (5) Original part number (if there is serialization within the original part number). (6) Lot or batch number (if there is serialization within the lot or batch number). (7) Current part number (optional and only if not the same as the original part number). (8) Current part number effective date (optional and only if current part number is used). (9) Serial number (if concatenated unique item identifier is used). (10) Government's unit acquisition cost.

Deliverables

WAWF methods of document submission. (f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract WAWF payment instructions. or task or delivery order: (1) The Contractor shall submit payment requests using the following document type(s): Document type. (i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher. (ii) For fixed price line items- (A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Evaluation

Technical rating will not be anevaluation factor butrather itwill first bedeterminedwhether or notthe contractor meets technical acceptability and then the proposal will beevaluated based on the evaluation factors; past performance and price.

Submission

The following factors shall be used to evaluate offers: 1)Technical Acceptability 2)Past Performance 3)Price Technical Acceptability- Factor 1: Technical Capability To be determined technically acceptable, the Offeror must submit a quote that clearly demonstrates the ability to meet the Government's requirements across the following sub-factors: Sub-factor 1: Delivery Schedule.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

4 Fuel Tanks per the attached salient characteristics, SOW and special packaging instructions. Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. The Government requests quotes remain firm through September 30, 2026. If market volatility prevents this, clearly state the maximum length of time quote pricing can be held.

What changed

Aug 27, 2026 · 1 field changed
Documents67

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑