Response deadlineSep 22, 2026, 2:00 PM UTC
Deadline status19 days remaining
PostedSep 1, 2026
Record refreshedSep 2, 2026
Place of performanceLuke Air Force Base, AZ, 85309, United States
Opportunity summary
Source-citedThis RFQ seeks a commercial service to conduct a Gas Leakage Detection Survey on approximately 244,770 LF at Luke AFB, AZ, in compliance with specific regulations. Funds are not presently available, and the Government reserves the right to cancel the solicitation. [3]
Key points
- Survey must be completed annually between November and January. [2]
- Evaluation considers Technical Acceptability, Past Performance, and Price. [1]
Watch items
- Verify deadlines, amendments, and submission instructions in the cited source before responding. [1]
Sources
- Solicitation+-+FA488726Q0059.pdf
The Government will evaluate the materials proposed by the contractor to ensure they strictly meet or exceed all end-user standards and technical specifications identified in the requirement.
- Statement+of+Work+(SOW)+-+Gas+Leak+Survey.pdf
The survey shall be completed annually, between the months of November - January, and the Contractor shall provide the Government 30 days advanced notice with a proposed schedule of inspection/survey dates prior to start of the leak detection survey.
- Official SAM.gov notice
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 4 sourcesThe Government will evaluate the materials proposed by the contractor to ensure they strictly meet or exceed all end-user standards and technical specifications identified in the requirement.
Scope
The Contractor shall- Subcontracts FA488726Q0059 Page 14 of 22 (1) Insert the substance of this clause, including this paragraph (f) and excluding paragraph (e)(1), in subcontracts and other contractual instruments, including those for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items, if the subcontract or other contractual instrument will contain a requirement to process, store, or transmit FCI or CUI; and (2) Prior to awarding a subcontract or other contractual instrument, ensure that the subcontractor has a current CMMC certificate or current CMMC status at the CMMC level that is appropriate for the information that is being flowed down to the subcontractor based on the requirements at 32 CFR 170.23. (End of clause) FA488726Q0059 Page 15 of 22
Deliverables
The survey shall be completed annually, between the months of November - January, and the Contractor shall provide the Government 30 days advanced notice with a proposed schedule of inspection/survey dates prior to start of the leak detection survey.
Evaluation
Evaluation Factors for Award FAR Clauses Incorporated by Reference Number Title Effective Date Alternate/ Deviation Variation Effective Date 52.217-3 Evaluation Exclusive of Options.
Submission
The following factors shall be used to evaluate offers: 1)Technical Acceptability 2) Past Performance 3) Price Technical Acceptability - Factor 1: Technical Capability To be determined technically acceptable, the Offeror must submit a quote that clearly demonstrates the ability to meet the Government's requirements across the following sub-factors: Sub-factor 1: Delivery Schedule.
Eligibility
Set-aside: Small Business Set Aside - Total
Place of performance
Luke Air Force Base, AZ, 85309, USA
Key dates
Posted Sep 1, 2026; Responses due Sep 22, 2026, 2:00 PM UTC; Archive date Oct 7, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.